Attrition bias
Planning & decisions
Attrition bias is distortion caused when participants, customers, units, or observations lost over time differ systematically in outcome-relevant ways from those retained. It is a form of selection bias in longitudinal evidence.
By The Decision Pattern · Updated
A question to consider
Could the people or units lost to follow-up differ enough from those retained to change the estimated effect or target population?
Why it matters
A panel can look healthier simply because dissatisfied, failed, or hard-to-reach cases disappear. Differential loss can break initial comparability, reduce power, and change which population the final estimate represents.
How it works
Track every sampled unit through each wave, record contact and loss reasons, compare attrition by assignment and baseline predictors, calculate retention with correct denominators, and model how missing outcomes could differ.
How to interpret it
Equal attrition percentages do not guarantee low bias, and unequal percentages do not prove severe bias. Risk depends on relationships among loss, group, baseline variables, and the unobserved outcome.
Common mistake
Reporting only the final respondent count or comparing completers across waves as if they were the original groups. This hides both denominator loss and the characteristics of missing participants.
Put it to work
Design retention before launch, minimize burden, preserve ethical contact options, monitor differential loss, use appropriate weighting or imputation, present a flow table, and run worst-plausible-case sensitivity for key outcomes.
A practical example
Illustrative example: both trial groups begin with 500 customers, but low-usage customers leave the intervention survey at twice the control rate, threatening the comparison.
Questions worth asking
Is attrition bias the same as a low response rate?
Attrition concerns loss after initial inclusion over time; its bias depends on how loss relates to groups and outcomes.
Does equal attrition across groups eliminate bias?
No. Both groups can lose the same proportion but lose systematically different kinds of participants or outcomes.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- NCBI Bookshelf — Reasons for Missing Data
Attrition related to study outcomes as a form of selection bias that can reduce power and distort longitudinal inference.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor