the decision pattern.TDP.

Step-down allocation method

Cash & operations

The step-down allocation method, also called the sequential method, is a cost-accounting procedure that allocates support-department costs (such as IT, facilities, and HR) in a predefined one-way sequence to both remaining support departments and operating production departments, closing each support department once its pool is distributed.

By The Decision Pattern · Updated

A question to consider

Which support department provides the largest share of service to other support units, and how does sequential allocation change the full cost of our operating lines?

Why it matters

Support departments do not just serve revenue-generating units; they also consume each other's services—IT occupies floor space maintained by Facilities, while Facilities uses laptops supported by IT. The direct allocation method ignores inter-support consumption completely, whereas the step-down method captures the primary direction of inter-support usage without solving simultaneous equations.

How it works

Rank support departments in a sequence—typically starting with the department that provides the highest percentage of its total service to other support departments (or has the largest dollar cost). Allocate the first support department's costs across all other support AND operating departments based on its cost driver. Close the first department so no subsequent costs flow back into it, then allocate the second support department's total pool (its own direct cost plus the share it just received from Step 1) across the remaining open departments.

How to interpret it

The resulting cost per operating unit depends on the chosen ranking sequence when two support departments heavily serve each other. And as with all overhead allocations, step-down figures measure full absorption cost, not the immediate cash savings if a department is downsized.

Common mistake

Re-allocating costs back into a support department that has already been closed in an earlier step, or choosing an arbitrary department sequence that shifts overhead away from a favored division.

Put it to work

Rank support departments consistently by the share of services provided to other support units, document the driver base for each step, and check whether switching to the reciprocal method materially changes product or clinic profitability.

A practical example

Illustrative example: Facilities ($300,000) provides 20% of its square footage to IT and 80% to two manufacturing lines; under step-down allocation, $60,000 of Facilities cost flows into IT first (raising IT's pool from $200,000 to $260,000), and IT's combined $260,000 is then allocated across the two manufacturing lines by ticket volume.

Questions worth asking

How does the step-down method differ from the direct allocation method?

The direct method ignores services provided between support departments and allocates straight to operating units, whereas the step-down method allocates sequentially through remaining support departments.

Which support department should be allocated first in the step-down method?

Standard practice starts with the support department that renders the highest percentage of its total services—or largest dollar value of service—to other support departments.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.

Put the thinking to work.

Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.

Find your reportExplore Executive Editor