How do you present financial ranges in a board paper?

Name what each financial range represents, show the assumptions behind its endpoints, and connect it to the decision threshold. Distinguish coherent scenarios from one-variable sensitivity tests and statistical intervals. Use a compact table with a plain-language interpretation so directors can assess downside, feasibility, and the conditions that change the recommendation.

The short answer

Name what each financial range represents, show the assumptions behind its endpoints, and connect it to the decision threshold. Distinguish coherent scenarios from one-variable sensitivity tests and statistical intervals. Use a compact table with a plain-language interpretation so directors can assess downside, feasibility, and the conditions that change the recommendation.

Key takeaways

  • A range needs a defined metric, period, currency basis, and method.
  • Scenario endpoints are not automatically probability bounds.
  • Show which assumptions move together and which are held fixed.
  • Put the decision threshold beside the range and keep cash timing separate.

A board paper reports that a proposal will generate between minus 9,000 and plus 27,400, with a reference estimate of 10,000. Without a method, the range is ambiguous. It could describe three scenarios, a sensitivity test, an expert judgment, or a statistical interval.

Make the meaning visible before asking directors to use the numbers. In executive decision papers, the range should explain what changes the choice and which uncertainty remains.

Name the metric and the basis

State whether the numbers represent revenue, selected contribution, operating profit, cash balance, or discounted value. Give the period, currency, price basis, and material exclusions. Two ranges are not comparable simply because both use currency units.

Keep the label next to the figures. A footnote several pages away is an unreliable place to disclose that an attractive return excludes implementation costs or assumes a different time horizon from the alternative.

In the example below, the metric is one-year selected contribution: units multiplied by price less variable cost, minus listed fixed costs. The figures are fictional and exclude financing, taxes, capital expenditure, working-capital timing, and other unlisted costs.

Explain how the range was constructed

The Green Book 2026 discusses scenarios, sensitivity analysis, and switching values as different ways to examine uncertainty. Preserve those distinctions in the paper.

A scenario changes a coherent set of assumptions. A one-variable sensitivity changes one input while holding specified others constant. A statistical interval requires a statistical method and assumptions; it should not be attached to a convenient low and high estimate.

Use plain labels such as three illustrative scenarios or volume sensitivity with other inputs unchanged. Do not call a reference case most likely unless the evidence and method support that interpretation.

Show the drivers beside the outcomes

Constructed one-year scenarios in common currency units
Input or resultConstrained caseReference caseFavorable case
Units8001,0001,200
Price per unit95100105
Variable cost per unit656058
Listed fixed costs33,00030,00029,000
Selected contribution−9,00010,00027,400

The constrained case combines lower volume and price with higher costs. The favorable case combines higher volume and price with lower costs. In an actual paper, explain the mechanism that makes each combination plausible; these constructed combinations are not forecasts.

The displayed span is minus 9,000 to plus 27,400 across the three cases examined. It is not a guarantee that outcomes will remain within those endpoints, and it does not establish probabilities for the cases.

Separate sensitivity from the scenario story

If only volume falls to 800 while reference price, variable cost, and fixed costs remain unchanged, selected contribution is 800 × (100 − 60) − 30,000 = 2,000. That differs from the constrained scenario's loss of 9,000 because the scenario changes several inputs.

Show this distinction when a director asks which driver matters most. A one-variable test helps isolate a mechanism, but it can miss interactions. A combined scenario shows interacting effects but does not identify one cause by itself.

Do not add the losses from separate sensitivity rows unless the model supports that combination. Some effects overlap, some are nonlinear, and some assumptions cannot occur together.

Put the relevant threshold next to the range

At the reference price and variable cost, zero selected contribution requires 30,000 ÷ (100 − 60) = 750 units. Under the constrained price and cost assumptions, the corresponding threshold is 33,000 ÷ (95 − 65) = 1,100 units.

Those thresholds are conditional. Presenting 750 as the universal break-even volume would hide the effect of price and costs. Neither threshold includes the omitted obligations or establishes a sufficient investment return.

The board may have another binding condition: an affordable cash requirement, a minimum service level, or a limit on irreversible spending. Name the condition and show which scenarios meet it. A financial midpoint should not conceal a failed constraint.

Make the visual and the prose tell the same story

Use clear row labels, units, negative signs, and explanatory text. If a chart is included, retain a readable table and state the important conclusion in words. Do not rely on red and green alone to distinguish favorable and adverse outcomes.

A concise interpretation could say that the proposal is positive in the reference and favorable cases, negative in the combined constrained case, and sensitive to the joint movement of price and delivery cost. It should also identify the exclusions that could affect approval.

Avoid excessive decimal precision when inputs are broad assumptions. Keep the exact calculations in the model and round the board display consistently, with enough precision to preserve the threshold and ranking.

Connect the range to authority and follow-up

The decision brief should state the requested commitment, the relevant downside, and the action if conditions move outside the approved scope. Identify decision rights for revising assumptions, releasing further spending, or stopping work.

Do not convert every movement within the range into an automatic management decision. Define observable triggers and the review process appropriate to the actual proposal. Distinguish a forecast update from a change in approved authority.

Use the mixed-context paper guide to separate the main interpretation from technical detail. Preserve alternatives through the rejected-option record so a changed threshold can reopen the right choice.

Place the table, bounded interpretation, and requested decision in the executive editor. Retain the source assumptions and model version so the displayed range can be reproduced when the board asks what changed.

Sources & further reading

  1. HM Treasury: The Green Book 2026

    The guidance distinguishes scenario analysis, sensitivity analysis, and switching values. The commercial contribution table and board-paper display are original and do not apply UK public-sector discount rates or claim full Green Book compliance.

Browse more guides
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor