the decision pattern.TDP.

Global aircraft maintenance market size 2025

Airlines spent about $136bn on commercial aircraft maintenance, repair and overhaul in 2025, up 8%, according to Oliver Wyman. IATA's cost data give a lower $104bn for 2024. Engines take half of spend. Oliver Wyman expects $193bn by 2036.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2025
$136bn
Range
$104bn–$136bn
Forecast
$193bn by 2036 (Oliver Wyman); maintenance segments $252bn by 2044 (Airbus)
Growth
3.3% a year (2026–2036); up 8% in 2025

Market size

The commercial aircraft maintenance, repair and overhaul (MRO) market was worth about $136bn in 2025, up 8% from $126bn in 2024, according to Oliver Wyman's Global Fleet and MRO Market Forecast 2026–2036, published in February 2026. The same forecast, in the executive summary distributed by the Aeronautical Repair Station Association (ARSA), puts 2026 spend at $139.6bn and projects $193.1bn by 2036, a 3.3% compound rate.

IATA's Maintenance Cost Exchange report for FY2024 gives a lower figure: global MRO spend of $104bn in 2024, up from $94bn in 2023, equal to 11.5% of airline operating costs. The gap reflects method (IATA works from airline-reported costs, Oliver Wyman from fleet-based modelling), so we show both as the range. Airbus's Global Services Forecast (October 2025) values on-wing and off-wing maintenance at about $128bn in 2025 (our sum of $107bn and $21bn), between the two.

MeasureValuePeriodSource
Commercial MRO spend$136bn (+8%)2025Oliver Wyman
Commercial MRO spend$139.6bn2026Oliver Wyman via ARSA
Commercial MRO spend$193.1bn2036Oliver Wyman via ARSA
Global MRO spend (airline cost basis)$104bn2024IATA MCX FY2024
Off-wing plus on-wing maintenanceabout $128bn2025Airbus GSF (our sum)
Commercial support and services, 20 years$4.9tn2026–2045Boeing SMO

Market structure

  • Engines are half the market. Oliver Wyman splits 2026 spend into engine $70.1bn (50.2%), airframe $27.8bn (19.9%), component $24.0bn (17.2%) and line maintenance $17.7bn (12.7%). IATA's cost data agree: engines were 50% of 2024 spend, components 18% and airframe 17%. Engine MRO is also the fastest-growing segment, reaching $102.6bn by 2036.
  • North America and Western Europe still lead. They account for $31.8bn (22.8%) and $28.0bn (20.1%) of 2026 spend. Asia excluding China is $21.7bn, China $19.8bn, the Middle East $18.6bn and India only $3.1bn.
  • Growth is shifting east. India's fleet is forecast to grow 7.1% a year to 2036, the Middle East 5.2% and China 4.3%, against a global fleet rate of 3.2%. The fleet rises from 30,046 aircraft in 2026 to 41,135 in 2036.
  • Unit costs. IATA's sample of 28 airlines and 2,703 aircraft spent $13.19bn on maintenance in FY2024, or $1,522 per flight hour, $3,758 per flight cycle and $5.05m per aircraft.
  • Services beyond MRO are far larger. Boeing's 2026 Services Market Outlook values all commercial support and services at $4.9tn over 2026–2045 and expects demand for 728,000 new maintenance technicians; Airbus expects 705,000 by 2044.

How this estimate was made

  1. The headline is Oliver Wyman's $136bn for 2025, the most-quoted figure and the only one with a published series to 2036.
  2. The low end of the range is IATA's $104bn for 2024, airline-reported cost rather than modelled spend; we did not inflate it to 2025. The high end is Oliver Wyman's 2025 figure.
  3. The Airbus maintenance figure of about $128bn is our addition of its off-wing ($107bn) and on-wing ($21bn) segments for 2025; Airbus does not publish that subtotal. Its $311bn 2044 total includes training, modifications and digital services, so it is not comparable to MRO alone.
  4. Boeing's $4.9tn is a 20-year cumulative total for all commercial services and is shown for context only.
  5. Known conflicts: Oliver Wyman's web page quotes both 3.3% and 3.7% for MRO growth; we use the 3.3% that matches the published 2026 and 2036 values. IATA's report says 2024 spend is 11.7% above 2019, but its own table implies about 27%.

Questions

How big is the aircraft MRO market?

About $136bn in 2025 according to Oliver Wyman, rising to $139.6bn in 2026. IATA's airline cost data give a lower $104bn for 2024.

What share of MRO spend goes on engines?

About half. Oliver Wyman puts engine MRO at $70.1bn of $139.6bn in 2026 (50.2%), and IATA's 2024 cost data also show engines at 50%.

How fast is the MRO market growing?

Oliver Wyman forecasts 3.3% a year from 2026 to 2036, reaching $193.1bn. Spend rose 8% in 2025 as airlines kept older aircraft flying while new deliveries lagged.

What does maintenance cost per aircraft?

IATA's FY2024 sample of 28 airlines spent an average of $5.05m per aircraft and $1,522 per flight hour on maintenance, equal to 11.5% of operating costs across the industry.

Sources

  1. Global Fleet and MRO Market Forecast 2026–2036, Oliver Wyman, 27 February 2026.
  2. 2026 Global Fleet and MRO Market Report, executive summary, Oliver Wyman for ARSA, March 2026.
  3. Airline Maintenance Cost Executive Commentary FY2024, IATA Maintenance Cost Exchange, January 2026.
  4. Airbus projects resilient growth of services market in the next 20 years, Airbus, 9 October 2025.
  5. Boeing forecasts $4.9 trillion commercial aviation support and services market, Boeing, 17 July 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.