Minimax regret

Planning & decisions

Minimax regret is a decision rule that selects the option whose worst opportunity loss is smallest across the states of the world being considered. Regret is the gap between an option's result and the best result that could have been achieved in the same state.

By The Decision Pattern · Updated

A question to consider

Which option limits our largest foregone benefit across plausible futures when reliable probabilities cannot support a single expected-value ranking?

Why it matters

When probabilities are too contested for expected-value analysis, decision-makers can still ask how badly each strategy might underperform the state-specific best choice. The rule emphasizes protection from a deeply regrettable miss.

How it works

Create an option-by-state performance table, identify the best result in each state, subtract every option's result from that benchmark, find each option's maximum regret, and choose or inspect the option with the lowest maximum.

How to interpret it

The answer depends on which futures, options, metric, and direction of value were included. It is conservative about opportunity loss but does not represent likelihood, absolute affordability, multiple objectives, or risk tolerance by itself.

Common mistake

Calling the worst raw outcome regret. Regret is relative to the best option in the same future, so a poor absolute outcome and a large opportunity loss are different quantities.

Put it to work

Use decision-relevant futures, retain units, test missing extremes, compare the minimax result with expected value and constraints, inspect near-ties, and document which omitted probability judgments made the rule appropriate.

A practical example

Illustrative example: three capacity plans have maximum regrets of $8 million, $3 million, and $5 million across four demand futures, so the second plan is preferred by minimax regret.

Questions worth asking

Does minimax regret use probabilities?

The basic rule does not require them; it compares opportunity losses across included states without weighting those states by likelihood.

Is minimax regret always risk averse?

It is cautious about maximum opportunity loss, but its behavior differs from minimizing worst outcome or maximizing expected utility.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor