Work in progress

Cash & operations

Work in progress is material or service effort that has entered production but is not yet a completed, accepted output at a stated time. In accounting, its carrying amount follows applicable cost and recognition rules; operationally, it is unfinished flow between process stages.

By The Decision Pattern · Updated

A question to consider

Where is unfinished work accumulating, why is it blocked, and what action releases cash and throughput?

Why it matters

Excess work in progress consumes cash, space, handling, attention, and lead time while hiding defects and bottlenecks. Too little at a constrained step can also starve throughput.

How it works

Define entry and completion boundaries, count or estimate units at each stage, record completion status and cost consistently, reconcile movements, and track ageing, queues, blocked work, rework, and ownership.

How to interpret it

A rising balance may reflect planned growth, longer cycle time, larger batches, shortages, quality problems, or accounting cut-off. Value and physical units answer different questions and should not be substituted casually.

Common mistake

Calling every purchased component work in progress or assuming a higher balance means productive capacity. Inventory waiting for a missing part can consume cash without moving any closer to sale.

Put it to work

Map work by stage and age, protect the bottleneck without flooding other steps, cap queues where suitable, resolve blocked items, and connect completion assumptions to revenue and cash timing.

A practical example

Illustrative example: 300 assemblies have entered production; 120 await testing and 40 failed inspection, so only accepted finished units leave the defined work-in-progress population.

Questions worth asking

Is work in progress the same as finished inventory?

No. Work in progress has started but has not crossed the defined completion and acceptance boundary for finished output.

Why can reducing work in progress shorten lead time?

Smaller queues reduce waiting and expose blockages, provided the constrained resource remains supplied and variability is managed.

Sources & further reading

Explore the background to this term. Worked examples on this page are illustrative.