the decision pattern.TDP.

How do you archive the evidence behind a published guide?

Create an evidence inventory tied to the published guide version, preserve permitted source files and calculation inputs, and record source dates, retrieval dates, locations and capture limits. Generate and retain file-integrity information, protect restricted material and test recovery. Keep corrections and later source versions linked to the original package rather than silently replacing it.

The short answer

Create an evidence inventory tied to the published guide version, preserve permitted source files and calculation inputs, and record source dates, retrieval dates, locations and capture limits. Generate and retain file-integrity information, protect restricted material and test recovery. Keep corrections and later source versions linked to the original package rather than silently replacing it.

Key takeaways

  • The archive should identify the source version actually used for publication.
  • A stored page can preserve an unsupported claim as faithfully as a supported one.
  • File hashes help detect changes; they do not prove the truth or authorship of the content.
  • A usable archive requires retrieval, access and correction procedures as well as storage.

A guide cites a dataset and a technical report. A year later, the dataset has been revised, the report URL redirects to a new edition and nobody can find the spreadsheet behind the worked example. The links still look credible, but a reviewer cannot reconstruct what supported the published version.

An evidence archive preserves a specific publication’s supporting materials and the route by which they were used. Its purpose is to make later checking and correction possible, not to declare every saved source permanently true.

Choose the publication version to preserve

Identify the guide by its stable slug or record identifier and the content version being reviewed. Keep the publication date separate from the date the archive package is assembled.

Save a readable copy of the published body and its metadata, including the citations and calculation assumptions. If the publishing system stores a content checksum, record which fields it covers. A checksum of the body alone will not detect an altered byline or a changed source list.

Link the archive package to the review record for that exact version. A review attached to an earlier draft should not silently certify later revisions.

Create a source inventory before collecting files

Fields for a publication evidence manifest
FieldWhy it matters
Source identifier and original locationConnects the saved object to the document or dataset cited
Publication, revision and retrieval datesDistinguishes when evidence was issued from when it was consulted
Relevant page, table or passageLocates the material that supports the specific claim
Population, period and geographic scopePreserves the boundaries needed to interpret the evidence
Capture method and omissionsExplains what the saved copy includes and what it does not
Rights and access conditionsRecords whether the material can be stored, shared or only referenced
File path, format and integrity valueSupports retrieval and comparison with the preserved object
Dependent claims and calculationsShows which parts of the guide need review if the source changes

Use explicit unknown values where dates or permissions are not established. Guessing a publication date from a web footer creates misleading precision.

Preserve only what the arrangements allow

For an openly licensed dataset, retain the permitted source file, its license information and the exact subset or query used. For a report, preserve a copy where permitted or retain a precise bibliographic reference and access route.

Restricted client material belongs in an appropriately controlled store. A public citation list should not expose private filenames, participant details, credentials or confidential attachments.

If copying is not permitted or the position is uncertain, record the limitation and establish a lawful review route. An editorial archive is not an automatic exception to source rights or data-handling obligations.

Describe the limits of a web capture

A saved page may omit content loaded after interaction, linked attachments, filters, embedded charts or explanations behind an expandable panel. A screenshot can preserve appearance while losing searchable text and underlying values.

Check the captured material against the passage actually used. Record the selected filters and time period for an interactive dataset. If the export excludes a footnote that qualifies the result, preserve that context through a permitted accompanying record.

Keep the original URL and retrieval date even when a local copy exists. An archive location helps a reviewer inspect the historical evidence; the live source may reveal a correction that also needs attention.

Establish integrity information

The Library of Congress describes recording fixity information early and monitoring it through manifests and check logs. A small editorial team can apply the same principle by recording a suitable file hash when it accepts an object into the archive and comparing it during later retrieval.

Record the algorithm as well as the resulting value. Keep the manifest under controlled change management so an unexplained file replacement cannot be disguised by casually regenerating the reference value.

The Library’s digital-preservation glossary describes fixity in terms of change between points in time. A matching hash is evidence about the bytes compared. It does not prove that the original author was credible, the claim was correct or the source was interpreted appropriately.

Test a recovery scenario

Consider a fictional package containing a public report, a permitted dataset export, a restricted interview reference and an original calculation workbook. Ask an authorized reviewer to recover the materials needed to check one published calculation.

The reviewer should be able to identify the correct report edition, find the dataset’s period and filter settings, distinguish the illustrative assumptions from reported observations and reproduce the relevant arithmetic.

Test access through the intended reader’s permissions. An archive that works only for its creator can fail as soon as that person changes roles. Document the custodian and an approved route for resolving access problems.

If a file is missing or its integrity value differs, investigate before replacing it. Compare preserved copies, identify authorized transformations and record the recovery action. Keep the original check result in the log.

Handle corrections as new versions

When a source is revised, retain the relationship between the old and new evidence. Determine which claims depend on the changed material and whether the published guide needs a correction, qualification or withdrawal of a conclusion.

Do not overwrite the historical package with a new dataset and leave the original publication date as the only timestamp. That makes the old result impossible to explain.

Set review and retention practices according to the content’s importance, source volatility, permissions and actual organizational requirements. Preservation is an ongoing responsibility, but keeping every sensitive source forever is not a substitute for a reasoned policy.

Connect preservation to editorial judgment

Use a key assumptions check when reusing archived evidence, and retain material limits such as sampling bias. Read why a randomized study can answer the wrong question and why an archived page does not establish truth.

Prepare the publication note and source inventory alongside the draft in the executive editor. The evidence and research methods hub connects preservation with the substantive checks that make evidence useful.

Sources & further reading

  1. Library of Congress: Data Integrity Management

    Describes establishing file fixity early, comparing recorded hash values through manifests and retaining logs of integrity checks.

  2. Library of Congress: Digital Collections Management Glossary

    Defines fixity as whether a digital object has changed between points in time and distinguishes preservation metadata and format migration.

Browse more guides
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor