Post-stratification
Markets & customers
Post-stratification is a survey-weighting adjustment applied after data collection that aligns weighted sample counts in defined cells with known population totals. It uses variables available for both respondents and a credible external population benchmark.
By The Decision Pattern · Updated
A question to consider
Which verified population cells should the completed sample match, and do they explain outcome differences relevant to this estimate?
Why it matters
Even a probability sample can finish with demographic or operational imbalance from chance and nonresponse. Aligning relevant cells can reduce bias and make totals reflect the target population structure more closely.
How it works
Choose categorical variables related to response and outcomes, obtain compatible population totals, form adequately populated cells, compute adjustment factors, combine them with base weights, inspect extremes, and estimate variance with the final weights.
How to interpret it
Post-stratification is one component of a broader weighting process. It addresses imbalance within the chosen cells under assumptions; it does not correct measurement error, unknown categories, or outcome differences remaining within cells.
Common mistake
Creating many sparse cross-classified cells until some respondents receive enormous weights, or using benchmark definitions, dates, geographies, and eligibility rules that do not match the survey population.
Put it to work
Preselect defensible variables, harmonize benchmark definitions, collapse sparse cells transparently, trim only with sensitivity analysis, inspect effective sample size, and validate estimates against outcomes not used to build the weights.
A practical example
Illustrative example: a sample is 60% group A and 40% group B while the population is 40% and 60%; simple cell factors are 0.667 and 1.5 before normalization choices.
Questions worth asking
Is post-stratification the same as stratified sampling?
No. Stratified sampling controls selection before collection; post-stratification adjusts analysis weights after observing the achieved sample.
Is raking a form of post-stratification?
Raking is a related calibration method that iteratively matches marginal totals when full cross-classified cell totals are impractical.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- Pew Research Center — Survey Methodology
Post-stratification and iterative weighting to balance a completed sample against credible population distributions.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor