Global data centre construction market size 2025

Global data centre construction was worth $144bn to $228bn in 2025, depending on the publisher, with hyperscalers alone on track to spend $800bn-plus on capex in 2026. Here are the construction, capacity and cost figures from Arizton, GMI, Turner & Townsend, Cushman & Wakefield and JLL.

Indicative estimateResearched 2 November 20267 linked sources
Market size 2025
$186bn
Range
$144bn–$228bn
Forecast
$324bn by 2031 (Arizton) or $435bn by 2035 (GMI)
Growth
6.8%–14.5% a year, depending on publisher

Market size

No official body measures data centre construction worldwide, so the headline rests on two paid-report publishers that disagree. Arizton values global data centre construction investment at $144bn in 2025, up about 56% on 2024, and forecasts $324bn by 2031 (14.5% a year). Global Market Insights (GMI) puts the 2025 market at $227.6bn, reaching $434.7bn by 2035 (6.8% a year). We publish the midpoint, about $186bn, as the headline and the two figures as the range.

Spending is better documented. Business Insider's tally of company filings, republished by Hargreaves Lansdown, has Amazon, Alphabet, Meta, Microsoft and SpaceX on track to spend $803bn to $828bn of capital expenditure in 2026, with Amazon at about $220bn and Microsoft about $170bn. That capex includes servers and chips, which sit outside construction budgets. JLL estimates hyperscaler capex of up to $1 trillion across 2024–2026 and a roughly $3 trillion data centre infrastructure "supercycle".

MeasureFigurePeriodSource
Global data centre construction investment$144bn2025Arizton
Global data centre construction market$227.6bn2025GMI
Hyperscaler capex (five companies)$803bn–$828bn2026Business Insider via HL
US data centre construction starts, year to date$98.5bnJan–Aug 2026ConstructConnect
Operational capacity, Americas / EMEA43.4 GW / 11.4 GW2026 reportCushman & Wakefield
Under construction, Americas / EMEA25.3 GW / 2.7 GW2026 reportCushman & Wakefield
New capacity expected worldwidenearly 100 GW2026–2030JLL

What drives the cost

  • Cost per watt keeps rising. Turner & Townsend's 2026–27 index, covering 62 markets, found average cost per watt up 13% year on year across North American and European markets. The US averages $12.08 per watt; Tokyo ($18.28), Osaka ($17.15) and Zurich ($15.93) are the most expensive. AI-ready US facilities cost about 10% more, and the most advanced run at $14 to $16 per watt.
  • Labour and power are the constraints. 81% of Turner & Townsend's 401 respondents say skilled labour is constrained. Cushman & Wakefield puts the average wait for a large grid connection at 4.4 years globally. JLL found 57% of projects were delayed in 2025.
  • The US is the centre of activity. ConstructConnect counted 153 US data centre starts worth $98.5bn in the first eight months of 2026, 24% of all non-residential building starts; the average project rose from $507m in 2025 to $1.18bn. GMI puts US construction at $59.5bn in 2025.
  • Demand outruns supply. JLL expects global capacity to roughly double to about 200 GW by 2030, with occupancy near 97% and AI rising from about 25% of demand in 2025 to about 50% by 2030.

How this estimate was made

  1. The headline is the midpoint of Arizton's $144bn and GMI's $227.6bn for 2025: about $186bn (our calculation). Neither publisher discloses enough method to prefer one; the gap most likely reflects whether fit-out, land and owner-operated hyperscale sites are counted.
  2. Confidence is low because the only global value estimates come from paid-report publishers and differ by about 58%.
  3. Capex, cost-per-watt and capacity figures come from company filings as reported, Turner & Townsend, Cushman & Wakefield and JLL. They describe the market from different angles and cannot be added together.
  4. Cushman & Wakefield's 2026 report gives Americas and EMEA capacity but no APAC or global total in the article we read.

Questions

How big is the global data centre construction market?

Between $144bn (Arizton) and $228bn (GMI) in 2025. The two publishers use different scopes, so we headline the midpoint of about $186bn.

How much does it cost to build a data centre?

Turner & Townsend's 2026–27 index puts the US average at $12.08 per watt, with AI-ready facilities at $14 to $16 per watt. Tokyo is the most expensive market at $18.28 per watt.

How much are hyperscalers spending on data centres?

Amazon, Alphabet, Meta, Microsoft and SpaceX are on track for $803bn to $828bn of capital expenditure in 2026, according to Business Insider's tally of filings, including Amazon at about $220bn and Microsoft at about $170bn.

Sources

  1. Global data center construction market: investment, power capacity and area, Arizton Advisory & Intelligence, 30 June 2026.
  2. Data center construction market size and forecast, Global Market Insights, undated (2025 base year).
  3. Data centre construction cost index 2026–27, Turner & Townsend, 22 October 2026.
  4. Global Data Center Market Comparison 2026, Cushman & Wakefield, 29 May 2026.
  5. JLL's 2026 Global Data Center Outlook: navigating the AI supercycle, Data Center Frontier (reporting JLL), 8 January 2026.
  6. AI hyperscalers are expected to finish the year spending $828 billion on capex, Hargreaves Lansdown (Business Insider), 30 October 2026.
  7. October 2026 data center report: spending reaches $98.5 billion YTD, ConstructConnect, 29 September 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.