Fermi Market Sizing Guide: Combining Uncertain Factors with Explicit Dependence

Build an illustrative market-size distribution from positive factors, distinguish scenario bounds from probability intervals, and test dependence explicitly.

The short answer

For a product of jointly lognormal factors, add their log means and all log variances and covariances. Independence permits dropping covariance terms, but it must be justified. Report the resulting interval as conditional on the model and input calibration; multiplying low and high scenarios is a different, sometimes useful, stress test.

Key takeaways

  • State whether input ranges are quantiles, bounds or scenarios.
  • Include covariance unless independence is justified.
  • Distinguish the product mean from its median.
  • Check bounded shares and structural errors separately.

Direct answer: For a product of jointly lognormal factors, add their log means and all log variances and covariances. Independence permits dropping covariance terms, but it must be justified. Report the resulting interval as conditional on the model and input calibration; multiplying low and high scenarios is a different, sometimes useful, stress test.

Define the quantity and the uncertainty

Specify whether the estimate is potential annual spend, obtainable revenue or actual demand in a particular year. A count of eligible organizations multiplied by an adoption share and contract value does not establish the company’s achievable sales. Capacity, competitive share and timing may require additional factors.

Distinguish hard bounds, scenario inputs and probability quantiles. A team’s low and high guesses do not become a calibrated 90% interval simply by labeling them. Record the population, date, source and reasoning for each factor. NIST’s lognormal reference defines the distribution; it does not validate any commercial inputs.

Combine factors on a stated log scale

Assume positive factors whose logarithms are jointly normal. If L and H are their fifth and ninety-fifth percentiles, log mean is [ln(L)+ln(H)]/2 and log standard deviation is ln(H/L)/(2×1.644854). The factor median is the square root of L×H.

For the product, log means add. Log variance is the sum of individual variances plus twice every pairwise log covariance. With independence, only the variance sum remains. The product median is the product of factor medians; the mean is larger by the multiplier exp(combined variance/2). These quantities answer different questions.

A fully hypothetical market calculation

Assume fifth-to-ninety-fifth percentile ranges of 15,000–27,000 organizations, 8%–18% adoption and $6,000–$13,000 annual contract value. Their log standard deviations are approximately 0.178674, 0.246505 and 0.235033. Under independence, combined log variance is 0.147930 and the median market is $21.3283 million.

The conditional central 90% interval is approximately $11.3293 million–$40.1520 million. The mean is $22.9656 million. Multiplying all low values gives $7.2 million and all highs $63.18 million. Those simultaneous endpoint scenarios are not the same probability statement as the model interval; calling them invalid or automatically unrealistic would be wrong.

If adoption and contract value instead have log correlation +0.5, with the company-count factor independent, combined log variance rises to 0.205867. The interval becomes approximately $10.1120 million–$44.9858 million. Negative dependence could narrow it. The sign and strength must reflect the economic mechanism, such as price affecting adoption, rather than a preference for a narrow answer.

Use the result as a research map

A lognormal adoption factor can exceed 100%, which is impossible. Here that upper tail is tiny, but other inputs may require a bounded distribution such as a beta or logit-normal model. Counts also may need discrete treatment. Use simulation with documented dependencies when the analytic approximation is unsuitable.

Inspect missing market segments, double-counted organizations and systematic source bias separately: an elegant interval does not repair structural mistakes. Prioritize research by how much it could change the decision relative to its cost, not only by the largest variance contribution. A market-size interval clearing a threshold is evidence within the assumptions, not proof of profitable entry.

Continue the analysis

Your checklist

  • Define the market and year precisely.
  • Document input quantile judgments.
  • Test plausible dependence structures.
  • Compare research cost with decision sensitivity.

Sources & further reading

  1. NIST: Lognormal distribution

    Defines lognormal parameters, median and distribution; does not validate the illustrative market assumptions.

Browse more guides
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor