the decision pattern.TDP.

Canada animation and VFX market size 2025

Animation production in Canada was worth about C$1.37bn in 2024/25: C$1.03bn of foreign service work and C$339m of Canadian content, according to CMPA Profile 2025. The sector is recovering from a slump that cut Quebec's animation and VFX jobs by two thirds.

Medium confidenceResearched 2 November 20268 linked sources
Market size 2025
C$1.37bn animation production volume (2024/25)
Range
C$1.37bn (CMPA animation volume, 2024/25)–C$1.9bn (Statistics Canada sector revenue, 2023)
Forecast
C$1.4bn–C$1.7bn by 2027/28 (our scenario); US$439.9m VFX-only by 2034 (IMARC)
Growth
foreign-service animation up 23%, Canadian animation up 65% (2024/25)

Market size

The Canadian Media Producers Association (CMPA) measures animation in two parts. Foreign location and service (FLS) animation, work done by Canadian studios for foreign producers, reached C$1.03bn in 2024/25, up from C$837m a year earlier, even though the number of projects fell from 129 to 98. Canadian-content animation (television and theatrical features certified by CAVCO) reached C$339m, up 65.4% from C$205m. Adding the two gives about C$1.37bn of animation production volume in 2024/25 (our calculation, for the year to 31 March 2025).

That figure understates the sector because CMPA does not separate VFX work on live-action films and series, which sits inside the C$5.32bn FLS total. The Globe and Mail, citing Statistics Canada, puts animation and VFX sector revenue at C$1.9bn in 2023, nearly triple the 2015 level. We use CMPA's figure as the headline because it is dated and defined, and the Statistics Canada figure as the top of the range.

MeasureValuePeriod / source
FLS animation productionC$1.03bn (from C$837m)2024/25, CMPA Profile 2025
Canadian-content animationC$339m (from C$205m)2024/25, CMPA Profile 2025
Animation total (our calculation)about C$1.37bn2024/25
Animation and VFX sector revenueC$1.9bn2023, Statistics Canada via The Globe and Mail
All film and TV production in CanadaC$10.17bn (+4.6%)2024/25, CMPA Profile 2025
All FLS productionC$5.32bn (+9.5%)2024/25, CMPA Profile 2025
Canada VFX market (modelled)US$229.7m2025, IMARC

Market structure

  • Foreign clients dominate. Three quarters of measured animation volume is service work for foreign (mostly US) studios and streamers. About 97% of FLS projects are copyrighted outside Canada, so Canadian studios earn fees rather than owning the shows.
  • Three provincial hubs. FLS production in 2024/25 was 40% British Columbia, 30% Ontario and 22% Quebec. Metro Vancouver's animation and VFX spend passed C$1bn around 2019 with more than 60 studios and 10,000 jobs, according to the Vancouver Economic Commission; Montréal International reports more than C$1.1bn of VFX and animation investment projects since 2018.
  • Quebec's slump. Quebec's permanent animation and VFX jobs fell from 8,037 in 2022 to 2,603 in 2024 after the Hollywood strikes and a March 2024 change that raised Quebec's base credit from 20% to 25% but capped the share of a contract eligible at 65%. The Quebec Film and Television Council counted 4,167 jobs lost between January 2023 and August 2024, with at least four studios closed.
  • Shorter orders. Producers now typically commission a single eight-episode season rather than three or four seasons of 24 episodes; a May 2025 poll found 82% of Ontario animation studios had laid off staff.

How this estimate was made

  1. The headline is our sum of two CMPA Profile 2025 figures: FLS animation (C$1.03bn) and Canadian-content animation (C$339m). Both come from CAVCO and CRTC certification data and cover the fiscal year April 2024 to March 2025.
  2. The range top is Statistics Canada's C$1.9bn sector revenue for 2023, as reported by The Globe and Mail. Scopes differ: it is calendar-year studio revenue including VFX, while CMPA counts production budgets for animation only.
  3. IMARC's US$229.7m estimate for the Canadian VFX market in 2025 is far below both; it appears to define the market narrowly and we show it only to flag the disagreement.
  4. Growth rates are our calculations from CMPA's two-year figures: FLS animation rose 23% and Canadian animation 65% in 2024/25, a partial rebound from the 26.6% fall in FLS production in 2023/24.
  5. The 2027/28 outlook is our own scenario, not a published forecast: holding volume flat gives about C$1.4bn, and 7% a year (close to IMARC's VFX growth rate) gives about C$1.7bn. Confidence is medium because VFX is not separately measured and employment data show the sector is still contracting in Quebec.

Questions

How big is the animation industry in Canada?

Animation production in Canada was worth about C$1.37bn in 2024/25, combining C$1.03bn of foreign service work and C$339m of Canadian content (CMPA Profile 2025). Including VFX, Statistics Canada put sector revenue at C$1.9bn in 2023.

Where is Canadian animation and VFX work done?

British Columbia took 40% of foreign service production in 2024/25, Ontario 30% and Quebec 22%. Metro Vancouver has more than 60 animation and VFX studios, and Montreal hosts Framestore, DNEG, Cinesite and Rodeo FX.

Why are Canadian VFX studios laying people off?

The 2023 Hollywood strikes, fewer and shorter series orders, and Quebec's 2024 cap on its tax credit cut Quebec's permanent animation and VFX jobs from 8,037 in 2022 to 2,603 in 2024. Cinesite's Quebec headcount fell from about 600 to 360.

Is Canadian animation growing again?

Partly. Foreign service animation rose 23% and Canadian animation 65% in 2024/25, but project counts fell and volumes remain below 2021/22 and 2022/23 levels.

Sources

  1. Profile 2025: Economic Report on the Screen-Based Media Production Industry in Canada (Summary), Canadian Media Producers Association, April 2026.
  2. Profile 2025, section 7.1: Foreign location and service production, total production and types, Canadian Media Producers Association, 2026 (2024/25 data).
  3. Profile 2025, section 2.5: Animation (Canadian content production), Canadian Media Producers Association, 2026 (2024/25 data).
  4. Canada's animation and visual effects industry faces job losses, tax changes and AI, The Globe and Mail, late 2025 (undated on page).
  5. Quebec's animation and VFX industries are collapsing, over 50% of all jobs lost in 20 months, Cartoon Brew, 3 September 2024.
  6. Visual Effects and Animation Industry Profile, 2025 edition, Montréal International, 2025.
  7. Toon Town: Vancouver's animation and visual effects industry cracks the billion-dollar mark, BCBusiness, undated (about 2019).
  8. Canada Visual Effects Market Size, Share and Forecast 2026-2034, IMARC Group, updated 11 August 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.