Capable to promise

Cash & operations

Capable to promise (CTP) is an order-fulfilment and scheduling calculation that determines when a customer order can realistically be delivered by checking not only uncommitted finished-goods inventory (Available to Promise), but also finite unallocated production capacity, raw-material availability, and supplier lead times across the bill of materials.

By The Decision Pattern · Updated

A question to consider

When uncommitted finished stock is insufficient, when can our actual finite machine capacity and component inventory build and deliver this order?

Why it matters

Standard Available to Promise (ATP) only checks uncommitted finished goods on the shelf plus already-scheduled master production orders. In make-to-order, assemble-to-order, or capacity-constrained environments where finished stock is not pre-built, ATP either rejects the order or quotes a generic static lead time that ignores whether the shop floor is currently 40% loaded or 110% overloaded.

How it works

When a sales rep or checkout portal requests a delivery date for $X$ units, the CTP engine first checks ATP; for any quantity not covered by uncommitted stock or existing scheduled receipts, it explodes the bill of materials and routing, checks real-time component inventory and open work-center capacity buckets against finite scheduling constraints, and returns the earliest feasible completion and arrival date—placing a temporary capacity and material reservation until the quote is confirmed.

How to interpret it

CTP delivery commitments are only as accurate as the underlying finite capacity calendar, bill of materials, and supplier lead-time tables. If unplanned machine maintenance or unrecorded scrap is missing from the ERP capacity model, CTP will promise dates the plant cannot hit.

Common mistake

Running CTP against infinite-capacity work-center assumptions or stale static vendor lead times, which turns CTP into an expensive guess that double-books bottleneck machines.

Put it to work

Implement CTP for make-to-order and assemble-to-order product lines where capacity load fluctuates, constrain the CTP model only around true bottleneck resources and critical long-lead components, and expire unconfirmed quote reservations automatically.

A practical example

Illustrative example: a customer requests 200 custom hydraulic cylinders; ATP shows only 40 finished units uncommitted, so CTP checks raw rod stock (available) and CNC machining cell load (booked through Tuesday), returning a firm split promise of 40 units tomorrow and 160 units next Friday.

Questions worth asking

What is the difference between Available to Promise (ATP) and Capable to Promise (CTP)?

ATP checks only existing on-hand inventory and already-scheduled production runs, whereas CTP also evaluates uncommitted factory capacity and component stock to schedule new production.

What is Profitable to Promise (PTP) beyond Capable to Promise?

While CTP checks whether an order CAN be built on time, Profitable to Promise also evaluates overtime, expedite freight, and opportunity cost to check whether accepting the order is profitable.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.