Market size
Two research firms put the 2025 global market at similar levels. MarketsandMarkets (September 2025) values adhesives and sealants together at $76.96bn in 2025. The Business Research Company values adhesives alone at $82.67bn in 2025, up from $76.39bn in 2024. The midpoint is about $80bn (our calculation), within a range of $77.0bn to $82.7bn.
The two scopes are not the same: one includes sealants and one does not, yet the adhesives-only figure is the larger. That tells you more about method than about the market, so treat $80bn as an order of magnitude. Regional figures from trade bodies are firmer. The Adhesive and Sealant Council puts North America at $24.83bn and 5.52 million tons in 2025. FEICA's last published study put Europe at €19.9bn and 4.8 million tonnes in 2022.
| Measure | Value | Period | Source |
|---|---|---|---|
| Global adhesives and sealants | $76.96bn | 2025 | MarketsandMarkets |
| Global adhesives | $82.67bn | 2025 | The Business Research Company |
| North America adhesives and sealants | $24.83bn (5.52m tons) | 2025 | Adhesive and Sealant Council |
| Europe adhesives and sealants | €19.9bn (4.8m tonnes) | 2022 | FEICA |
| Henkel Adhesive Technologies sales | €10.67bn | 2025 | Henkel |
| H.B. Fuller net revenue | $3.47bn | FY2025 | H.B. Fuller |
Market structure
- Packaging and construction lead. In Europe, paper, board and related products took 35% of 2022 volume and building and construction 28%. In North America, paper and board is the largest adhesive segment by volume, driven by pressure-sensitive labels and packaging.
- Asia Pacific is the largest region. MarketsandMarkets says it was the biggest market in 2024, though it gives no share.
- A few large players. Henkel, H.B. Fuller, Sika, Arkema (Bostik), 3M, Dow, Huntsman, Wacker and RPM are the main names listed by MarketsandMarkets. Henkel's adhesives unit alone sold €10.67bn in 2025.
- The US dominates North America. It holds 80.6% of regional volume, against 11.6% for Canada and 7.7% for Mexico.
What drives it
- Industrial volumes are flat. Henkel's adhesives sales grew 1.5% organically in 2025, mainly from mobility and electronics, and it expects 1% to 3% in 2026. H.B. Fuller's organic revenue was flat, with prices up 0.8% and volume down 0.8%. Its engineering adhesives segment grew 5.2%.
- Newer chemistries grow faster. ASC names reactive adhesives and silane-modified polymer sealants as the fastest-growing segments, with SMPs forecast at 7.3% a year to 2030.
- Europe is mature. FEICA's study expected only a small rise in volume to 2028, with consumer and DIY slowing and footwear declining.
How this estimate was made
- No official body publishes a global total, so the headline is the midpoint of two paid research estimates for 2025: ($76.96bn + $82.67bn) ÷ 2 = $79.8bn, rounded to $80bn. Confidence is low for that reason.
- Forecasts differ sharply: MarketsandMarkets expects 3.46% a year to $91.23bn in 2030, while The Business Research Company expects 8.6% a year to $115.04bn in 2029. Company guidance of flat to 3% organic growth sits closer to the lower figure.
- Regional trade-body figures (ASC, FEICA) and company results are used as checks. They include sealants and use different years and currencies, so we do not add them up.
- The Business Research Company page we read does not give a publication date. FEICA's European figure is for 2022 and is the latest we could read.
Questions
How big is the global adhesives market?
About $80bn in 2025, between MarketsandMarkets' $77.0bn (including sealants) and The Business Research Company's $82.7bn (adhesives only).
Who are the largest adhesives companies?
Henkel's adhesives unit sold €10.67bn in 2025, the largest of the company figures we found. H.B. Fuller reported $3.47bn in FY2025. Sika, Arkema's Bostik, 3M and Dow are other major suppliers.
How fast is the adhesives market growing?
Published forecasts range from 3.5% a year (MarketsandMarkets, to 2030) to 8.6% a year (The Business Research Company, to 2029). Henkel guides to 1% to 3% organic growth in 2026.
How big is the North American adhesives market?
The Adhesive and Sealant Council puts North American adhesives and sealants at $24.83bn and 5.52 million tons in 2025, rising to $30.74bn by 2030.
Sources
- Adhesives and sealants market worth $91.23 billion by 2030, MarketsandMarkets, 19 September 2025.
- Adhesives global market report, The Business Research Company via GII, undated (2025 base).
- Adhesive and sealant market in North America to reach $30.74 billion by 2030, Adhesive and Sealant Council, 28 May 2026.
- FEICA publishes new market report, Smithers for FEICA, September 2023.
- Henkel delivers organic growth in 2025 and increases profitability, Henkel, 11 March 2026.
- H.B. Fuller reports fourth quarter and fiscal year 2025 results, H.B. Fuller via Business Wire, 14 January 2026.