Make-or-Buy Decision Guide: Relevant Costs, Avoidable Fixed Costs, and Opportunity Cost
A relevant-cost method for make-or-buy decisions that ignores allocated overhead, counts avoidable fixed costs, and includes opportunity cost.
The short answer
Compare future cash costs and opportunity costs that differ between making and buying over the same horizon. Verify which labor and fixed commitments can actually end, and when. Unavoidable overhead is not a saving from outsourcing; freed capacity adds value only through an evidenced alternative use, sale or avoided commitment.
Key takeaways
- Count future differences rather than full-cost allocations.
- Verify actual release of labor and fixed commitments.
- Include feasible alternative use of capacity.
- Lower avoidable fixed cost favors making, other things equal.
- Model transition, quality and reversal costs.
A relevant-cost method for make-or-buy decisions that ignores allocated overhead, counts avoidable fixed costs, and includes opportunity cost. Key terms used below: relevant cost, opportunity cost, sunk cost, variable costs. Related guides: Build vs. Buy Software Decision Guide: Calculating 5-Year Total Cost of Ownership and Opportunity Cost and Contribution Margin and Product-Line Profitability Guide: Pruning the Tail Without Losing Cash.
What decision this guide supports
Companies regularly choose between producing a component in-house and buying it from a supplier. Product costing systems show a full cost per unit that includes allocated overhead, and managers compare it with the supplier price.
That comparison can mislead. Allocated overhead may not go away if production stops, so it should not count as a saving. The right question is which costs actually change with the decision.
Key terms
- Relevant cost
- A future cost that differs between alternatives.
- Avoidable fixed cost
- A fixed cost that would actually be eliminated if an activity stopped.
- Sunk cost
- A cost already incurred that cannot be changed by the decision.
- Opportunity cost
- The benefit given up by using a resource for one purpose instead of its best alternative.
How to calculate it
For making, include costs avoided by buying, plus any contribution forgone by occupying capacity. For buying, include supplier payments, logistics, qualification, transition, quality, monitoring and other incremental costs. Keep unavoidable costs common to both alternatives out of the difference, while retaining them in the whole-business cash plan.
OpenStax’s make-or-buy analysis distinguishes avoidable costs from allocations that continue. Test the timing of staff changes, lease exits and equipment disposal rather than classifying a cost as avoidable merely because it appears in a product ledger.
Benchmark matrix and working thresholds
The table summarizes the main options or components and what to watch in each.
| Cost Item | Relevant to the Decision? | Why | Common Error |
|---|---|---|---|
| Direct materials and labor | Yes if they stop when making stops | They change with volume | Treating committed labor as variable |
| Allocated fixed overhead | Only the avoidable part | Unavoidable overhead continues either way | Counting the full allocation as saved |
| Equipment already owned | No (sunk) unless it can be sold or reused | Past cost cannot be recovered | Including historical cost |
| Freed capacity | Yes if it can earn contribution | It has opportunity cost | Assuming freed capacity has no use |
Working thresholds
Treat these as starting heuristics to calibrate against your own data, not universal standards.
- Healthy: Decision based on relevant cost with avoidable fixed cost verified and opportunity cost of capacity considered.
- Watch closely: Decision based on full absorbed unit cost; avoidable fixed cost estimated but not verified.
- Act now: Allocated overhead treated as saved; supplier risk and quality cost ignored.
Worked scenario
The figures below are an illustrative composite, not a named company or an audited case. Replace them with your own data.
A company makes 25,000 units of a component a year. Direct material is 18 dollars, direct labor is 9 dollars, and variable overhead is 6 dollars, totaling 33 dollars. Allocated fixed overhead is 300,000 dollars, or 12 dollars per unit, giving a full cost of 45 dollars. A supplier offers the part at 42 dollars. On the full cost, buying looks cheaper by 3 dollars a unit. But only 120,000 dollars of the fixed overhead is avoidable, such as a supervisor and an equipment lease, and the other 180,000 dollars would continue. The relevant cost of making is 33 + 120,000 / 25,000 = 37.80 dollars, below 42, so making saves 4.20 x 25,000 = 105,000 dollars a year. If the freed capacity could earn 60,000 dollars of contribution elsewhere, making costs 945,000 + 60,000 = 1,005,000 dollars against 1,050,000 to buy, a saving of 45,000. The break-even supplier price is 1,005,000 / 25,000 = 40.20 dollars. If the supplier cut the price to 38 dollars, buying would cost 950,000 and become cheaper by 55,000 dollars.
