the decision pattern.TDP.

Europe commercial vehicles market size 2025

About 1.79 million new commercial vehicles were registered in the EU in 2025: 1.45 million vans, 307,460 trucks and 38,238 buses, down about 8% on 2024 according to ACEA data. This page covers the split by segment, electrification, the fleet in use and what truck makers expect for 2026.

High confidenceResearched 2 November 20266 linked sources
Market size 2025
1.79 million new vans, trucks and buses registered in the EU
Range
1.79 million (2025) – 1.95 million (2024); value estimates exist only for sub-segments
Forecast
EU30 heavy truck market of 290,000–330,000 units in 2026 (Daimler Truck guidance)
Growth
down about 8% in 2025 (our calculation from ACEA data)

Market size

The European Automobile Manufacturers' Association (ACEA) is the reference source for new commercial vehicle registrations. Its full-year release for 2025 shows EU van registrations down 8.8%, truck registrations down 6.2% to 307,460 units and bus registrations up 7.5% to 38,238 units. ACEA does not print the van total in the release, but applying the 8.8% fall to the 1,586,688 vans registered in 2024 gives about 1.45 million (our calculation). Adding the three segments gives about 1.79 million new commercial vehicles in the EU in 2025, against 1.95 million in 2024, a fall of roughly 8%.

ACEA's figures cover the 27 EU member states and count vehicles, not money. We found no official value for the market. The only value estimate we could read is Mordor Intelligence's $51.35bn for the wider Europe light commercial vehicle market in 2025 ($82.90bn by 2031); it is a paid report with a different geography, so we use it only as an indication.

Segment (EU)20242025ChangeElectrically chargeable share 2025
Vans1,586,688about 1.45m (our calculation)-8.8%11.2% (6.1% in 2024)
Trucks over 3.5t327,896307,460-6.2%4.2% (2.3% in 2024)
Buses35,57938,238+7.5%23.8% (18.5% in 2024)
Totalabout 1.95mabout 1.79mabout -8%

What shaped 2025

  • Vans fell in every big market except Spain. Germany (-5.4%), France (-5.6%) and Italy (-5%) all declined while Spain grew 11.7%. Diesel vans dropped 12.8% to 1,168,561 units, an 80.7% share, as electric vans nearly doubled their share.
  • Trucks had a second year of decline. Heavy trucks fell 5.4% and medium trucks 9.9%; Germany was down 12.2% and France 9%. Daimler Truck puts the EU30 heavy-duty market at 296,000 units in 2025 and guides to 290,000–330,000 in 2026.
  • Makers felt it. Traton (Scania, MAN) sold 305,500 vehicles worldwide in 2025, down 9%, though MAN grew 6% to 101,600 units and Traton's all-electric sales rose 86% to 3,230. Mercedes-Benz Trucks sold 159,871 units for revenue of €19.7bn, down 4%, with higher European volumes offsetting North America.
  • The fleet is old. ACEA counts about 31.1 million vans, 6.2 million trucks and 700,000 buses on EU roads. Trucks average 14 years, the oldest of any vehicle type, and only 0.3% of trucks and 1.3% of vans in use are electrically chargeable.

How this estimate was made

  1. The headline is a sum of ACEA's three EU segments for 2025. Trucks (307,460) and buses (38,238) are printed in the release; the van total is our calculation from the 2024 base and the published 8.8% fall, so it is approximate.
  2. The 2024 comparator (1,950,163) sums ACEA's published 2024 totals for vans, trucks and buses.
  3. The forecast is Daimler Truck's published 2026 guidance for EU30 heavy trucks, which is a narrower scope (30 countries, heavy segment only) than the headline.
  4. Scope caution: "Europe" here means the EU27 as ACEA reports it; adding the UK, Norway and Switzerland would raise the total. Value figures from paid publishers cover different geographies and segments, so we do not combine them with the unit count.
  5. Confidence is high for the unit count because ACEA is the official registration source and manufacturer filings point the same way.

Questions

How many commercial vehicles are sold in Europe each year?

About 1.79 million new vans, trucks and buses were registered in the EU in 2025, down from 1.95 million in 2024, based on ACEA data. Vans make up roughly four fifths of the total.

How many trucks were registered in the EU in 2025?

ACEA recorded 307,460 new trucks over 3.5 tonnes in 2025, 6.2% fewer than in 2024. Daimler Truck puts the EU30 heavy-duty market at 296,000 units.

What share of European commercial vehicles is electric?

In 2025 electrically chargeable vehicles took 11.2% of new EU van registrations, 4.2% of trucks and 23.8% of buses. In the fleet on the road the shares are far lower: 1.3% of vans and 0.3% of trucks.

Will the European truck market grow in 2026?

Daimler Truck expects the EU30 heavy-duty truck market at 290,000 to 330,000 units in 2026 against 296,000 in 2025, so flat to modestly up.

Sources

  1. New commercial vehicle registrations: vans -8.8%, trucks -6.2%, buses +7.5% in 2025, ACEA, 29 January 2026.
  2. New commercial vehicle registrations: vans +8.3%, trucks -6.3%, buses +9.2% in 2024, ACEA, 28 January 2025.
  3. Report – Vehicles on European roads 2026, ACEA, 15 January 2026.
  4. Daimler Truck with strong year-end cash flow and rising order momentum, Daimler Truck AG, 12 March 2026.
  5. TRATON GROUP records total unit sales of around 305,500 vehicles in 2025 in a weak market environment, TRATON SE, 20 January 2026.
  6. Europe Light Commercial Vehicles Market Size & Share Analysis, Mordor Intelligence, updated 11 September 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.