the decision pattern.TDP.

Huff Gravity Model Guide: Estimating a New Location's Market Share from Store Size and Travel Distance

How to estimate the share of a trade area a new location would capture from its attractiveness, distance to customers, and competing sites.

The short answer

The Huff model gives a site a share equal to its size divided by distance raised to a decay power, as a fraction of the same quantity summed over all competing sites; a 20,000 sq ft store 5 miles away competing with a 30,000 sq ft store at 4 miles and a 10,000 sq ft store at 3 miles captures about 21%.

Key takeaways

  • Primary measure: Predicted Share of Trade-Area Demand by Location.
  • Healthy: Share estimated from measured travel times and local demand, with the distance-decay parameter calibrated on existing stores.
  • Watch closely: Sites compared on drive-time rings and counts of competitors, with no estimate of share.
  • Act now: A site chosen because it is large or visible, with no view of how nearby rivals will split the same customers.
  • A 5-mile site captures about 21% of the neighborhood, moving it to 3 miles doubles that to 43%, and adding 10,000 square feet adds only 7.5 points, so location often matters more than size.

How to estimate the share of a trade area a new location would capture from its attractiveness, distance to customers, and competing sites. Key terms used below: market share, market sizing, competitive analysis, sensitivity analysis. Related guides: Store Opening Economics Guide: Occupancy Cost Ratio, Break-Even Sales, and Margin of Safety and Market Entry Feasibility: Test Demand, Delivery and the Cash Required to Reach Scale.

What decision this guide supports

When a retailer or a service business enters an area, customers choose among the locations they can reach. Larger or more attractive locations draw more customers, and distance reduces the pull. The Huff gravity model turns these two ideas into a simple estimate of how a neighborhood's demand will divide among competing sites.

Each location has a utility equal to its attractiveness, often measured by floor area, divided by the travel distance or time raised to a power. The probability that customers in a given area choose a site is its utility divided by the sum of the utilities of all sites. Multiplying by local demand gives expected customers.

The model is a planning aid, not a prediction of the exact outcome. Its value is that it makes the trade-offs between size, location, and competition explicit, and it allows quick tests of alternative sites.

Key terms

Trade area
The geographic area from which a location draws most of its customers.
Attractiveness
A measure of how appealing a location is, such as size or assortment.
Distance decay
The decline in a location's pull as travel distance or time rises.
Utility
The model's score for a site before shares are calculated.

How to calculate it

The utility of site j for customers in area i equals attractiveness S of site j divided by distance D from i to j raised to the power lambda. The probability that customers in area i choose site j equals the utility of j divided by the sum of utilities across all sites. Expected customers equal the probability times total demand in area i. The distance-decay power lambda is usually estimated from existing store data and is often close to 2 for convenience trips.

Benchmark matrix and working thresholds

The table summarizes the main options or components and what to watch in each.

Site Size (sq ft) Distance (miles) Utility (size / distance squared) Share of Demand
New store 20,000 5 800.0 21.1%
Competitor A 30,000 4 1,875.0 49.5%
Competitor B 10,000 3 1,111.1 29.4%
Total 3,786.1 100%

Working thresholds

Treat these as starting heuristics to calibrate against your own data, not universal standards.

  • Healthy: Share estimated from measured travel times and local demand, with the distance-decay parameter calibrated on existing stores.
  • Watch closely: Sites compared on drive-time rings and counts of competitors, with no estimate of share.
  • Act now: A site chosen because it is large or visible, with no view of how nearby rivals will split the same customers.

Worked scenario

The figures below are an illustrative composite, not a named company or an audited case. Replace them with your own data.

Illustrative composite: a neighborhood has 50,000 households that shop for this category. A new 20,000 square foot store would be 5 miles from the neighborhood center. Competitor A has 30,000 square feet at 4 miles, and competitor B has 10,000 square feet at 3 miles. With a distance-decay power of 2, the utilities are 20,000 divided by 25, or 800 for the new store, 30,000 divided by 16, or 1,875 for A, and 10,000 divided by 9, or 1,111 for B. The total is 3,786, so the new store's share is 800 divided by 3,786, or 21.1%, which is about 10,600 households. Moving the site to 3 miles, with the same size, raises utility to 2,222 and share to 42.7%. Keeping the 5-mile site but expanding to 30,000 square feet lifts share to 28.7%. If customers are less sensitive to distance, with a decay power of 1, the far site's share rises to 27.0%. The comparison shows that a two-mile shift in location is worth far more than a 50% increase in floor area, and that the estimate depends on the decay parameter, which should be calibrated on existing stores before the result is used in a business case.

