the decision pattern.TDP.

UK co-working spaces market size 2025

UK co-working space revenue was about $1.94bn in 2025 by Mordor Intelligence's count, within a $3.84bn flexible office market. The UK had 4,270 flexible workspace locations in early 2026, 1,209 of them in London, with a median desk membership of £180 a month.

Indicative estimateResearched 2 November 20266 linked sources
Market size 2025
$1.94bn
Range
$1.94bn (co-working only)–$3.84bn (all flexible offices)
Forecast
$2.99bn by 2031
Growth
7.45% a year (2026–2031)

Market size

The only recent published value we could read is Mordor Intelligence's: the UK co-working office space market generated $1.94bn in 2025, rising to a projected $2.08bn in 2026 and $2.99bn by 2031, a 7.45% compound rate. Mordor publishes in US dollars; no sterling figure is given, so we repeat the dollar values rather than convert them.

Co-working is only part of the flexible office sector. Mordor's separate UK flexible office space report, which adds serviced offices, executive suites, hybrid and virtual offices, puts the whole sector at $3.84bn in 2025, with co-working at 50.85% of that. The two reports are consistent with each other (50.85% of $3.84bn is about $1.95bn, our calculation), but they come from one publisher, so we show the co-working figure as the headline and the full flexible office figure as the top of the range.

Physical counts are better documented. CoworkingCafe's tracking, reported by GCUC UK and Allwork.Space, found 4,199 spaces in the UK and Ireland in the second quarter of 2025 and 4,550 in the first quarter of 2026, of which 4,270 were in the UK.

MeasureFigurePeriod / source
UK co-working revenue$1.94bn2025, Mordor Intelligence
UK flexible office revenue (all types)$3.84bn2025, Mordor Intelligence
Co-working share of flexible office revenue50.85%2025, Mordor Intelligence
Flexible workspace locations, UK4,270Q1 2026, CoworkingCafe via Allwork.Space
Locations in Greater London1,209Q1 2026
Median monthly open-desk membership, UK£180Q1 2026
Average day pass, UK£25Q1 2026
Forecast co-working revenue$2.99bn2031, Mordor Intelligence

Market structure

  • London dominates. Greater London had 1,209 locations in early 2026, more than a quarter of the UK total. Manchester was the largest regional hub with 123, followed by Birmingham, Glasgow, Bristol, Leeds and Edinburgh. England took 86% of 2025 co-working revenue by Mordor's estimate.
  • One very large operator. Regus (part of IWG) had 234 UK locations in the first quarter of 2026, with HQ (also IWG) and Bruntwood next. IWG's group revenue was $3.76bn in 2025 and system-wide revenue $4.45bn, across more than 120 countries; it does not disclose a UK figure.
  • Listed landlords show the pressure on rents. Workspace Group, which lets 3.8m sq ft across 57 London locations to about 4,000 businesses, reported a rent roll of £127.3m at 31 March 2026, down 8.6% on the year, and like-for-like occupancy of 81.6%, down from 83.0%. Rent per sq ft fell 2.1% to £46.31.
  • Pricing is flat to slightly down. The UK median open-desk membership was £180 a month in early 2026; Oxford (£244) and London (£210) were the most expensive and Liverpool and Aberdeen (£139) the cheapest. Day passes averaged £25. In mid-2025 London's average open desk was reported at £203.
  • Who uses it. Mordor estimates enterprises took 52% of 2025 co-working revenue, with start-ups and freelancers the faster-growing group at 8.78% a year. IT and IT-enabled services were the largest customer sector at 36.5%.

How this estimate was made

  1. The headline is Mordor Intelligence's $1.94bn for 2025 because it is the only recent value estimate scoped to UK co-working that we could read in full. Its page was last updated in July 2026.
  2. The top of the range is Mordor's $3.84bn for the whole UK flexible office market (August 2026 edition), which includes serviced and virtual offices. We checked that its co-working share (50.85%) reproduces the co-working figure; it does, within rounding.
  3. Location counts, city splits and prices come from CoworkingCafe data as reported by GCUC UK (Q2 2025) and Allwork.Space (Q1 2026). These are counts and list prices, not revenue, and cover the UK and Ireland separately.
  4. Operator figures come from IWG's 2025 results as reported by Hargreaves Lansdown and from Workspace Group's results for the year to 31 March 2026. Neither is a market total; Workspace is a landlord of managed space, not a pure co-working operator.
  5. Confidence is low because the only value estimates come from a single paid-report publisher, and no official statistic measures co-working revenue. A sterling figure, and an independent second value estimate, are missing.

Questions

How big is the co-working market in the UK?

Mordor Intelligence estimates UK co-working revenue at $1.94bn in 2025, within a $3.84bn flexible office market. There were about 4,270 flexible workspace locations in the UK in the first quarter of 2026.

How many co-working spaces are there in London?

Greater London had 1,209 flexible workspace locations in early 2026, according to CoworkingCafe data reported by Allwork.Space. Manchester, the next largest city, had 123.

How much does a co-working desk cost in the UK?

The UK median open-desk membership was £180 a month in early 2026. Oxford (£244) and London (£210) were the most expensive cities; Liverpool and Aberdeen were the cheapest at £139. Day passes average £25.

Who is the largest co-working operator in the UK?

Regus, part of IWG, with 234 UK locations in early 2026. IWG's 2025 group revenue was $3.76bn worldwide. Among landlords, Workspace Group lets 3.8m sq ft in London at a rent roll of £127.3m.

Sources

  1. United Kingdom Co-Working Office Spaces Market Size and Share Analysis, Mordor Intelligence, updated 8 July 2026.
  2. United Kingdom Flexible Office Space Market Share Analysis, Mordor Intelligence via Global Information Inc, 11 August 2026.
  3. Flexible work market reaches 4,550 locations across UK and Ireland, Allwork.Space, 23 April 2026.
  4. Coworking keeps climbing: 4,199 spaces across the UK and Ireland, GCUC UK, 4 August 2025.
  5. Workspace Group FY25/26 results statement, Workspace Group plc, 10 June 2026.
  6. IWG cautiously optimistic after annual earnings jump, Hargreaves Lansdown, 3 March 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.