the decision pattern.TDP.

Global agricultural drones market size 2025

The global agricultural drone market is worth about $3.7bn in 2025, with estimates from $3.5bn to $5.1bn. DJI alone had about 400,000 agricultural drones in use at end 2024, up 90% since 2020, and holds roughly 40% of the market, with Asia Pacific the largest region.

Indicative estimateResearched 2 November 20265 linked sources
Market size 2025
$3.7bn
Range
$3.5bn–$5.1bn
Forecast
$9.7bn by 2035 (GMI) to $67.6bn by 2035 (Research and Markets)
Growth
10.2%–29.5% a year (2025–2035)

Market size

Global Market Insights (GMI) values the agricultural drone market at $3.7bn in 2025, with rotary-wing (multi-rotor) machines taking 76.7% of revenue, fixed-wing 14% and hybrids 9.4%. Asia Pacific is the largest region at 44.1%, followed by North America at 27.7% and Europe at 19%. GMI projects $9.7bn by 2035, a 10.2% compound rate.

IMARC lands close by at $3.46bn for 2025, while Research and Markets is higher at $5.07bn. The three publishers agree on the starting point to within about 45%, but their forecasts diverge wildly: IMARC projects $29.5bn by 2034 (26.85% a year) and Research and Markets $67.55bn by 2035 (29.5% a year), against GMI's $9.7bn. We publish GMI's figure as the headline because it is the most recent and the only one with a detailed segment and vendor split.

MeasureFigureSource / period
Market value, global$3.7bnGMI, 2025
Market value, global$3.46bnIMARC, 2025
Market value, global$5.07bnResearch and Markets, 2025
DJI agricultural drones in useabout 400,000, up 90% since 2020DJI, end 2024
Countries with DJI agricultural drones100DJI, 2025 report
Rotary-wing share of revenue76.7%GMI, 2025
Asia Pacific share of revenue44.1%GMI, 2025
DJI market shareabout 40%; XAG 16%, Yamaha 8%GMI, 2025

Market structure

  • One Chinese vendor dominates. GMI gives DJI about 40% of 2025 revenue, XAG 16% and Yamaha Motor 8%, so the top five hold 69%. DJI's own annual report says about 400,000 of its agricultural drones were in use at the end of 2024, treating 300 crop types in 100 countries, and claims 222 million tonnes of water saved cumulatively.
  • Spraying, not scouting, drives the money. Multi-rotor spray drones such as the DJI T50 and T25 make up three quarters of revenue. Research and Markets lists crop monitoring, soil and carbon tracking, precision spraying, livestock monitoring and insurance assessment as the application set.
  • Regulation is loosening. In 2024 China's interim rules for unmanned aircraft took effect and DJI's T-series received airworthiness certificates; the US FAA updated its exemption list for drones over 25 kg three times and allowed one pilot to control up to three aircraft; Australia removed the need for CASA authorisation on a farmer's own land.
  • Policy risk sits in the US. DJI warned that a US ban on its products would hit a market where its Agras line is described by Research and Markets as the dominant player in North America. US rivals named include Hylio, AgEagle, Draganfly and Pyka.

How this estimate was made

  1. GMI's $3.7bn for 2025 is the headline. It was published in July 2026 and is the only estimate we found with vendor shares and a regional split.
  2. The range is the lowest (IMARC, $3.46bn) to highest (Research and Markets, $5.07bn) of the three 2025 estimates we fetched.
  3. Confidence is low because all three value estimates come from paid-report publishers and their growth assumptions differ by a factor of three. The only operator-grade number is DJI's 400,000 installed base, which is a cumulative count, not an annual sales figure.
  4. We did not find a government, FAO or trade-body estimate of global agricultural drone sales. Volumes are reported only by DJI.
  5. The forecast range reports the publishers' own figures. We have not built a scenario of our own.

Questions

How big is the agricultural drone market?

About $3.7bn in 2025 according to Global Market Insights, with other publishers putting it between $3.46bn (IMARC) and $5.07bn (Research and Markets).

How many agricultural drones are in use?

DJI reported about 400,000 of its own agricultural drones in use at the end of 2024, up 90% from 2020. No source gives a total across all manufacturers.

Who are the biggest agricultural drone companies?

DJI holds about 40% of the market and XAG 16% by GMI's estimate, both Chinese. Yamaha Motor has 8%, Garuda Aerospace 3% and Pyka 2%.

How fast is the agricultural drone market growing?

Forecasts range from 10.2% a year (GMI, to $9.7bn by 2035) to 29.5% a year (Research and Markets, to $67.6bn by 2035). The gap comes from different assumptions about adoption outside Asia.

Sources

  1. Agricultural Drone Market Size and Share Report 2026–2035, Global Market Insights, July 2026.
  2. Global Agriculture Drones Market Size, Share and Forecast 2026–2034, IMARC Group, 19 February 2026.
  3. Future of Agri-Drones Market: Global and Regional Analysis 2025–2035, Research and Markets via Business Wire, 17 October 2025.
  4. DJI Agriculture Annual Report 2025, DJI, 30 April 2025.
  5. DJI drone report: agriculture adoption driven by favourable policies worldwide, AgNavigator, 13 May 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.