the decision pattern.TDP.

UK fibre broadband market size 2026

Full fibre reached 24.9 million UK homes (82%) by January 2026 and 12.4 million premises were connected, a 47% take-up rate, according to Ofcom. Openreach has passed 23 million premises and altnets 19.7 million, with heavy overlap between them.

High confidenceResearched 2 November 20267 linked sources
Market size 2026
12.4 million full fibre connections
Range
12.4m connections in use; 24.9m homes (82%) able to get full fibre
Forecast
25m premises on Openreach's network by end of 2026, 30m by 2030
Growth
+1.8m connections and +1.2m homes covered in the six months to January 2026

Market size

Ofcom's Connected Nations update for spring 2026 is the official measure. By January 2026, full fibre was available to 24.9 million UK homes, or 82% of the 30.5 million residential premises, up 1.2 million in six months. Gigabit-capable networks of any kind, including cable, reached 89%, or 27.1 million homes.

Availability is not the same as use. Ofcom counts 12.4 million full fibre connections across homes and businesses, a take-up rate of 47%, after 1.8 million were added in six months. Against the 29.3 million fixed broadband lines Ofcom recorded for the fourth quarter of 2025, full fibre now carries about 42% of UK broadband lines (our calculation; the two figures have different reference dates).

MeasureFigureDate / source
Homes able to get full fibre24.9m (82%)January 2026, Ofcom
Gigabit-capable coverage27.1m homes (89%)January 2026, Ofcom
Full fibre connections in use12.4m (47% take-up)January 2026, Ofcom
All fixed broadband lines29.3mQ4 2025, Ofcom via TelecomLead
Openreach full fibre footprint23m premisesMarch 2026, BT results
Altnet full fibre footprint19.7m premisesEnd 2025, Point Topic/INCA

Who is building it

  • Openreach is the largest builder. BT's results for the year to March 2026 show 23 million premises passed, 4.8 million of them built in that year, with 8.8 million premises connected and take-up above 38%. The target is 25 million by December 2026 and 30 million by 2030; in January 2025 the footprint was 17 million.
  • Altnets cover 19.7 million premises. Point Topic and INCA count 19.7 million premises passed by independent networks at the end of 2025, up 20%, with 3.5 million live connections (up 32%) and an average take-up of 18%. Altnets spent over £2bn of capital in 2025 and raised over £3bn of external funding.
  • Overlap is large. Openreach's 23 million plus the altnets' 19.7 million far exceeds Ofcom's 24.9 million homes covered, so many premises can choose between two or more fibre networks (our observation; dates and definitions differ).
  • CityFibre is the largest altnet. It had passed 4.7 million premises and connected 848,000 customers by December 2025, up 64%, with 2025 revenue of £170m (up 27%) and a £2.3bn financing package. Its goal is more than 8 million premises through consolidation; there were six altnet deals in 2025.
  • Nations differ. In July 2025 full fibre reached 95% of premises in Northern Ireland, 79% in England, 78% in Wales and 71% in Scotland.

How this estimate was made

  1. The headline is Ofcom's January 2026 count of 12.4 million full fibre connections, because it measures what customers actually buy. Coverage (24.9 million homes) is given alongside it as the addressable base.
  2. Ofcom's July 2025 report, as summarised by thinkbroadband, gives the previous reading (23.7 million premises, 78%, 42% take-up).
  3. Operator figures from BT, Point Topic/INCA and CityFibre describe structure only; they are not added together because they overlap and use different dates.
  4. The 42% share of all broadband lines is our calculation from the sourced numbers.
  5. No official money value of the UK full fibre market was found, so this page measures connections and coverage rather than revenue. Confidence is high because the headline comes from the regulator and matches operator filings.

Questions

How many UK homes can get full fibre broadband?

24.9 million homes, or 82% of UK residential premises, as of January 2026 according to Ofcom. Gigabit-capable coverage, which also counts cable, was 89%.

How many people use full fibre in the UK?

Ofcom counted 12.4 million full fibre connections in January 2026, a take-up rate of 47% of premises that can get it. That compares with about 29.3 million fixed broadband lines in total.

Who are the biggest fibre broadband networks in the UK?

Openreach, with 23 million premises passed by March 2026 and 8.8 million connected. Altnets together pass 19.7 million premises; the largest, CityFibre, had 4.7 million premises and 848,000 customers at end 2025.

When will the UK fibre rollout finish?

Openreach aims for 25 million premises by the end of 2026 and 30 million by 2030. Ofcom still counted 39,000 premises without decent fixed or fixed wireless broadband in January 2026.

Sources

  1. Connected Nations update: Spring 2026, Ofcom, 13 May 2026.
  2. Ofcom Connected Nations report 2025: fixed line, thinkbroadband, November 2025 (July 2025 data).
  3. Point Topic / INCA annual report 2026, Point Topic, 11 March 2026.
  4. BT FY revenue down 3%, record FTTP build, Advanced Television, 21 May 2026.
  5. A record year for UK broadband build and usage, Openreach, 6 January 2025.
  6. CityFibre report 848k broadband users as FTTP covers 4.7 million UK premises, ISPreview, 22 January 2026.
  7. UK telecom market 2025: mobile revenues reach £14.5bn, fixed voice declines to £4.07bn, TelecomLead, 17 April 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.