Type I error
Planning & decisions
A Type I error occurs when a statistical test rejects a null hypothesis that is actually true. Its prespecified long-run probability under the null is alpha when the test assumptions and decision procedure hold; it is often called a false positive.
By The Decision Pattern · Updated
A question to consider
How costly is acting on a false positive, and does our complete testing procedure control that risk at an acceptable level?
Why it matters
A false positive can trigger rollout, investment, investigation, or policy change when the measured difference is chance variation under the tested model. The acceptable rate depends on the cost and reversibility of that action.
How it works
Define the null, outcome, analysis, decision threshold, and multiplicity controls before examining results. Choose alpha in context, protect data quality and assumptions, and report estimates and uncertainty rather than presenting the threshold alone.
How to interpret it
Alpha is not the probability that a particular rejected null is true, and a p-value is not that probability either. Repeated testing, selective reporting, optional stopping, and model violations can raise actual false-positive risk.
Common mistake
Running many outcomes and segments, then treating any p-value below 0.05 as confirmatory without adjustment or disclosure. The nominal threshold no longer describes the full decision procedure.
Put it to work
Prespecify primary tests, limit or adjust multiplicity, separate confirmatory from exploratory findings, examine practical effect size and harms, replicate important results, and set stronger evidence thresholds for costly irreversible actions.
A practical example
Illustrative example: an ineffective checkout change appears to increase conversion and crosses the prespecified threshold, so launching it would be a Type I error under the study model.
Questions worth asking
Is alpha the probability the null hypothesis is true?
No. Alpha is the long-run rejection rate conditional on a true null under the specified test and assumptions.
Does a 5% threshold mean one in twenty published findings is false?
No. That proportion also depends on prior truth rates, power, selection, multiplicity, assumptions, and reporting behavior.
Sources & further reading
Explore the background to this term. Worked examples on this page are illustrative.
- OpenStax — Outcomes and Type I and Type II Errors
Type I error as rejecting a true null hypothesis, Type II error as failing to reject a false null, and statistical power as one minus beta.
Source checked
Put the thinking to work.
Explore the question with Research Reports. Write, model and review your decision paper with Executive Editor.
Find your reportExplore Executive Editor