What the scenario shows

A 5-mile site captures about 21% of the neighborhood, moving it to 3 miles doubles that to 43%, and adding 10,000 square feet adds only 7.5 points, so location often matters more than size.

How to read the results

  • If a site's share is low because of distance: Look for sites closer to demand before adding size.
  • If competitors have most of the utility: Expect a small share unless the offer is distinctly different.
  • If share is very sensitive to the decay power: Collect local data to calibrate before committing capital.

Common failure modes

  1. Using straight-line distance: Travel time on real roads, with barriers such as rivers and highways, predicts choice better.
  2. Assuming one decay power for all categories: Convenience goods show steep distance decay and destination goods show much less.
  3. Ignoring other attractiveness factors: Brand, price level, parking, and assortment affect choice and are not captured by floor area.
  4. Treating the output as a forecast of sales: Shares are relative, so total demand and spending per household must be estimated separately.

Putting it into practice

  • Define areas and demand: Divide the trade area into zones with households, spending, and travel times to each site.
  • Calibrate the model: Estimate the decay power and attractiveness measure from existing stores or loyalty data.
  • Compare sites and test scenarios: Compute shares for candidate locations, test rival openings, and combine with costs in a site business case.

Sensitivity and limits

  • Distance-decay power: Test powers of 1, 2, and 3.
  • Competitor response: Add a new competitor or an expansion by an existing one.
  • Attractiveness measure: Compare floor area with a measure that includes assortment or brand score.

The Huff model assumes customers choose from a known set of sites using only size and distance. It ignores habit, loyalty, online options, and trip chaining, so results should be checked against observed patterns.

Where this fits in a wider decision

Use the Huff model at the screening stage for physical locations, and combine it with cost and cannibalization analysis for the final decision. Refresh the calibration as the network grows.

Your checklist

  • Confirm you have avoided this trap: Using straight-line distance.
  • Confirm you have avoided this trap: Assuming one decay power for all categories.
  • Confirm you have avoided this trap: Ignoring other attractiveness factors.
  • Confirm you have avoided this trap: Treating the output as a forecast of sales.

Steps to follow

  1. Define areas and demand

    Divide the trade area into zones with households, spending, and travel times to each site.

  2. Calibrate the model

    Estimate the decay power and attractiveness measure from existing stores or loyalty data.

  3. Compare sites and test scenarios

    Compute shares for candidate locations, test rival openings, and combine with costs in a site business case.

Common questions

What is the Huff gravity model?

It estimates the probability that customers choose a location based on its attractiveness and distance relative to all competing locations.

How do you calibrate the distance-decay parameter?

Fit it to existing store data, such as customer addresses or sales by zone, so the model's shares match observed shares.

Related topics

  • huff gravity model
  • retail site selection model
  • market share by distance
  • trade area analysis
  • store location market share
  • distance decay parameter
  • huff model example

Sources & further reading

  1. U.S. Census Bureau Quarterly Retail E-Commerce Sales

    U.S. Census Bureau

    Public data on retail activity, useful for context on how physical and online shopping divide.

  2. U.S. International Trade Administration Country Commercial Guides

    International Trade Administration

    Country market guides with context on retail structure and local conditions.

  3. GAO Cost Estimating and Assessment Guide

    U.S. Government Accountability Office

    Method guidance for cost estimating, risk adjustment, and reconciling estimates.

Browse more guides
One platform. Two tools.

Research the question.
Build the case.

Use Research Reports to understand the opportunity. Use Executive Editor to develop the recommendation, examine the assumptions and prepare a decision paper.

Research Reports

Explore markets, competitors, customers, brand perception or a product idea. Each one is a complete Standard report.

AI-assisted desk research · One-time report purchaseExplore Research Reports

Executive Editor

Write your case, connect evidence and calculations, review proposed changes and publish a saved version when you are ready.

Use your TDP account · No report purchase requiredExplore Executive Editor