Market size
Brazil's instant payment system Pix moved R$35.36 trillion in 2025, across 79.8 billion transactions, according to Banco Central do Brasil (BCB) data reported by Metrópoles. Value rose 33.6% from R$26.24 trillion in 2024 and transaction numbers rose 25.7% from 63.5 billion. The BCB's second Relatório de Gestão do Pix, published in August 2026, confirms the same growth rates and "almost 80 billion" transactions.
Cards are the other large digital rail. The card industry body ABECS reported R$4.5 trillion of card payments in 2025 (up 10.1%) over 48.1 billion transactions: R$3.1 trillion on credit, R$1.0 trillion on debit and R$397 billion on prepaid cards. Adding the two gives about R$39.9 trillion and 128 billion transactions (our calculation). The two scopes differ: Pix value includes transfers between individuals and companies, while ABECS counts purchases only, so the Pix figure is not purely "payments".
| Measure | 2024 | 2025 | Change | Source |
|---|---|---|---|---|
| Pix value | R$26.24 trillion | R$35.36 trillion | +33.6% | BCB via Metrópoles |
| Pix transactions | 63.5 billion | 79.8 billion | +25.7% | BCB via Metrópoles |
| Card value (credit, debit, prepaid) | about R$4.1 trillion | R$4.5 trillion | +10.1% | ABECS |
| Card transactions | about 45.6 billion | 48.1 billion | +5.4% | ABECS |
| Pix share of retail transactions, H2 | – | 54.7% | +24.3% in count | BCB retail statistics |
The 2024 card figures are back-calculated from ABECS growth rates (our calculation).
Market structure
- Pix dominates by count. In the second half of 2025 Pix made up 54.7% of the 78.4 billion retail payment transactions tracked by the BCB; cards 30.4%, boletos 7.6% and cheques 0.5%. Pix carried 28.6% of the R$68.2 trillion moved and TED transfers 34.7%, because TED handles large-value business payments.
- Small tickets. The average Pix transaction was R$456 in H2 2025. In 2025, 71% of Pix transactions were for R$100 or less, and 43% were from individuals to businesses, up 4 percentage points on 2024 and 37 points on 2020.
- Business use is growing. Individuals' share of Pix payers fell from 55.0% in November 2020 to 44.0% in September 2025. Pix's share of value across Pix, boleto, TED, DOC, TEC and cheques rose from 22.1% in January 2023 to 41.2% in September 2025 (BCB monetary policy report, December 2025).
- Cards shift to credit. Credit card value grew 14.5% in 2025, debit only 0.2% and prepaid 4.4%. Debit is losing everyday purchases to Pix.
- Monthly run-rate. Pix handled 5.4 billion transactions worth R$1.7 trillion in September 2025 alone, against 15.9 million transactions in its first month, November 2020.
How this estimate was made
- The headline is the BCB's 2025 Pix total (R$35.36 trillion, 79.8 billion transactions) as reported by Metrópoles in February 2026 from the BCB's public statistics. The growth rates match the BCB's own Relatório de Gestão do Pix (August 2026), so two BCB publications agree.
- The upper bound adds ABECS's R$4.5 trillion of card purchases. We did not add boleto, TED or cash, so this is a Pix-plus-cards measure, not total payments.
- 2024 card values and counts are our back-calculation: R$4.5 trillion divided by 1.101 and 48.1 billion divided by 1.054.
- The forecast is our own scenario, not a published forecast: 79.8 billion Pix transactions growing at the 2025 rate of 25.7% gives about 100 billion in 2026. The BCB publishes no official projection.
- Shares of payment instruments come from the BCB's Estatísticas de Pagamentos de Varejo for H2 2025, as reported by LetsMoney; the BCB page itself was not fetched.
Questions
How much money moves through Pix each year?
Pix moved R$35.36 trillion in 2025 across 79.8 billion transactions, up 33.6% and 25.7% respectively on 2024, according to Banco Central do Brasil data.
How big is the card payments market in Brazil?
ABECS reported R$4.5 trillion of card payments in 2025, up 10.1%, with R$3.1 trillion on credit cards, R$1.0 trillion on debit and R$397 billion on prepaid cards, over 48.1 billion transactions.
What share of payments in Brazil are made by Pix?
Pix accounted for 54.7% of retail payment transactions in the second half of 2025, against 30.4% for cards and 7.6% for boletos. By value its share was 28.6%, because large transfers still go by TED.
Sources
- Pix bate recorde em 2025 e movimenta R$ 35,4 trilhões, Metrópoles (Banco Central do Brasil data), 7 February 2026.
- Volume de transações via Pix aumentou 25,7% em 2025 ante 2024, mostra BC, Diário do Comércio / Agência Estadão (BCB Relatório de Gestão do Pix), 10 August 2026.
- Pix lidera com 54,7% das transações no Brasil no 2º semestre de 2025, LetsMoney (BCB Estatísticas de Pagamentos de Varejo), 8 April 2026.
- Relatório de Política Monetária, dezembro 2025: box on Pix, Banco Central do Brasil, December 2025.
- Setor de cartões movimenta R$ 4,5 trilhões em 2025, alta de 10,1% ante 2024, Folha de Pernambuco (ABECS data), 11 February 2026.