How do you verify a statistic before including it in a client report?
Find the original table or study, reproduce the statistic where possible, and record its numerator, denominator, period, geography, population, and method. Check whether the sentence you intend to write has the same scope. If a material element remains unknown, qualify or remove the statistic rather than borrowing the authority of its source.
The short answer
Find the original table or study, reproduce the statistic where possible, and record its numerator, denominator, period, geography, population, and method. Check whether the sentence you intend to write has the same scope. If a material element remains unknown, qualify or remove the statistic rather than borrowing the authority of its source.
Key takeaways
- Verify the proposed sentence, not only the existence of a source.
- Separate survey respondents from the population you want to describe.
- Distinguish percentage points from relative percentage change.
- Keep a dated claim record so later revisions can be traced.
A statistic can be accurately copied and still be misleading in a client report. The source may describe respondents while the report describes all businesses, measure intentions while the report implies purchases, or observe an old period while the report uses the present tense. Verification must examine the sentence and the number together.
Use the following process for a consequential statistic: one that supports a recommendation, defines an opportunity, or could change an executive's interpretation. All numbers in the worked examples are invented to demonstrate the checks. They are not findings about a real market.
Write the proposed claim before searching for support
Place the intended sentence at the top of a verification card. Highlight the population, behaviour, period, and causal language it asserts. “Most small businesses buy automated scheduling” claims more than “some respondents are considering scheduling tools.” A source about the latter cannot support the former without additional evidence.
Record why the statistic matters. If the recommendation does not depend on it, a qualitative explanation may be clearer than an impressive but weak number. If the conclusion does depend on it, the verification effort should address that dependency explicitly.
Trace the claim through summaries to the original dataset, table, survey report, or study. A newspaper article can be useful for locating a finding, but a citation to that article may omit the definitions needed to evaluate it. Preserve the exact version used because both source material and web summaries can change.
Complete the verification card
| Field | Question to answer |
|---|---|
| Numerator | What event, quantity, or group was counted? |
| Denominator | Out of which eligible observations? |
| Period | When did the observations occur? |
| Geography | Which locations are actually covered? |
| Population and recruitment | Who could enter the dataset and who did? |
| Method | How were responses, weights, exclusions, and missing values handled? |
| Revision status | Is the table provisional, final, corrected, or superseded? |
A publication date is not an observation period. A report released this year may summarize data collected several years earlier. Keep both dates. Likewise, a multinational publisher does not make a local sample global; geography comes from the underlying observations.
Read notes and definitions around the table. They may reveal that “businesses” excludes firms without employees, “revenue” includes a particular category of transfers, or “adoption” means a trial rather than regular use. These differences are part of the statistic, not optional qualifications.
Reproduce the denominator before interpreting the result
In a fictional study, 120 organizations were invited, 100 replied, 90 met the stated eligibility rules, and 54 eligible respondents reported using a scheduling tool in the previous quarter. The reported proportion is 54 ÷ 90 = 60% of eligible respondents. It is not 60% of the original invitation list, nor automatically 60% of all businesses.
A defensible descriptive sentence would identify the respondent group, geography, and observation period. Any extrapolation to the wider market needs the sampling design and its limitations. A large sample or a precise-looking percentage does not by itself resolve selection bias.
If the published result is weighted, the raw numerator divided by the raw sample count may not reproduce it. Find the weighting explanation and the appropriate weighted calculation. Do not declare an error merely because a simple fraction differs; do not accept the figure without understanding the difference either.
Check units, comparisons, and implied causes
A rate rising from 30% to 36% increases by six percentage points. Its relative increase is 6 ÷ 30 = 20%. Both statements can be correct, but they answer different questions. A report that calls this a “six percent increase” is ambiguous unless it explains which comparison it means.
For monetary values, check currency, nominal versus inflation-adjusted basis, gross versus net treatment, and whether the figure is an annual flow or an accumulated stock. For averages, identify whether the source reports a mean, median, weighted mean, or another measure. Do not rename one because a different term is more familiar to the audience.
Remove causal wording that the research design cannot support. A correlation between software use and business growth does not establish that the software caused the growth. The statistic may remain useful as a descriptive observation once the sentence is narrowed.
Decide whether to retain, qualify, or remove the statistic
Retain it when its meaning and relevance are clear. Qualify it when a known limitation matters but does not destroy its usefulness. Remove or replace it when the underlying source cannot be located, the relevant denominator remains unknown, or the evidence does not address the claim being made.
The GovS 010 analysis standard links verification and validation with documentation and communication of limitations. The practical implication is to retain the verification card with the report, including the reason for any qualification or removal.
Ask a second reader to reconstruct the claim from the source without your explanatory narrative. If they reach a different denominator or population, resolve the difference before circulation. A source link is useful only when it leads a reviewer to evidence that supports the actual sentence.
Use the evidence and research methods hub, claim-to-source mapping, and source independence to extend the review. Keep sampling bias and the sampling frame visible. Organize the verified claim and its limitations in the executive editor.
Sources & further reading
- Government functional standard GovS 010: Analysis
Sections on verification, validation, documentation, and delivery require checking analysis and communicating assumptions and limitations. The statistic verification card is an original practical implementation.