Attention check
Markets & customers
An attention check is a survey item or embedded task designed to indicate whether a respondent is reading or following a specific instruction. Common forms request a stated answer, detect impossible claims, or test consistency, but each captures only a narrow aspect of response quality.
By The Decision Pattern · Updated
A question to consider
Does this check provide valid evidence of the response behavior we need to detect, and would its use wrongly exclude credible participants?
Why it matters
Careless, automated, confused, or disengaged responses can add noise and bias. A well-designed check supplies one signal for quality review and can reveal confusing instructions or technical presentation problems.
How it works
Choose the failure behavior of concern, design a clear and accessible item, predefine scoring and any exclusion rule, place it without contaminating key measures, inspect false positives, and combine it with response patterns, timing, consistency, and open-text evidence.
How to interpret it
Passing does not prove a case is genuine or thoughtful, and failing can reflect language, disability, device, fatigue, or a bad question. Rates and consequences should be assessed by subgroup and study context.
Common mistake
Using one hidden trick question as an automatic deletion rule, adding so many checks that they change respondent behavior, or refining thresholds after seeing which exclusions produce preferred results.
Put it to work
Pilot with target users, make essential instructions unambiguous, register quality rules before analysis, review flagged cases using multiple indicators, report the number and effect of exclusions, and run results with and without borderline cases.
A practical example
Illustrative example: an instructed-response item flags 4% of cases, but manual review retains half because a mobile rendering defect hid the instruction below the answer choices.
Questions worth asking
Does passing an attention check prove high-quality data?
No. A respondent or bot can pass one item while giving careless, fabricated, inconsistent, or low-effort answers elsewhere.
Should every failed attention check be excluded?
No. Apply predefined rules, inspect technical and accessibility causes, use multiple signals, and show how exclusions affect conclusions.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- Pew Research Center — Two Common Checks Fail to Catch Most Bogus Cases
Attention checks and speeding flags as partial survey-quality indicators that miss many problematic cases and require cautious combined interpretation.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor