Fault tree analysis

Planning & decisions

Fault tree analysis is a top-down, deductive method that starts with a precisely defined undesired event and maps combinations of lower-level failures that could cause it using logical gates. It can support qualitative pathway review or quantitative probability analysis.

By The Decision Pattern · Updated

A question to consider

Which combinations of lower-level failures can produce the defined top event, and where will one control change reduce risk most?

Why it matters

Complex failures often require several events or share a common cause. A fault tree makes those pathways visible, tests whether controls are genuinely independent, and identifies combinations where prevention or detection changes system risk.

How it works

Define the top event and system boundary, decompose immediate causes with AND and OR logic, continue to useful basic events, check common-cause and dependency assumptions, validate with experts and evidence, and quantify only with defensible probabilities.

How to interpret it

The tree represents the modeled pathways, not every possible cause. Quantitative results inherit boundary, logic, independence, and probability assumptions; minimal cut sets reveal combinations sufficient to produce the top event.

Common mistake

Using an OR gate where simultaneous failures are required, treating dependent events as independent, or forcing uncertain probabilities into a precise top-event number without sensitivity analysis.

Put it to work

Review logic across disciplines, connect basic events to controls and data, test common-cause scenarios, prioritize influential cut sets, add monitoring or design changes, and revise the tree after incidents or architecture changes.

A practical example

Illustrative example: service loss occurs if the sole gateway fails OR if both independent regional applications fail; the tree exposes gateway redundancy as the highest-impact design action.

Questions worth asking

How is fault tree analysis different from FMEA?

Fault trees work downward from one undesired event; FMEA works across functions and failure modes to examine their effects.

Can a fault tree calculate failure probability?

Yes, when logic and event probabilities are defensible and dependencies are modeled; otherwise qualitative pathway analysis is safer.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor