Downtime

Cash & operations

Downtime is time within a defined scheduled operating period when a resource is not producing its intended output. It can be planned, such as maintenance or changeover, or unplanned, such as failure, material shortage, system outage, or staffing interruption.

By The Decision Pattern · Updated

A question to consider

Which downtime cause at the constrained resource destroys the most useful output or delivery reliability?

Why it matters

Downtime reduces usable capacity and can delay delivery, raise overtime, increase work in progress, or starve downstream operations. Separating causes prevents teams from treating every lost minute as an equipment problem.

How it works

Define scheduled time and the production threshold, timestamp each stop and restart, classify cause and responsibility consistently, distinguish planned from unplanned loss, and reconcile event duration to total unavailable time.

How to interpret it

Minutes have different economic consequences depending on the bottleneck, buffer, demand, recovery capacity, quality loss, and time of occurrence. Frequency, duration, and lost good output complement the total.

Common mistake

Improving the metric by excluding inconvenient scheduled time or blaming the recorded symptom. A machine may stop because upstream material or an approval is missing, not because the machine failed.

Put it to work

Prioritise downtime at the system constraint by lost contribution and risk, validate cause codes, apply root-cause analysis, schedule preventive work intelligently, and verify sustained recovery.

A practical example

Illustrative example: a line scheduled for 480 minutes loses 35 to failure and 25 to material shortage, giving 420 run minutes and 60 recorded downtime minutes.

Questions worth asking

Should planned maintenance count as downtime?

Report it separately and state the metric boundary; planned maintenance still uses time but can prevent larger unplanned losses.

Is downtime percentage enough to prioritise action?

No. Consider the resource constraint, lost output, duration pattern, quality impact, customer consequences, and repair cost.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor