Market size
The most widely used measure is Alltech's annual Agri-Food Outlook, which surveys feed mills in 142 countries. Its 2026 edition puts world feed production at about 1.44 billion tonnes in 2025, nearly 3% (more than 40 million tonnes) above 2024. The 2025 edition had recorded 1.396 billion tonnes for 2024, up 1.2%, so growth accelerated.
Value is less settled. The International Feed Industry Federation (IFIF) puts world compound feed at about one billion tonnes a year with turnover of over $400bn. Towards FnB, a paid-report publisher, sizes the compound feed market at $583.08bn in 2024 and $614.57bn in 2025. The gap reflects different tonnage bases and scope, so volume is the headline and value is given as a range.
| Measure | Figure | Period and source |
|---|---|---|
| World feed production | about 1.44 billion tonnes (+2.9%) | 2025, Alltech |
| World feed production | 1.396 billion tonnes (+1.2%) | 2024, Alltech |
| Feed mills surveyed | 38,837 in 142 countries | 2026 Outlook, Alltech |
| Industry turnover | over $400bn | June 2025, IFIF |
| Compound feed market value | $614.57bn | 2025, Towards FnB |
| EU27 compound feed | 147.5 million tonnes (+0.4%) | 2025 estimate, FEFAC |
Who produces it
- Three countries make almost half. China (330.1 million tonnes, +4.8%), the United States (267.4 million, −0.8%) and Brazil (89.9 million, +2.8%) together produced nearly 48% of global tonnage in 2025. The top ten made 65%.
- Asia is the centre of gravity. Asia produced 559 million tonnes in 2025. North America made 288 million (−0.7%), Europe 274 million (+1%), Latin America 204 million, Africa and the Middle East 102.5 million combined, with Africa up 12%, and Oceania 11.1 million.
- Poultry dominates. Broiler feed reached 400.4 million tonnes (+3.7%) and layer feed 180.1 million (+3.2%). Pig feed was 380.9 million (+3.0%), dairy 170.3 million (+2.6%), beef 134.2 million (+0.5%), aquaculture 55.5 million (+4.7%) and pet food 39.3 million (+2.4%).
- Europe is flat. FEFAC, the EU feed manufacturers' federation, estimates EU27 compound feed at 147.5 million tonnes for 2025, up 0.4%, with poultry feed at 50.7 million tonnes (+1.5%), pig feed at 47.3 million (−0.5%) and cattle feed at 41.6 million. Spain is the largest EU producer of both pig and cattle feed.
How this estimate was made
- The headline is Alltech's 1.44 billion tonnes for 2025 because it is the only annual, mill-level global survey and the figure most trade bodies and press cite. Alltech is a feed additive company, so the survey is industry-produced rather than official.
- For value we show IFIF's "over $400bn" (based on about one billion tonnes of compound feed) and Towards FnB's $614.57bn for 2025 as the range. We did not average them; the scopes differ.
- The 2.9% growth rate is Alltech's own; the 5.4% value growth is Towards FnB's forecast to 2034. We did not build our own forecast.
- FEFAC's EU estimate (147.5 million tonnes) is a regional cross-check and is not reconciled with Alltech's 274 million tonnes for all of Europe, which covers a wider geography and feed definition.
- Confidence is medium: the volume figure is a single well-established survey, and the value estimates disagree by about 50%.
Questions
How big is the global animal feed market?
About 1.44 billion tonnes of feed were produced in 2025, according to Alltech's 2026 Agri-Food Outlook. In value, IFIF puts industry turnover at over $400bn, while Towards FnB estimates the compound feed market at $614.57bn for 2025.
Which country produces the most animal feed?
China, with 330.1 million tonnes in 2025 (up 4.8%), followed by the United States at 267.4 million tonnes and Brazil at 89.9 million tonnes. The three together account for nearly 48% of world output.
Is global feed production growing?
Yes. Alltech recorded growth of nearly 3% in 2025 after 1.2% in 2024. Aquaculture (+4.7%) and broiler feed (+3.7%) grew fastest; beef feed was almost flat at +0.5%.
How much feed does the EU produce?
FEFAC estimates EU27 compound feed production at 147.5 million tonnes in 2025, up 0.4% on 2024. Poultry feed is the largest category at 50.7 million tonnes, ahead of pig feed at 47.3 million tonnes.
Sources
- Alltech: Global feed output soars in 2025, World Grain (reporting the 2026 Alltech Agri-Food Outlook), 21 April 2026.
- Global feed production rebounds in 2024, Feedstuffs (reporting the 2025 Alltech Agri-Food Outlook), 30 April 2025.
- IFIF Fact Sheet, International Feed Industry Federation, June 2025.
- FEFAC: EU compound feed production remains stable in 2025, Feed & Additive Magazine, 17 December 2025.
- Compound Feed Market Size to Exceed USD 986.58 Billion by 2034, Towards FnB via GlobeNewswire, 2 December 2025.