LTL vs Full Truckload Guide: Calculating the Shipment Weight at Which a Dedicated Truck Beats Shared Freight
How to find the shipment weight at which a flat-rate full truckload becomes cheaper than per-pound LTL freight, and what consolidation does to inventory cost.
The short answer
Divide the flat price of a full truckload by the LTL price per pound to find the break-even weight, then subtract the carrying cost of holding goods long enough to consolidate; above the break-even weight, and when the carrying cost is smaller than the freight saved, the truckload is the cheaper choice.
Key takeaways
- Primary measure: Freight Cost per Pound and Total Logistics Cost Including Carrying Cost.
- Healthy: Mode chosen from break-even weight and carrying cost, with consolidation rules reviewed against service levels.
- Watch closely: Truckload used when a load seems large enough, with no comparison to LTL rates and holding costs.
- Act now: Every shipment sent LTL by default, or trucks sent partly empty to keep service levels.
- The truckload beats undiscounted LTL above 7,200 pounds and discounted LTL above about 8,471 pounds, and consolidating three weeks of shipments saved a net 4,800 dollars a year after counting 3,000 dollars of carrying cost.
How to find the shipment weight at which a flat-rate full truckload becomes cheaper than per-pound LTL freight, and what consolidation does to inventory cost. Key terms used below: landed cost, total cost of ownership, in-transit inventory, inventory carrying cost. Related guides: Air vs. Ocean Freight Guide: Total Cost with Pipeline Inventory, Safety Stock, and the Break-Even Product Value and Perfect Order Rate Guide: Why Good Individual Service Metrics Compound into Poor Overall Performance.
What decision this guide supports
Shippers with loads that are too large for parcel services but smaller than a full trailer choose between less-than-truckload service, where freight shares a truck and is priced by weight and class, and full truckload, where a whole trailer is paid for at a flat rate.
LTL cost rises in proportion to weight, while truckload cost is flat up to the trailer limit. That produces a break-even weight above which the dedicated truck is cheaper, and discounts that LTL carriers give on bigger shipments move that break-even higher.
The cheapest freight rate is not always the cheapest decision. Waiting to fill a truck means holding goods longer, which costs money, ties up cash, and may hurt service, so the comparison should include the carrying cost of consolidation.
Key terms
- LTL
- Less-than-truckload freight, in which shipments from several shippers share a trailer.
- Full truckload
- Freight that uses a whole trailer for one shipper at a flat rate.
- Consolidation
- Combining several small shipments into one larger shipment.
- Carrying rate
- The annual cost of holding inventory, as a share of its value.
How to calculate it
The break-even weight equals the flat truckload price divided by the LTL price per pound. If LTL gives a discount d above a weight threshold, the discounted price per pound equals the base price times one minus d, and the break-even equals the truckload price divided by the discounted price. The carrying cost of consolidation equals the extra average inventory in pounds times the value per pound times the annual carrying rate.
Benchmark matrix and working thresholds
The table summarizes the main options or components and what to watch in each.
| Shipment Weight (lb) | LTL Cost (dollars) | Truckload Cost (dollars) | Cheaper Option |
|---|---|---|---|
| 5,000 | 1,250 | 1,800 | LTL |
| 7,200 | 1,800 | 1,800 | Equal without a discount |
| 8,000 | 1,700 (15% discount) | 1,800 | LTL |
| 9,000 | 1,912.50 (15% discount) | 1,800 | Truckload |
Working thresholds
Treat these as starting heuristics to calibrate against your own data, not universal standards.
- Healthy: Mode chosen from break-even weight and carrying cost, with consolidation rules reviewed against service levels.
- Watch closely: Truckload used when a load seems large enough, with no comparison to LTL rates and holding costs.
- Act now: Every shipment sent LTL by default, or trucks sent partly empty to keep service levels.
Worked scenario
The figures below are an illustrative composite, not a named company or an audited case. Replace them with your own data.
