How do you review financial assumptions supplied by a vendor?
Trace every material input to its source, scope and owner, then rebuild the benefits and costs using your actual operating baseline. Distinguish contract terms from estimates, capacity value from cash savings, and vendor case evidence from assumptions about your organization. Keep unresolved inputs visible and test how they affect the recommendation before adopting the vendor’s return figure.
The short answer
Trace every material input to its source, scope and owner, then rebuild the benefits and costs using your actual operating baseline. Distinguish contract terms from estimates, capacity value from cash savings, and vendor case evidence from assumptions about your organization. Keep unresolved inputs visible and test how they affect the recommendation before adopting the vendor’s return figure.
Key takeaways
- A vendor-provided model can be useful without being independently validated.
- Apply evidence to the same population, workflow, period and cost boundary.
- Saved time becomes cash only through a credible change in spending or receipts.
- Implementation, overlap, internal work and ongoing ownership belong in the comparison.
A vendor supplies an attractive return-on-investment workbook. It includes customer examples, calculated time savings, and a payback period. The formulas may work correctly while the inputs describe an organization very different from yours.
Review the model as a set of claims. Some may be contractual facts, some observed results from another setting, and some assumptions introduced to make a demonstration possible. They need different treatment.
Identify who owns each input
Create a register with the input, unit, period, source, applicable population, owner, and validation status. Distinguish quoted fees from estimated implementation effort and measured customer results from illustrative examples.
A vendor can explain its product and commercial offer. Your organization normally has better access to its own process baseline, staffing constraints, contract obligations, and ability to realize benefits. Assign validation accordingly.
Within financial appraisal, an assumption register should preserve unresolved differences rather than replacing them with whichever number makes the return look strongest.
Check applicability before accepting a benchmark
For a reported customer result, inspect the workflow, sample, starting condition, implementation scope, observation period, and measurement method. Identify whether the customer changed staffing, policy or other systems at the same time.
A saving from a heavily manual process may not transfer to a team that already automated most of that work. A result reported by selected successful customers may not describe the full customer base.
If the underlying evidence is unavailable, retain the figure as a vendor claim with limited support. Do not turn a case-study headline into a verified input simply because it appears in a spreadsheet.
Rebuild the operating baseline
Define what happens without the purchase, including planned changes already funded or required. Determine actual workload, eligible users, current costs, service quality, and the period over which benefits could arise.
Exclude benefits the organization would obtain anyway. If an existing process improvement removes the same work, the vendor model should not claim that entire reduction again.
The AQuA Book distinguishes verification from validation: a model can meet its design requirements while still being unsuitable for its intended use. Checking arithmetic is necessary; checking the baseline and mechanism is equally important.
Reconcile the time-saving claim
Suppose a fictional vendor model assumes 200 staff each save one hour per week for 48 weeks, valued at 50 per hour. That produces 9,600 hours and an allocated time value of 480,000.
If only half the staff use the relevant workflow effectively, the same assumptions produce 4,800 hours and 240,000 of allocated capacity value. The calculation still assumes the saving occurs, persists, and is not offset by new review or exception work.
Neither result is automatically a cash saving. Staff may use the released capacity for other tasks while payroll remains unchanged. Record that potential value separately and explain the work the capacity could support.
Build a separate cash bridge
| Item | Cash effect | Evidence needed |
|---|---|---|
| Avoided external spending | +120,000 | Work and payments actually cease without unacceptable service loss |
| Recurring vendor charge | −60,000 | Applicable offer, volume and terms |
| Implementation spending | −80,000 | Complete transition scope and timing |
| First-year net effect | −20,000 | All three assumptions hold on the same basis |
The first-year cash effect is negative 20,000 despite the larger allocated time value. In a later year without the implementation payment, the listed recurring assumptions would produce 60,000 net cash benefit.
Do not add the time value again if it represents the same work as the avoided external spending. Also check whether ending that spending has notice costs, residual obligations, or a different timetable.
Inspect costs outside the quote
Look for data preparation, migration, training, internal review, integration, parallel operation, support ownership, and eventual exit. Identify which costs are included in the vendor price and which remain your responsibility.
A model that excludes internal effort can overstate economic attractiveness even when its cash calculation is accurate. Keep resource costs and cash flows distinguishable so the organization can assess both capacity and funding.
Check usage limits, indexation, renewal assumptions, and required services against the actual offer. Avoid inventing future terms or treating a nonbinding estimate as a committed price.
Align benefits with timing and adoption
Benefits may start after training, data readiness, or a complete operating cycle. Costs may begin before that point. Model the sequence instead of assigning a full year of benefit to the first contract year automatically.
The guide on bookings and delivery periods helps separate commercial events from recognized revenue and cash timing. The guide on correlated collections addresses another reason a favorable annual result may still require funding.
For a multi-year NPV, use a consistent rate and cash-flow basis. Do not mix discounted benefits with undiscounted costs or a vendor-selected period that omits material later obligations.
Review the decision-driving uncertainties
Test the assumptions most capable of changing the choice: eligible adoption, realized saving, cost to implement, start date, or the alternative process. State what evidence would improve each input and whether it can be obtained before commitment.
Where the vendor offers a pilot, specify what it will actually test. A technical demonstration may establish feasibility while leaving organization-wide adoption and cash realization untested.
Prepare the reviewed case in the executive editor, with vendor claims, local evidence, and unresolved assumptions clearly distinguished. The organization should own the final business case even when a vendor supplied its starting model.
Sources & further reading
- The AQuA Book: verification, validation and analytical documentation
Distinguishes checking analytical design requirements from fitness for intended use and emphasizes documentation, assumptions and proportionate assurance.