Sample size
Markets & customers
Sample size is the number of observations, participants, cases, or experimental units included in an analysis. The effective information can be smaller than the raw count because of weighting, clustering, missing data, imbalance, and study design.
By The Decision Pattern · Updated
A question to consider
How much valid information does this design need to resolve the primary estimate or comparison at useful precision?
Why it matters
Too little information may leave a decision unresolved, while unnecessary collection wastes time and exposes more people or data. Planning should connect the required size to the intended estimate, comparison, and consequence.
How it works
Define the primary outcome, population, design, expected variability or event rate, desired precision or detectable effect, confidence and power where applicable, subgroup needs, nonresponse, attrition, clustering, and analysis method.
How to interpret it
A larger sample usually reduces random sampling uncertainty under the same sound design, but it does not repair bias or invalid measurement. Report both total and decision-relevant subgroup counts.
Common mistake
Using a universal online sample-size number without specifying population inference, expected effect, design effect, response rate, eligibility, exclusions, or the analysis to be performed.
Put it to work
Document the calculation inputs before collection, set recruitment and quality rules, and define what happens if the achieved effective sample cannot answer the decision.
A practical example
Illustrative example: a survey recruits 1,200 people, but the priority buyer subgroup contains 96 weighted respondents. The overall count cannot provide the subgroup with the same precision as the full sample.
Questions worth asking
Does doubling sample size halve the margin of error?
Usually no. Under simple assumptions, random sampling error shrinks roughly with the square root of sample size, and complex designs alter that relationship.
Does sample size depend on population size?
It can, especially when sampling a substantial share of a finite population, but precision, variability, design, and subgroup needs often matter more.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- Pew Research Center — Variability of survey estimates
The relationship among sample size, sampling variability, weighting, precision, and margin of error.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor