the decision pattern.TDP.

Europe building insulation market size 2026

Europe's building insulation materials market is estimated at about $8.9bn in 2026 by MarkNtel Advisors, with about 210 million cubic metres used a year. Other publishers' figures imply a larger market, so treat the value as a lower bound.

Indicative estimateResearched 2 November 20266 linked sources
Market size 2026
$8.9bn
Range
Publishers disagree widely; Freedonia's mineral wool forecast alone implies about €8.1bn for 2023
Forecast
$12.06bn by 2032 (MarkNtel Advisors)
Growth
4.5% a year (2026–2032, MarkNtel); mineral wool 3% a year (2023–2028, Freedonia)

Market size

No official body publishes the value of Europe's insulation market, so the figures come from paid-report publishers. MarkNtel Advisors estimates the European building insulation materials market at about $8.86bn in 2026, growing about 4.5% a year to $12.06bn by 2032. Mineral wool makes up about 52% of that value, residential buildings about 54%, and Germany more than 26%.

Other figures point to a larger market. Freedonia Group forecasts European mineral wool insulation alone at €9.44bn and 3.2 million tonnes by 2028, growing 3% a year from 2023. Working back at 3% a year implies about €8.1bn for mineral wool in 2023 (our calculation), against about $4.6bn for mineral wool in MarkNtel's 2026 total (our calculation: 52% of $8.86bn). Freedonia's scope may include industrial insulation, which could explain part of the gap. In volume terms, Ceresana puts European insulation use in construction at about 210 million cubic metres a year.

MeasureValuePeriodSource
Building insulation materials$8.86bn2026 (estimate)MarkNtel Advisors
Building insulation materials$12.06bn2032 (forecast)MarkNtel Advisors
Mineral wool insulation€9.44bn, 3.2Mt2028 (forecast)Freedonia Group
Mineral wool insulationabout €8.1bn2023Our calculation from Freedonia
Insulation used in constructionabout 210 million m³ a year2024 baseCeresana
Rockwool insulation segment sales (global)€3.21bn2025Rockwool

Leading players and demand

  • Rockwool. The Danish stone wool maker's insulation segment had sales of €3,206m in 2025, up 1.5% in local currencies and 3.4% excluding Russia. In Western Europe, Benelux, Italy and Spain performed well while the UK and Switzerland declined. Rockwool guides to 2% to 4% revenue growth in 2026.
  • Kingspan. The Irish insulated panels and boards group had revenue of €9.2bn in 2025, up 7%. Sales rose 12% in Central and Northern Europe and 4% in Western and Southern Europe. This is global revenue and includes non-insulation products.
  • Weak construction, steady renovation. Ceresana reports that European insulation demand fell over the two years to 2024, with a slight stabilisation in construction expected from 2026, and slower recovery in Italy and France after their support programmes ended. Non-residential construction output in Europe has fallen 11% since 2019, according to Global Insulation.

How this estimate was made

  1. We use MarkNtel's $8.86bn as the headline because it is the only recent published total for European building insulation we could read in full. It is a paid-report estimate.
  2. Freedonia's mineral wool forecast was converted to a 2023 base by dividing €9.44bn by 1.03 five times, giving about €8.1bn (our calculation). That figure for one material is close to MarkNtel's figure for all materials, so the two sources disagree by well over 50% on comparable scope.
  3. Rockwool and Kingspan figures are global and show supplier scale, not the market total.
  4. We could not read the value tables in Ceresana's or Freedonia's full European studies, nor a recent value estimate from EURIMA, the industry body. Confidence is therefore low.

Questions

How big is the European insulation market?

MarkNtel Advisors estimates European building insulation materials at about $8.86bn in 2026. Freedonia's mineral wool forecast suggests the full market is larger, so treat this as a lower bound.

How much insulation is used in Europe each year?

About 210 million cubic metres of insulation materials are used in European construction each year, according to Ceresana.

What is the most common insulation material in Europe?

Mineral wool (stone and glass wool) holds about 52% of the market by value in MarkNtel's estimate. EPS foam is the fastest-growing material, according to Ceresana.

Who are the largest insulation companies in Europe?

Rockwool and Kingspan are among the largest; Rockwool's insulation segment sold €3.21bn in 2025.

Sources

  1. Europe Building Insulation Material Market is projected to reach USD 12.06 billion by 2032, MarkNtel Advisors via Bolsamanía, 25 March 2026.
  2. European mineral wool insulation market to reach €9.44bn in 2028, Global Insulation, 17 October 2024.
  3. Insulation Materials Market Report – Europe, Ceresana, July 2025.
  4. Market Study: Insulation Materials – Europe, 7th edition (brochure), Ceresana, July 2025.
  5. Q4 and FY 2025 investor presentation, Rockwool A/S, undated (FY2025 results, published 2026).
  6. Kingspan grows full-year sales and earnings in 2025, Global Insulation, 28 April 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.