the decision pattern.TDP.

US athleisure market size 2025

The US athleisure market was worth roughly $102bn to $107bn in 2025 according to two paid-report publishers. Nike's North America sales of $20.5bn and Lululemon's flat Americas revenue show how the biggest brands are faring. No official US measurement exists.

Indicative estimateResearched 2 November 20268 linked sources
Market size 2025
$102bn–$107bn
Range
$102.1bn–$106.5bn (IMARC and Precedence Research estimates)
Forecast
$186.1bn by 2034 (IMARC) or $165.7bn by 2035 (Precedence)
Growth
6.9%–9.6% a year (2026–2034/35, publisher forecasts)

Market size

The two publishers that put a dollar figure on the US athleisure market agree more closely than usual. IMARC puts it at $102.1bn in 2025, and Precedence Research at $106.51bn. Both define athleisure broadly: apparel and footwear designed for sport but worn for everyday life, sold through brand stores, department stores, sporting goods chains and online. Neither publishes its method in detail, so we treat the pair as a range, not a measurement, and set confidence low.

Grand View Research gives no US figure but says North America took 32.83% of a $422.0bn global market in 2025, about $138bn for the US and Canada (our calculation). No official US statistic or Circana release covers athleisure apparel as one category; Circana does measure footwear, where total US sales held at about $90bn in 2025 and the athleisure segment was $31bn in 2024.

MeasureFigurePeriodSource
US athleisure market$102.1bn2025IMARC
US athleisure market$106.51bn2025Precedence Research
North America share of global athleisure32.83% of $422.0bn2025Grand View Research
US footwear sales (all types)about $90bn, flat2025Circana via MR Magazine
US athleisure footwear sales$31bn2024Circana via SGI Europe
Nike Brand North America revenue$20.5bn, up 5%FY2026 (to May 2026)Nike
Lululemon Americas revenuedown 1%FY2025 (to Feb 2026)Lululemon

Leading players

  • Nike remains the anchor. Nike Brand North America revenue rose 5% to $20,511m in fiscal 2026: footwear $13,317m (up 5%), apparel $6,075m (up 4%), equipment $1,119m (up 6%). Group revenue was flat at $46.4bn, so North America offset declines in Greater China and EMEA.
  • Lululemon has stalled at home. Fiscal 2025 revenue rose 5% to $11.1bn, but Americas revenue fell 1% and Americas comparable sales fell 3%. Fiscal 2026 guidance is $11.35bn to $11.5bn, growth of 2% to 4%.
  • Performance footwear is growing fastest. Circana found performance footwear dollars up 6% in 2025, with running and walking each up 9%, while fashion footwear fell 2%. Sport lifestyle, the largest segment, rose 3% in the first half of 2025.
  • Prices, not units, drove 2025. Circana's fourth-quarter 2025 footwear data showed dollars up 2%, average prices up 8% and units down.

Why estimates disagree

  • Scope. "Athleisure" has no agreed boundary. IMARC and Precedence include footwear and apparel; Circana's $31bn athleisure figure covers footwear alone.
  • Fiscal years. Nike reports to May and Lululemon to late January or early February, so neither lines up with calendar 2025.

How this estimate was made

  1. The headline is the span between IMARC's $102.1bn and Precedence Research's $106.51bn for 2025, the only two published US dollar figures we could fetch and read. Because both are paid-report publishers with undisclosed methods, confidence is low despite their agreement.
  2. As a cross-check, we multiplied Grand View Research's 32.83% North America share by its $422.0bn global figure to get about $138bn for North America (our calculation). A US figure of $102bn to $107bn fits inside that once Canada is excluded.
  3. The forecast and growth fields repeat the publishers' own projections: IMARC's 6.9% a year to $186.1bn by 2034, and Precedence's 9.57% a year to $165.67bn by 2035. The publishers use different base years and horizons, so the lower rate gives the higher end point.
  4. What is missing: a Circana or US Census figure for US activewear apparel as a category. If one is published, it should replace the publisher range as the headline.

Questions

How big is the US athleisure market?

About $102bn to $107bn in 2025. IMARC estimates $102.1bn and Precedence Research $106.51bn. Both include apparel and footwear and neither is an official measurement.

How fast is US athleisure growing?

The two publishers forecast 6.9% to 9.6% a year to 2034 or 2035. Company results point to slower growth in the near term: Nike's North America revenue rose 5% in fiscal 2026 and Lululemon's Americas revenue fell 1% in fiscal 2025.

Who are the biggest athleisure brands in the United States?

Nike is the largest, with $20.5bn of North America revenue in fiscal 2026, of which $6.1bn was apparel. Lululemon's total revenue was $11.1bn in fiscal 2025, with the Americas as its largest region.

Sources

  1. United States Athleisure Market Size, Share, Trends and Forecast 2026-2034, IMARC Group, 2026.
  2. Athleisure Market Size, Share and Trends 2026 to 2035, Precedence Research, 2026.
  3. Athleisure Market Size, Share and Trends Analysis Report 2026-2033, Grand View Research, June 2026.
  4. NIKE, Inc. Reports Fiscal 2026 Fourth Quarter and Full Year Results, Nike via Business Wire, 30 June 2026.
  5. lululemon athletica inc. Announces Fourth Quarter and Full Year Fiscal 2025 Results, Lululemon via Business Wire, 17 March 2026.
  6. Circana issues Q4 2025 Footwear Industry Pulse report, MR Magazine, 5 February 2026.
  7. Sales for the US footwear industry reached $89.2 billion in 2024, SGI Europe (Circana data), 5 February 2025.
  8. Active footwear a bright spot in the first half of the year, Retail Dive (Circana data), 19 August 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.