the decision pattern.TDP.

UK bathroom products and sanitaryware market size 2025

The UK bathroom products market is worth about £1.0bn a year at manufacturer prices, our back-calculation from Barbour ABI's forecast of £1,137m by 2028. At retail prices it is larger, near £1.6bn. Imports make up about 75% of value.

Indicative estimateResearched 2 November 20267 linked sources
Market size 2025
about £1.0bn (manufacturer selling prices)
Range
about £1.0bn (manufacturer prices, our back-calculation)–£1.6bn (retail prices including VAT, Mintel projection made in 2021)
Forecast
£1,137m by 2028 (manufacturer selling prices)
Growth
about 4% a year to 2028 (Barbour ABI); 16% over 2024–2029 (Mintel, retail)

Market size

Barbour ABI, the construction data firm, forecasts that the UK bathroom market will reach £1,137m by 2028, measured at manufacturer selling prices (MSP). It expects growth of about 4% in 2028. Working back at 3% to 4% a year gives about £1.0bn for 2025 at manufacturer prices, in a range of £1,011m to £1,041m. This is our own back-calculation, not a published 2025 figure. Barbour ABI recorded a fall of 1% in 2023, a 16% fall in 2020 and a 16% rebound in 2021.

Retail-price measures are higher because they include retail margin and VAT. Mintel valued the market at £1.4bn including VAT in 2020 and projected about £1.6bn by 2025. Victorian Plumbing quoted those figures in 2021. Mintel's 2024 report forecasts 16% growth between 2024 and 2029, but its current value figure is behind a paywall.

MeasureValuePeriodSource
Bathroom market at MSP, forecast£1,137m2028Barbour ABI
Bathroom market at MSP, back-calculatedabout £1.0bn2025our calculation
Bathroom market, retail incl. VAT£1.4bn2020Mintel via Victorian Plumbing
Bathroom market, retail incl. VAT, projectionabout £1.6bn2025Mintel via Victorian Plumbing
BMA member salesover £1.18bn2021BMA via kbbreview

Market structure

  • Sanitaryware is the largest product group. Baths and sanitaryware, including installation frames, made up about 45% of value in 2024, and accessories about 25%. With taps and mixers, these three groups account for 84% of the market.
  • Mostly imported. Barbour ABI estimates that imports make up about 75% of market value.
  • Housing drives demand. Homes account for about 80% of the market, and commercial buildings such as hotels and care homes for about 20%.
  • Trade and online channels. Trade distributors, home improvement and retail multiples, and online retailers together hold 80% of sales. In Mintel's 2024 report, showers are the single largest product, at about a quarter of sales.
  • Victorian Plumbing keeps gaining share in a subdued market. The online retailer's revenue rose 5% to £310.0m in the year to September 2025. It says it is gaining share "in a subdued market" and calls itself the UK's leading bathroom retailer, citing Mintel. In 2020 its share was over 14%.

How this estimate was made

  1. We found no published 2025 total. The headline is our back-calculation from Barbour ABI's 2028 forecast of £1,137m: £1,137m ÷ 1.04³ ≈ £1,011m and £1,137m ÷ 1.03³ ≈ £1,041m. This is our calculation, not a published figure.
  2. The top of the range is Mintel's 2025 projection of about £1.6bn at retail prices including VAT. It was made around 2021, so it is an old forecast, not a measurement. Retail and manufacturer prices are different scopes, which explains most of the gap.
  3. A cross-check: Bathroom Manufacturers Association members sold over £1.18bn in 2021 and cover about 80% of the market by value. That implies about £1.48bn in total for 2021 (our calculation). BMA sales may count products and channels that Barbour ABI leaves out.
  4. Confidence is low because the only recent figures are paid-report forecasts, and the BMA's latest public total is from 2021.

Questions

How big is the UK bathroom market?

At manufacturer prices it is about £1.0bn a year, our back-calculation from Barbour ABI's forecast of £1,137m by 2028. At retail prices including VAT, Mintel projected about £1.6bn for 2025.

How much of the UK bathroom market is imported?

About 75% of market value, according to Barbour ABI.

Who is the biggest bathroom retailer in the UK?

Victorian Plumbing calls itself the UK's leading bathroom retailer, citing Mintel. Its revenue was £310.0m in the year to September 2025, and it held over 14% of the market in 2020.

Sources

  1. Sustainability and smart technology: key drivers in the UK bathroom market forecast, Barbour ABI, undated (21st edition, 2024–2028).
  2. From imports to innovations: key drivers in the UK bathroom market, Barbour ABI, undated (2024 data).
  3. Bathroom Market Report UK 2024-2028, Barbour ABI, undated (2023 data).
  4. UK Bathrooms and Bathroom Accessories Market Report, Mintel, 14 August 2024.
  5. Our market, Victorian Plumbing Group plc, last updated 18 June 2021.
  6. Full year results FY25, Victorian Plumbing Group plc, 3 December 2025.
  7. Record-breaking year for bathroom manufacturers with £1.2bn in sales, kbbreview, 20 January 2022.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.