What the scenario shows
The full-cost comparison pointed to buying, and the relevant-cost comparison pointed to making. The decision flips again if the supplier lowers its price to 38 dollars, so the supplier price and capacity use should be tested together.
How to read the results
- If making has the lower relevant cost: In-house production is cheaper, but confirm capacity, quality, and the stability of the avoidable cost estimate.
- If buying has the lower relevant cost: Outsourcing saves money on these assumptions, though supplier risk and exit costs should be priced.
- If the break-even price is near the quote: The decision is sensitive to negotiation, so test volumes and prices before committing.
Common failure modes
- Using absorbed unit cost: Full cost includes allocations that do not change with the decision, which can make making look more expensive than it is.
- Assuming all fixed cost is avoidable: Leases, salaries, and depreciation may not disappear, so verify each item before counting it as saved.
- Ignoring supplier risk and quality: Price is not the only cost of buying; delivery failures, defects, and dependence can outweigh the saving.
- Forgetting what freed capacity could do: Capacity not used for the part has value only if it is used for something else, so test whether it will be.
Putting it into practice
- Classify each cost line: For every cost, ask what happens to it if production stops and record whether it is avoidable.
- Include opportunity cost and risk: Estimate the use of freed capacity and add the cost of quality and supply risk when buying.
- Find the break-even price: Calculate the supplier price at which the decision flips and compare it with likely negotiation outcomes.
Sensitivity and limits
In the worked example, variable making cost is $825,000, avoidable fixed cost $120,000 and alternative contribution $60,000. Relevant make cost including opportunity cost is $1,005,000, versus $1,050,000 to buy. The break-even supplier price is $40.20 before additional buying costs.
If only $60,000 fixed cost is avoidable, relevant make cost falls to $825,000 + $60,000 + $60,000 = $945,000. Keeping production is then $105,000 cheaper than buying at $42, and the break-even quote falls to $37.80. Less avoidable cost strengthens the case for making; it does not make outsourcing more attractive.
Lower volume raises avoidable fixed cost per unit only if those commitments remain unchanged. Opportunity value and supplier price may also change. Include termination charges, ramp and reversal costs on their actual dates, and assess intellectual property, quality and supply continuity alongside the cost result.
Continue the analysis
Your checklist
- Confirm you have avoided this trap: Using absorbed unit cost.
- Confirm you have avoided this trap: Assuming all fixed cost is avoidable.
- Confirm you have avoided this trap: Ignoring supplier risk and quality.
- Confirm you have avoided this trap: Forgetting what freed capacity could do.
Steps to follow
Classify each cost line
For every cost, ask what happens to it if production stops and record whether it is avoidable.
Include opportunity cost and risk
Estimate the use of freed capacity and add the cost of quality and supply risk when buying.
Find the break-even price
Calculate the supplier price at which the decision flips and compare it with likely negotiation outcomes.
Common questions
What costs are relevant in a make-or-buy decision?
Only costs that change with the decision: variable costs, fixed costs that would be avoided, and the opportunity cost of capacity. Allocated overhead that continues either way is not relevant.
Why can full cost give the wrong make-or-buy answer?
Full cost includes allocated overhead that may not disappear if production stops. Counting it as a saving makes buying look cheaper than it really is.
Related topics
- make or buy decision
- relevant cost analysis
- avoidable fixed costs
- outsourcing cost comparison
- make vs buy opportunity cost
- break even supplier price
- full cost vs relevant cost
Sources & further reading
- OpenStax: Make or buy a component
Relevant-cost analysis distinguishes avoidable from unavoidable costs and includes qualitative sourcing constraints.