Illustrative composite: LTL freight costs 0.25 dollars per pound and a full truckload is a flat 1,800 dollars for loads up to 40,000 pounds. The break-even is 1,800 divided by 0.25, or 7,200 pounds. The carrier also offers a 15% discount on shipments over 5,000 pounds, bringing the price to 0.2125 dollars per pound and moving the break-even to 1,800 divided by 0.2125, or about 8,471 pounds. At 8,000 pounds, discounted LTL costs 1,700 dollars and beats the truck; at 9,000 pounds it costs 1,912.50 dollars and the truck wins. Now a shipper sends 3,000 pounds a week at a goods value of 5 dollars per pound, with a carrying rate of 20% a year. Weekly LTL costs 750 dollars, or 39,000 dollars a year. Consolidating three weeks into one 9,000 pound truckload costs 1,800 dollars per three weeks, or about 31,200 dollars a year, saving 7,800 dollars. Average stock rises by 3,000 pounds, which at 5 dollars and 20% adds 3,000 dollars a year, so the net saving is 4,800 dollars. Shipping every two weeks, 6,000 pounds at the discounted LTL price, costs 33,150 dollars a year, saves 5,850, adds 1,500 of carrying cost, and nets 4,350. The three-week truckload wins by 450 dollars, but longer intervals were not tested here and service needs may rule them out.
What the scenario shows
The truckload beats undiscounted LTL above 7,200 pounds and discounted LTL above about 8,471 pounds, and consolidating three weeks of shipments saved a net 4,800 dollars a year after counting 3,000 dollars of carrying cost.
How to read the results
- If typical shipments are far below break-even: LTL is the better choice, and consolidation may only help for some lanes.
- If shipments are close to break-even: Check carrying costs, damage, and service, which can tip the choice either way.
- If shipments are above break-even: Use a truckload, and consider pooling with other shippers on shared lanes if loads are partly filled.
Common failure modes
- Comparing only freight rates: Ignoring the cost of holding goods while a load fills overstates the benefit of consolidation.
- Forgetting the discount thresholds: LTL carriers' discounts and minimum charges can change the break-even a lot.
- Sending partly empty trucks: Paying a flat price for a half-filled truck raises the cost per pound beyond the LTL rate.
- Overlooking service and damage: Fewer touches in a truckload can lower damage, while longer waits can hurt customer service.
Putting it into practice
- Collect rates and shipment profiles: Gather LTL quotes by lane, truckload rates, and the weights and frequency of real shipments.
- Calculate break-even and total cost: Compute the break-even with discounts, and add carrying cost for each shipping interval.
- Set consolidation rules: Define weight thresholds and maximum waiting times, then review them against service levels each quarter.
Sensitivity and limits
- Truckload rate: Test flat rates 15% higher and lower, which move the break-even by the same proportion.
- Goods value: Compare low and high value per pound, since carrying cost scales with value.
- Discount structure: Check how different discount levels and thresholds change the best mode.
This comparison uses a flat truckload rate and a simple per-pound LTL rate. Real LTL pricing depends on freight class, distance, and accessorial charges, and truckload rates vary by lane and season, so use quoted prices.
Where this fits in a wider decision
Use this comparison for lanes with regular, predictable shipments. Combine it with inventory policy and customer service targets, and revisit it whenever carrier rates or goods values change.
Your checklist
- Confirm you have avoided this trap: Comparing only freight rates.
- Confirm you have avoided this trap: Forgetting the discount thresholds.
- Confirm you have avoided this trap: Sending partly empty trucks.
- Confirm you have avoided this trap: Overlooking service and damage.
Steps to follow
Collect rates and shipment profiles
Gather LTL quotes by lane, truckload rates, and the weights and frequency of real shipments.
Calculate break-even and total cost
Compute the break-even with discounts, and add carrying cost for each shipping interval.
Set consolidation rules
Define weight thresholds and maximum waiting times, then review them against service levels each quarter.
Common questions
How do I calculate the LTL vs truckload break-even?
Divide the flat truckload price by the LTL price per pound, using the discounted price if a discount applies.
Does consolidating shipments always save money?
Not always, because holding goods to fill a truck adds carrying cost and can reduce service, so compare the freight saved with those costs.
Related topics
- LTL vs FTL
- LTL vs full truckload break-even
- freight consolidation savings
- truckload vs LTL cost
- when to ship full truckload
- freight mode selection
- LTL discount break-even
Sources & further reading
- U.S. Bureau of Labor Statistics Producer Price Index
U.S. Bureau of Labor Statistics
Producer price data for trucking that affect freight cost assumptions.
- ASCM Supply Chain Resources
Association for Supply Chain Management
Industry definitions for logistics, freight, and inventory costs.
- U.S. Census Bureau Manufacturing and Trade Inventories and Sales
U.S. Census Bureau
Aggregate inventory and sales data for context on supply chain conditions.