Hazard and operability study
Planning & decisions
A hazard and operability study, or HAZOP, is a structured team examination of a process or system that applies guide words to design parameters. The resulting deviations prompt analysis of causes, consequences, existing safeguards, and required actions.
By The Decision Pattern · Updated
A question to consider
What credible deviations from design intent could create harm or operating failure, and are the safeguards demonstrably adequate?
Why it matters
Complex systems can fail through combinations or deviations that no discipline sees alone. A systematic node-by-node review uses operational, engineering, control, and safety knowledge to reveal hazards and performance problems before or after change.
How it works
Define scope and design intent, divide the system into nodes, select parameters, combine them with guide words such as no, more, less, or reverse, determine credible causes and consequences, credit safeguards carefully, and record actions.
How to interpret it
A HAZOP identifies scenarios; it does not automatically quantify risk or prove design safety. Quality depends on current documentation, team expertise, facilitation, session discipline, and completion of actions.
Common mistake
Treating the meeting as a checklist, skipping deviations because they seem unlikely, crediting safeguards without independence or proof, or closing the report while recommendations remain unverified.
Put it to work
Appoint a trained facilitator and recorder, provide accurate diagrams, include operators and maintainers, state assumptions, time-box sessions without rushing nodes, rank follow-up consistently, and verify actions before startup or change approval.
A practical example
Illustrative example: applying reverse flow to a transfer-line node reveals contamination from backpressure, an ineffective check valve test, and a requirement for monitored isolation.
Questions worth asking
What do HAZOP guide words do?
They combine with process parameters to generate deviations systematically, prompting the team to examine causes, consequences, and safeguards.
When should a HAZOP be repeated?
Review is warranted after material design or operating changes, new hazard evidence, incidents, or when the documented study becomes outdated.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- IEC 61882 — Hazard and Operability Studies Application Guide
HAZOP studies using guide words, including definition, preparation, examination sessions, documentation, and follow-up.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor