the decision pattern.TDP.

US aluminium extrusion market size 2025

The US aluminium extrusion market is worth about $8.4bn in 2025 on MarketsandMarkets' estimate, or 3.0 million tonnes by IMARC's count. Shipments slipped 1.4% to September 2025 while Section 232 tariffs rose to 50%, lifting billet premiums and conversion charges into 2026.

Indicative estimateResearched 2 November 20265 linked sources
Market size 2025
$8.4bn
Range
$8.4bn (MarketsandMarkets, value) to $11.9bn (our metal-value calculation); 3.0 million tonnes by volume
Forecast
$11.5bn by 2030; 4.2 million tonnes by 2034
Growth
6.5% a year (2025–2030) by value; shipments down 1.4% through September 2025

Market size

MarketsandMarkets values US aluminium extrusion at $7.96bn in 2024 and $8.37bn in 2025, rising to $11.49bn by 2030 at 6.5% a year. Construction and infrastructure take about half of that (49.9%), automotive and mass transport 25.6%, electrical 12.3% and machinery 9.3%. IMARC measures the market by weight instead: 3.0 million tonnes in 2025, growing 3.71% a year to 4.2 million tonnes by 2034.

The two figures do not sit comfortably together. At the 2025 average US ingot price of 180 cents per pound reported by the US Geological Survey, 3.0 million tonnes of aluminium would be worth about $11.9bn before any conversion charge; that is our calculation. Extruded products sell above ingot, so either the value estimate is low or the volume is high. We publish the value figure as the headline and the metal-value figure as the top of the range.

MeasureFigureSource / period
Market value, US$7.96bn (2024), $8.37bn (2025)MarketsandMarkets, base year 2025
Market volume, US3.0 million tonnesIMARC, 2025
Metal value of that volumeabout $11.9bnOur calculation (3.0 Mt x 180 c/lb)
Extruded product shipmentsdown 1.4%Aluminum Association via S&P Global, Jan–Sept 2025
New extrusion ordersup 5.1%Aluminum Association via S&P Global, Jan–Nov 2025
US apparent aluminium consumption (all forms)5.7 million tonnes, down from 5.83USGS, 2025 estimate
Section 232 tariff on aluminium25% from March 2025; 50% from June 2025S&P Global

What is driving it

  • Tariffs are reshaping costs. The Section 232 duty rose from 10% to 25% in March 2025 and to 50% in June, and was extended to extrusions. Spot 6063 billet upcharges climbed from 8.5–10 cents per pound at the start of 2025 to 13–15 cents at year end, and 2026 toll conversion charges were quoted at 30–35 cents per pound against the low 20s in 2025.
  • Demand is mixed. The Aluminum Association's data show extruded shapes down 2.2% and pipe and tube up 4.6% through September 2025. Extruders told S&P Global that solar, data centres and EV charging grew while truck trailers and much of construction fell.
  • Imports are shifting, not shrinking. US imports of semi-fabricated aluminium (all products, not just extrusions) rose 30.6% to 423,000 tonnes in Q1 2026, with South Korea at 95,000 tonnes and China up 207% to 69,700 tonnes, while Canada fell 46%.
  • A thin domestic metal base. USGS puts 2025 US primary production at 660,000 tonnes against apparent consumption of 5.7 million tonnes, so extruders rely on imported billet and recycled scrap. The ingot price averaged 180 cents per pound in 2025, up from 129.5 cents.

How this estimate was made

  1. The headline is MarketsandMarkets' $8.37bn for 2025, the only recent US-specific value estimate we could read. Its page is undated, so we treat it with caution.
  2. IMARC's 3.0 million tonnes gives the volume view. We did not find a public Aluminum Association or Aluminum Extruders Council shipment total for 2025 in tonnes; S&P Global reports the association's percentage changes only.
  3. The $11.9bn metal-value figure is our calculation: 3.0 million tonnes converted to pounds (about 6.6 billion) and multiplied by the USGS 2025 ingot price of 180 cents. It excludes conversion margins and so understates sales value if the volume is right.
  4. Confidence is low because the two paid-report figures conflict and no official source values extrusions separately. USGS data cover all aluminium forms.
  5. Forecasts are the publishers' own. The 2026 outlook from extruders quoted by S&P Global is demand up or down 2% to 5%.

Questions

How big is the US aluminium extrusion market?

About $8.4bn in 2025 according to MarketsandMarkets, or 3.0 million tonnes according to IMARC. Valued at the 2025 ingot price alone, that tonnage would be worth about $11.9bn, which is our calculation.

What are aluminium extrusions used for in the US?

Construction and infrastructure take about 50% of market value, automotive and mass transport 26%, electrical and electronics 12% and machinery 9%, per MarketsandMarkets. Growth areas named by extruders in 2025 were solar, data centres and EV charging.

How have tariffs affected US aluminium extrusion?

The Section 232 tariff rose to 25% in March 2025 and 50% in June 2025 and now covers extrusions. Billet upcharges and conversion charges rose through 2025, and 2026 contract conversion charges were quoted at 30–35 cents per pound.

Sources

  1. US aluminum extruders remain cautious for 2026 after an up-and-down 2025, S&P Global Commodity Insights, 30 January 2026.
  2. Mineral Commodity Summaries 2026: Aluminum, US Geological Survey, February 2026.
  3. United States Aluminum Extrusion Market Size, Share and Forecast 2026–2034, IMARC Group, updated 1 September 2026.
  4. US Aluminum Extrusion Market analysis, MarketsandMarkets, undated (base year 2025).
  5. US aluminium semis import jumps 30.6% in Q1 2026 as Korea, China take the lead, AlCircle, 1 September 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.