the decision pattern.TDP.

How do you build an assumption register for a financial model?

Create one controlled record for each material input, including its definition, unit, model location, source or rationale, owner, uncertainty range, and review trigger. Distinguish observed facts from estimates and management choices. Link changes in the register to the model outputs and decisions they affect so reviewers can challenge the reasoning without hunting through formulas.

The short answer

Create one controlled record for each material input, including its definition, unit, model location, source or rationale, owner, uncertainty range, and review trigger. Distinguish observed facts from estimates and management choices. Link changes in the register to the model outputs and decisions they affect so reviewers can challenge the reasoning without hunting through formulas.

Key takeaways

  • Record what an input means as well as its numerical value.
  • Separate source evidence, estimates, and management choices.
  • Prioritize uncertain inputs that could change the decision.
  • Preserve the previous value and reason when an assumption changes.

A financial model can show its formulas clearly while leaving its most important judgments hidden. Reviewers may be able to trace a revenue total to a volume cell but still not know what the volume represents, who supplied it, when it was observed, or whether it is a measured fact or a planning assumption.

An assumption register closes that gap. It is a compact record of the inputs that materially affect the decision. The register should make a model easier to challenge and maintain, whether the analysis lives in a spreadsheet, a planning application, or a calculation appendix. It is useful only when it stays connected to the actual model.

Define the boundary of the register

Begin with inputs that could alter the recommendation, the funding requirement, or the timing of a commitment. Include important nonnumeric assumptions, such as whether a supplier can start before a planned launch or whether a customer contract allows the proposed service. Those conditions can determine whether a numerical forecast is meaningful.

Do not copy every formula into the register. A formula explains how values are combined; an assumption explains a value or condition that the model relies on. The distinction helps reviewers focus on judgments rather than reproducing the spreadsheet’s calculation engine in another document.

The UK Green Book 2026 emphasizes making assumptions explicit and testing uncertain inputs through sensitivity analysis. Its public-appraisal rules are not a substitute for a company’s financial policies. Here, the transferable principle is transparency about the reasoning behind inputs and ranges.

Give each material input a stable identity

Assign an identifier such as VOL-01 to the assumption, then link it to the relevant model cell, named range, or calculation. A stable identifier is more useful than a row number that changes whenever someone inserts a line. The same assumption may feed several outputs, so record those dependencies rather than creating independent copies with slightly different values.

Core fields in a financial assumption register
FieldWhat to record
Definition and unitExactly what is counted, measured, or assumed
Value and periodCentral value, applicable period, and currency or measurement basis
Evidence statusObserved fact, estimate, contractual condition, or management choice
Source and ownerSpecific evidence reference and person responsible for validation
Range and dependenciesAlternative values and inputs that must change with them
Review triggerAn event or date that requires reassessment

Write definitions tightly. Monthly volume could mean orders booked, jobs delivered, invoices issued, or cash collected. Those measures belong in different parts of a model. If the source measures bookings and the formula requires completed jobs, the conversion itself becomes an assumption that needs an owner and a rationale.

Separate evidence from chosen planning values

An observed average, a vendor quotation, and a target set by management are different kinds of input. Record them accordingly. A quotation may have scope exclusions or an expiry date. An observed average may cover a different customer mix. A target may be useful for planning while having little empirical support as a forecast.

For each input, retain a specific source reference or explain why it is an assumption. A link to a broad company homepage does not support a particular price or operating cost. If the source is an internal document, identify the version and location available to authorized reviewers rather than placing sensitive material in a public appendix.

Do not label an input verified merely because it has a source. Verification includes checking the unit, period, scope, and relevance to the calculation. A correctly transcribed number can still be unsuitable for the decision if its population or commercial definition differs from the model.

Use sensitivity to choose what deserves attention

Consider an illustrative service model with an initial investment of 90,000 currency units. Assume 200 completed jobs per month, a price of 150 per job, a variable cash cost of 60 per job, and fixed monthly cash costs of 12,000. Monthly net cash before recovering the investment is 200 × (150 − 60) − 12,000 = 6,000.

Under those simplified assumptions, undiscounted payback is 90,000 ÷ 6,000 = 15 months. If volume is only 150 jobs while the other inputs remain unchanged, monthly net cash falls to 1,500 and simple payback becomes 60 months. These are constructed calculations, not a forecast, benchmark, or recommended investment threshold.

The example shows why the volume assumption deserves attention. A modest-looking change in one input can substantially alter the output when fixed costs absorb much of the contribution. The register should therefore identify the evidence behind completed-job volume, its uncertainty, and the operational conditions needed to achieve it.

Simple payback also omits discounting and can hide cash-timing differences. This illustration excludes tax, financing, and working-capital requirements; a complete investment appraisal must address the cash flows relevant to its decision. If customers pay after delivery, a separate collection schedule is needed. If capacity expands in steps, fixed costs may not remain constant as volume changes. Document these limitations beside the output rather than leaving them implicit in a footnote nobody reads.

Keep scenarios internally consistent

A one-input sensitivity test isolates a driver. A scenario represents a connected set of conditions. If lower volume also changes staffing, purchasing terms, or service mix, record those relationships. Do not describe a collection of unrelated worst values as a coherent downside forecast without explaining why they could occur together.

The guide on consistent downside scenarios develops this distinction. For the register, add a dependency field and link related assumption identifiers. This makes it easier to see when changing one value requires a second change elsewhere in the model.

Assign ownership and refresh triggers

Ownership means responsibility for keeping the input defensible, not authority to choose the most favorable number. A commercial lead might own pipeline conversion evidence; operations might own delivery capacity; finance might own cash timing and model consistency. The decision sponsor should understand which important assumptions remain unresolved.

Use review triggers that reflect the input’s behavior. A supplier price should be revisited when the quotation expires or the scope changes. A volume estimate may need review after a pilot or a material channel change. Updating every assumption on the same calendar can waste effort on stable inputs while leaving important changes unexamined.

Preserve the change history

When an input changes, record the old value, new value, date, reason, supporting evidence, and affected decision. Keep prior approved model versions available to the appropriate reviewers. A revised forecast should not erase the assumptions under which an earlier commitment was made.

Before circulation, ask a reviewer to select one important output and trace it through formulas to the register and source. Then ask which unresolved assumption could reverse the recommendation. Continue through the capital allocation hub, consult the assumption register definition, and use the Editor to organize the decision paper and its supporting calculations. The related investment memo guide explains how to preserve those caveats in executive communication.

Sources & further reading

  1. HM Treasury: The Green Book 2026

    The guidance calls for transparent assumptions, explanations of the assumptions behind estimates and ranges, and sensitivity testing of uncertain assumptions. Its public-appraisal rules are not presented here as company valuation requirements.

Browse more guides
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor