First-pass yield
Cash & operations
First-pass yield is the proportion of units that complete a defined process correctly the first time without scrap, rerun, retest, return, or repair. It is good first-pass units divided by units entering the process, using a governed boundary and defect rule.
By The Decision Pattern · Updated
A question to consider
Which first-time failure consumes the most constrained capacity or creates the greatest customer risk?
Why it matters
Final yield can look healthy after hidden rework. First-pass yield exposes the process's initial capability and the time, capacity, cash, and delivery risk consumed by correcting failures.
How it works
Define entry, exit, unit, and acceptance criteria; count every entering unit once; identify units passing without any disqualifying intervention; divide good first-pass units by total entrants; and segment by product, shift, supplier, or defect.
How to interpret it
A lower result points to quality loss but not its cause. Mix, inspection sensitivity, measurement error, and rework definitions affect the rate; pair it with defect type, severity, cost, and customer outcome.
Common mistake
Removing reworked units from the denominator, counting a retest as first pass, or averaging stage percentages. These choices inflate performance and can conceal compounding losses across a process.
Put it to work
Lock the counting rule, trace the dominant first-pass failures, investigate their root causes, test corrective action, and verify that yield improves without weaker inspection or shifted defects.
A practical example
Illustrative example: 920 of 1,000 submitted units pass without rework, so first-pass yield is 920 ÷ 1,000 = 92%; repaired units remain failures for this measure.
Questions worth asking
Are repaired units included as successful first-pass units?
No. They may become acceptable final output, but requiring repair means they did not pass the first time.
How does first-pass yield differ from final yield?
First-pass yield excludes rework and retest, while final yield may count corrected units that ultimately meet requirements.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- ASQ — Quality Glossary
Definitions and formulas for first-pass yield and overall equipment effectiveness, including availability, performance, and quality components.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor