How do you distinguish sensitivity analysis from a scenario forecast?
Use sensitivity analysis to inspect how results change when selected inputs vary, and scenario analysis to examine a coherent combination of conditions. A forecast adds a claim about an expected future and needs an appropriate evidential basis. Keep these purposes and labels separate, even when they use the same financial model.
The short answer
Use sensitivity analysis to inspect how results change when selected inputs vary, and scenario analysis to examine a coherent combination of conditions. A forecast adds a claim about an expected future and needs an appropriate evidential basis. Keep these purposes and labels separate, even when they use the same financial model.
Key takeaways
- A one-input test isolates a relationship but may not describe a plausible future.
- A scenario changes linked assumptions to represent an explicit operating story.
- A switching value identifies a threshold under stated conditions, not the likelihood of crossing it.
- Neither a downside case nor a sensitivity range is automatically a probability interval.
A spreadsheet contains a base case, a low case, and a high case. The team calls all three forecasts, even though the low case simply reduces one input by an arbitrary amount. Another reviewer interprets the range as the interval in which results will probably fall.
These interpretations require different evidence. Within financial analysis, the method should be chosen and labeled according to the question it can answer.
Start with the decision question
If the question is which assumption has the strongest effect on the result, an isolated sensitivity test can help. If the question is how the business behaves during a specified downturn, a coherent scenario is more appropriate.
If the question is what the organization expects to happen, a forecast needs evidence and a method for that expectation. A reference case can support a discussion without automatically being the most likely future.
The Green Book 2026 discusses sensitivity analysis, switching values, and scenarios as ways to examine uncertainty. The commercial example here uses those distinctions in a simplified model.
Use one reference model for the comparison
Assume a fictional annual project sells and delivers 800 units at 200 each. Variable cost is 120 per unit, and listed fixed costs are 50,000. Selected contribution is 14,000.
The model excludes taxes, financing, capital expenditure, timing, and other unlisted costs. It is deliberately small so the relationship between the methods remains visible.
Record the reference inputs and their status in an assumption register. In a real analysis, distinguish observed values, contractual terms, estimates, and planning assumptions.
Use sensitivity to isolate an input relationship
Change quantity to 600 while holding the reference price and costs fixed. Selected contribution becomes minus 2,000. This shows the model’s response to that quantity change under the other stated conditions.
Reset the reference case before the next test. Reducing price to 180 while keeping quantity at 800 and costs unchanged also produces minus 2,000. Raising variable cost to 130 on its own produces 6,000.
| Test | Changed input | Selected contribution |
|---|---|---|
| Reference | None | 14,000 |
| Quantity only | 600 units | −2,000 |
| Price only | 180 per unit | −2,000 |
| Variable cost only | 130 per unit | 6,000 |
The test sizes differ. These results do not prove that quantity and price are equally uncertain or equally important in the real business. Explain why the chosen changes are relevant before ranking them.
Recognize what holding other inputs fixed means
A price change may affect demand, and a quantity change may affect supplier discounts or capacity. Holding those variables fixed is an analytical choice that isolates one relationship.
That choice can be useful even if the isolated combination would not persist in practice. The limitation is interpretive: do not describe the result as a complete future state without considering the linked effects.
More extensive sensitivity analysis can vary several inputs or explore broader ranges. One-at-a-time testing is an accessible starting method, not the definition of every sensitivity technique.
Use a scenario to represent linked conditions
Suppose a fictional downturn reduces quantity to 600, requires a price of 180 on remaining sales, and removes a supplier discount so unit cost rises to 130. Fixed commitments remain at 50,000 during the year.
The combined selected contribution is minus 20,000. The result follows a stated operating story rather than a collection of independent pessimistic edits.
A scenario needs an explanation for each link and a time horizon. The guide on building a coherent downside scenario addresses that construction in more detail; the important distinction here is that linked changes answer a different question from the isolated tests.
Calculate a switching value under explicit conditions
At the reference price and unit cost, the quantity that makes selected contribution zero is 625 units: 50,000 divided by the eighty-unit contribution per sale.
This threshold is conditional. Under the downside price of 180 and unit cost of 130, the equivalent quantity is 1,000. The threshold moves because the relationship changes.
Neither calculation says how likely the threshold is to be crossed. It identifies where a stated decision measure changes sign while the specified conditions hold.
For an investment decision, the relevant threshold might concern net present value, a funding limit, or preference between alternatives rather than zero annual contribution. Define that measure before solving for a switching value.
Do not turn scenarios into probability claims by labeling them
Calling a case base, optimistic, or pessimistic does not establish its probability. An expected forecast needs a defensible basis for the inputs and, where used, the weighting of outcomes.
A scenario range also does not automatically contain every plausible result. The modeled downside can omit an important dependency, a more severe event, or a management response that changes the outcome.
State what the analysis explores and what it leaves unmodeled. If probabilities are unavailable, a clear conditional result is more useful than an invented expected value.
Use the methods together without blurring them
Sensitivity can identify which assumptions deserve more research. Scenarios can test whether the chosen option remains workable across coherent conditions. Switching values can reveal the boundary at which a decision needs to change.
The guide on reversible and irreversible investments helps connect those findings to staged commitments. The guide on terminal-value dependence addresses a case where the model’s apparent precision can be dominated by distant assumptions.
Present the method, changed inputs, result, and limitation in the Executive Editor. A reader should know whether the number is an isolated response, a coherent conditional future, a threshold, or an evidence-based expectation before using it to decide.
Sources & further reading
- The Green Book 2026: Sensitivity analysis, switching values, and scenario analysis
The Green Book discusses varying key assumptions, calculating switching values, and examining plausible future outcomes through scenarios. The commercial arithmetic and distinction from an expected forecast here are original explanations, not a social-value appraisal.