India cement market size 2026

India produced about 491 million tonnes of cement in FY26, up 8.6% on FY25's 453 million tonnes, on an installed base of close to 690 million tonnes a year. UltraTech, Adani Cement and Shree hold about 380 MTPA between them. Volumes, capacity and the FY27 outlook.

High confidenceResearched 2 November 20268 linked sources
Market size 2026
491 million tonnes produced in FY26
Range
482–492 million tonnes
Forecast
525–530 million tonnes in FY27 (our calculation from ICRA's 7–8% growth view)
Growth
8.6% year on year in FY26; 7–8% expected in FY27

Market size

India is measured in tonnes rather than rupees. Production reached about 491 million tonnes in FY26 (the year to March 2026), according to IBEF's May 2026 industry note, which cites ICRA's monthly data. That is 8.6% more than the 453 million tonnes produced in FY25, a figure also given in the Economic Survey 2025-26 as reported by CemNet.

The range on this page is narrow because the sources agree. At the low end, ICRA's January 2026 forecast of 6.5% to 7.5% growth on the FY25 base gives 482 to 487 million tonnes. At the top, the 8.6% growth ICRA reported in April 2026 gives 492 million tonnes.

MeasureFigurePeriodSource
Cement production453 million tonnesFY25IBEF; Economic Survey 2025-26 via CemNet
Cement production491.4 million tonnesFY26IBEF, citing ICRA
Production growth8.6%FY26 vs FY25ICRA, April 2026
Installed capacity668 million tonnes (17 makers, about 85% of the industry)31 March 2025CRISIL Ratings
Installed capacitynearly 690 million tonnes2025Economic Survey 2025-26 via CemNet
Per capita consumptionabout 290 kg (world average 540 kg)2025Economic Survey 2025-26 via CemNet

Leading players

  • UltraTech Cement (Aditya Birla Group) crossed 200 million tonnes a year (MTPA) of capacity in April 2026 after commissioning grinding units in Uttar Pradesh, Jharkhand and Andhra Pradesh. It targets 240 MTPA by the end of FY28.
  • Adani Cement (Ambuja Cements, including ACC) ended FY26 with 109 MTPA and expects about 119 MTPA after projects due in the first half of FY27. It sold 73.7 million tonnes in FY26 on revenue of ₹40,656 crore.
  • Shree Cement had 69.3 MTPA in India after commissioning its Kodla plant in Karnataka, and aims for more than 80 MTPA "in the coming years".
  • Concentration. The three groups hold roughly 380 MTPA, or about 55% of the industry's capacity against the Economic Survey's figure of nearly 690 MTPA (our calculation).

What drives it

  • Housing and infrastructure. ICRA attributes FY26 growth to housing and government infrastructure spending and expects 7% to 8% volume growth in FY27.
  • A capacity build-out. CRISIL Ratings expects 160 to 170 million tonnes of grinding capacity to be added over FY26 to FY28, 75% more than the 95 million tonnes added in the previous three years, with capex of about ₹1.2 lakh crore. About 65% of additions are brownfield.
  • Utilisation stays near 70%. CRISIL puts FY25 utilisation at about 70% against a decadal average of 65%, and ICRA expects 70% to 71% in FY27 even after 85 to 90 MTPA of additions over FY26 and FY27.

How this estimate was made

  1. The headline is FY26 production of 491.4 million tonnes from IBEF's May 2026 note, which draws on ICRA's monthly production series. ICRA's own April 2026 update gives the 8.6% growth rate but not the absolute figure.
  2. The FY25 base of 453 million tonnes appears in both IBEF and the Economic Survey 2025-26 (as reported by CemNet), so we treat it as the anchor.
  3. The range applies ICRA's two published growth figures to that base: 6.5% to 7.5% (January 2026 forecast) gives 482 to 487 million tonnes, and 8.6% (April 2026 actual) gives 492 million tonnes.
  4. The FY27 forecast is our calculation: 491 million tonnes grown by ICRA's 7% to 8% gives 525 to 530 million tonnes. It is not a published tonnage forecast.
  5. Capacity figures differ by scope. CRISIL's 668 million tonnes covers 17 companies (about 85% of the industry); the Economic Survey's "nearly 690" is the whole industry. We have no value-of-sales figure for the industry, so the page is volume only.

Questions

How much cement does India produce a year?

About 491 million tonnes in FY26, up 8.6% from 453 million tonnes in FY25, according to IBEF and ICRA. India is the world's second largest producer after China.

What is India's cement capacity?

Nearly 690 million tonnes a year according to the Economic Survey 2025-26. CRISIL Ratings counts 668 million tonnes across 17 companies covering about 85% of the industry, and expects another 160 to 170 million tonnes to be added over FY26 to FY28.

Who are the largest cement companies in India?

UltraTech Cement crossed 200 MTPA in April 2026 and targets 240 MTPA by FY28. Adani Cement (Ambuja and ACC) had 109 MTPA at the end of FY26, heading for about 119 MTPA. Shree Cement had 69.3 MTPA.

How fast will cement demand grow in India?

ICRA expects volumes to grow 7% to 8% in FY27 after 8.6% in FY26. CRISIL expects incremental demand of 30 to 40 million tonnes a year over FY26 to FY28.

Sources

  1. Production volumes up by 8.6% YoY in FY2026, ICRA monthly update, 24 April 2026.
  2. Growth of cement industry in India: infographic, IBEF, updated May 2026.
  3. India's cement capacity addition to see 75% jump over fiscals 2026-28, CRISIL Ratings, 12 November 2025.
  4. ICRA sees steady cement demand growth ahead, Indian Cement Review, 2 January 2026.
  5. India's per capita cement consumption rises, CemNet (reporting the Economic Survey 2025-26), 6 February 2026.
  6. UltraTech commissions 3 units, overall capacity crosses 200 MTPA, Outlook Business, 18 April 2026.
  7. Ambuja Cements FY26 results, Adani Group media release, 4 May 2026.
  8. Shree Cement Q4 FY26 press release, Shree Cement, 6 May 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.