Market size
Brazil is the world's largest coffee producer, and the national supply agency Conab measures the crop. Its fourth and final survey of 2025 put production at 56.5 million 60kg bags, up 4.3% on 2024 and the third-largest harvest in Conab's series. Arabica fell 9.7% to 35.76 million bags in a negative biennial year, while conilon (robusta) jumped 42.1% to a record 20.8 million bags.
The export side is measured by the exporters' council Cecafé. Brazil shipped 40.05 million bags in calendar 2025, down 20.8%, but high prices lifted revenue 24.1% to a record US$15.59bn. On a July–June crop-year basis, 2025/26 exports were 38.46 million bags (down 15.7%) worth US$14.60bn, at an average US$379.48 a bag, up 17.4%.
| Measure | Figure | Change | Source |
|---|---|---|---|
| Production, 2025 crop | 56.5 million bags | +4.3% | Conab, 4th survey |
| Arabica / conilon, 2025 | 35.76m / 20.8m bags | −9.7% / +42.1% | Conab |
| Area in production, 2025 | 1.85 million ha | −1.2% | Conab |
| Exports, calendar 2025 | 40.05 million bags | −20.8% | Cecafé |
| Export revenue, calendar 2025 | US$15.59bn | +24.1% | Cecafé |
| Exports, crop year 2025/26 | 38.46 million bags, US$14.60bn | −15.7% / −1.0% | Cecafé |
| Production, 2026 crop | 66.7 million bags | +18% | Conab, 2nd survey |
The range reflects the long-running gap between Conab and the US Department of Agriculture's Foreign Agricultural Service (FAS), which forecast 65 million bags for 2025/26: 40.9 million arabica and 24.1 million robusta, with exports of 41.7 million bags.
What drives it
- The biennial cycle. Arabica trees alternate high and low years. 2025 was a low year, so Conab's second 2026 survey expects arabica to rebound 28% to 45.8 million bags, taking the total crop to a record 66.7 million bags (its first estimate was 66.2 million).
- Conilon's rise. Espírito Santo produced 14.2 million bags of conilon in 2025 (up 43.8%), Bahia 3.29 million (up 68.7%) and Rondônia 2.32 million. Conilon is now more than a third of Brazilian output.
- Prices more than offset lower volumes. Export revenue rose 24.1% in 2025 even as volume fell 20.8%, and the average crop-year price reached US$379.48 a bag.
- US tariffs. A 50% US tariff on Brazilian coffee, in place for about four months, cut shipments to the United States by more than half during that period, according to Cecafé. The US took 5.38 million bags in 2025 (down 33.9%), just behind Germany's 5.41 million (down 28.8%).
How this estimate was made
- The headline is Conab's fourth 2025 survey (4 December 2025), the official Brazilian crop estimate. Conab counts processed (beneficiado) 60kg bags.
- The upper end of the range is the USDA FAS forecast of 65 million bags for the 2025/26 marketing year (July–June), in green bean equivalent. USDA consistently reports a larger Brazilian crop than Conab because it uses different yield assumptions and tree counts; neither agency reconciles to the other.
- The export figures are Cecafé's, quoted in US dollars as published. Cecafé reports both calendar-year and July–June crop-year totals; we show both and label each. Safras & Mercado also reports about R$77bn of export inflows for 2025/26.
- The forecast is Conab's second 2026 survey (66.7 million bags, up 18%), reported by StoneX; the first estimate, reported by Global Coffee Report, was 66.2 million. Conab revises the figure twice more during the year.
- Growth in the front matter is production growth. The value of the domestic market (roasters and retail) is not covered by these sources and is not included.
Questions
How much coffee does Brazil produce?
Conab estimates the 2025 crop at 56.5 million 60kg bags: 35.76 million arabica and 20.8 million conilon. Its second 2026 survey points to a record 66.7 million bags.
How much coffee does Brazil export?
Brazil exported 40.05 million bags in calendar 2025, down 20.8%, earning a record US$15.59bn, according to Cecafé. In the July 2025–June 2026 crop year it shipped 38.46 million bags worth US$14.60bn.
Why do Conab and USDA give different numbers for Brazil's coffee crop?
They use different survey methods and yield assumptions. For 2025 Conab counted 56.5 million bags while USDA FAS forecast 65 million for 2025/26. Both are widely quoted, so always check which agency a figure comes from.
Who buys Brazilian coffee?
Germany (5.41 million bags) and the United States (5.38 million) were the largest buyers in 2025, according to Cecafé. Shipments to the US fell 33.9% after a 50% tariff was imposed for part of the year.
Sources
- Conab: Com maior safra de conilon, produção de café é estimada em 56,5 milhões de sacas em 2025, Notícias Agrícolas (Conab 4th survey), 4 December 2025.
- Exportações de café caem em 2025, mas receita bate recorde, CNN Brasil (Cecafé data), 19 January 2026.
- Brasil exportou 38,4 milhões de sacas de café em 2025/26, Safras & Mercado (Cecafé data), 15 July 2026.
- Conab shares 2026 Brazilian coffee production estimates, Global Coffee Report, 6 February 2026.
- Brazil: Coffee Annual, USDA Foreign Agricultural Service (report BR2025-0013), 2025.
- Conab publishes second coffee crop survey, raises estimate to 66.7 million bags, StoneX, 2026.