Market size
The only recent published estimate of the Indian edtech market we could verify is from the paid-report publisher IMARC, which puts it at $3.63bn in 2025 and $4.60bn in 2026, with K-12 the largest sector at 43% and individual learners 49% of end users. At about ₹85 to the dollar that is roughly ₹30,900 crore (our calculation; IMARC gives only dollars).
That is far below the figures that circulated during the funding boom. A 2022 India Briefing article, using Statista data from 2020, projected $10.4bn for 2025 (K-12 $4.3bn, test preparation $3.99bn, online certification $1.38bn, skill development $0.73bn). We treat that as a pre-boom projection, not a measurement; it is why confidence is low.
Company accounts give a floor: PhysicsWallah's operating revenue crossed ₹3,000 crore in FY25, up about 55%, and upGrad reported gross revenue of ₹1,943 crore.
| Measure | Figure | Period | Source |
|---|---|---|---|
| India edtech market | $3.63bn | 2025 | IMARC |
| Pre-boom projection for 2025 | $10.4bn | made 2020 | Statista via India Briefing |
| PhysicsWallah operating revenue | over ₹3,000 crore (+55%) | FY25 | Entrackr |
| upGrad gross revenue | ₹1,943 crore | FY25 | Entrackr |
| Edtech equity funding | $568m, 29 deals | 2024 | Inc42 |
Segments: keep the scopes apart
- K-12 is the biggest segment on every measure: 43% of market value in 2025 (IMARC) and $3.6bn, or 51%, of the $7.1bn invested in Indian edtech between 2021 and 2026 (Tracxn).
- Test preparation drew $1.1bn of funding over 2021–2026 (Tracxn). PhysicsWallah is the largest listed-track player; its enrolments rose from 3.6 million in FY24 to 5 million in FY25, with offline centres now a major share of revenue.
- Higher education and upskilling drew $1.2bn (higher education tech) and $1.8bn (continued learning) over the same period. upGrad turned EBITDA positive in FY25 (₹15 crore) and cut its net loss 51% to ₹274 crore; international business is 20% to 25% of its revenue.
Funding has collapsed
- Inc42 counts $4.6bn raised in 2021, $2.44bn in 2022, $283m in 2023 and $568m in 2024. Tracxn's 2021 figure is $4.3bn; the two trackers use different deal definitions.
- Two rounds, PhysicsWallah ($210m) and Eruditus ($150m), were almost 62% of 2024's total.
- Only $214m was raised in the first eight months of 2026 across 36 rounds, against 368 rounds in 2021.
- Venture Intelligence (via Outlook Business) counted $120m across 11 deals in the first half of 2025, up from $22m a year earlier.
How this estimate was made
- The headline is IMARC's 2025 figure because it is the only current, fetchable estimate of the whole market. It is a paid report with an undisclosed method, so we rate confidence low.
- We found no current Redseer or other consultancy sizing we could read in full; the widely quoted $10.4bn is a 2020 Statista projection reported by India Briefing in 2022, shown only as a contrast.
- For a floor we added the FY25 revenues of PhysicsWallah (over ₹3,000 crore) and upGrad (₹1,943 crore gross) and converted to dollars at ₹85, about $580m, consistent with a market of a few billion dollars.
- The forecast is IMARC's $33.31bn by 2034 at 27.9% a year. Given the funding data above, we would treat that growth rate as optimistic.
- Funding figures mix sources (Inc42, Tracxn, Venture Intelligence), which define deals differently; we name the source next to each number.
Questions
How big is the edtech market in India?
IMARC estimates India's edtech market at $3.63bn in 2025 (roughly ₹30,900 crore), growing to $4.60bn in 2026. Older projections of $10bn or more for 2025 have not materialised.
How much funding do Indian edtech start-ups raise?
Indian edtech start-ups raised $568m in 2024, up from $283m in 2023 but down from $4.6bn in 2021, according to Inc42. Tracxn counted only $214m in the first eight months of 2026.
Which are the largest edtech companies in India?
By FY25 revenue, PhysicsWallah (over ₹3,000 crore operating revenue) and upGrad (₹1,943 crore gross revenue) are the largest reporting companies. Byju's, once the largest, is in insolvency proceedings.
Which edtech segment is biggest in India?
K-12, with 43% of 2025 market value according to IMARC and 51% of the sector's equity funding between 2021 and 2026 according to Tracxn.
Sources
- India edtech market size, share, trends and forecast 2026–2034, IMARC Group, updated 27 October 2026.
- India's edtech sector moves from funding-led growth to model-led consolidation: Tracxn, Entrepreneur India, 4 September 2026.
- At $568 Mn, edtech funding continues to sulk in 2024, revival anticipations timid, Inc42, 4 January 2025.
- Indian edtech start-ups make a comeback with 5x funding surge in H1 2025, Outlook Business, 15 September 2025.
- Exclusive: PhysicsWallah revenue crosses Rs 3,000 Cr in FY25, cuts losses by 80%, Entrackr, 25 August 2025.
- upGrad turns EBITDA positive in FY25, reports Rs 1,943 Cr gross revenue, Entrackr, 30 October 2025.
- Profiling India's edtech industry: a multi-billion dollar opportunity, India Briefing, 9 June 2022 (2020 data).