P-value
Planning & decisions
A p-value is the probability, assuming the null hypothesis and test model are correct, of obtaining a test statistic at least as incompatible with the null as the observed statistic. It is not the probability that the null is true.
By The Decision Pattern · Updated
A question to consider
How incompatible are the observed data with the specified null model, and is the estimated effect large and credible enough to act on?
Why it matters
P-values can discipline evidence assessment when the test was planned and assumptions hold, but their compact form invites overclaiming. Decisions also need effect size, uncertainty, design quality, and the cost of errors.
How it works
Specify the null, statistic, direction, sampling model, and analysis before viewing outcomes. Calculate the tail probability under that model and compare it with a prespecified threshold while preserving the exact value.
How to interpret it
A small p-value indicates data relatively unusual under the tested null and model. It does not measure practical importance, replication probability, bias, data quality, or the probability that a causal claim is correct.
Common mistake
Saying p equals 0.03 means a three percent chance the null is true. The calculation conditions on the null; it does not assign posterior probabilities to competing explanations.
Put it to work
Report the estimate, compatible interval, exact p-value, sample and exclusions, all planned outcomes, assumption checks, and multiplicity handling. Base action on material effect thresholds and consequences, not a binary label alone.
A practical example
Illustrative example: under a prespecified no-lift null, an observed test statistic yields p=0.03; the result crosses alpha 0.05 but still needs magnitude and bias review.
Questions worth asking
Is a p-value the probability that the result happened by chance?
No. It is a tail probability calculated under a specified null model, not a probability assigned to a causal story.
Does p below 0.05 prove practical importance?
No. Practical importance depends on effect magnitude, uncertainty, costs, benefits, and design credibility in the target operating context.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- OpenStax — Rare Events, the Sample, Decision and Conclusion
A p-value as the probability, under the null hypothesis, of a result at least as extreme as the observed result.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor