the decision pattern.TDP.

US footwear market size 2025

US footwear sales held steady at about $90bn in 2025, according to Circana's retail tracking, while the FDRA puts consumer spending at $121bn. Prices rose and pairs sold fell. About 2 billion pairs were imported and only 25 million made in the US.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2025
$90bn
Range
$90bn–$121bn
Forecast
about $90bn in 2026 (Circana expects a broadly flat year)
Growth
roughly flat in 2025, with units down in the low single digits

Market size

Circana, which tracks US retail sales of footwear, reports that US footwear sales held steady at $90bn in 2025. Dollar sales were roughly flat on the year while units fell in the low single digits, so higher prices and a more premium mix carried revenue. In the fourth quarter, dollars rose 2% and average prices 8%.

The Footwear Distributors and Retailers of America (FDRA), whose members account for about 98% of US footwear sales, puts consumer spending on footwear at $121bn in 2025. That gives a range of $90bn to $121bn. The gap is mainly one of scope: Circana measures the retail sales it tracks, while the FDRA figure is a total for consumer spending and is likely to include channels Circana does not cover.

MeasureValuePeriodSource
US footwear retail sales$90bn2025Circana
US consumer spending on footwear$121bn2025FDRA
Pairs importedabout 2.015 billion2025FDRA
Pairs made in the USabout 25 million2025FDRA
Imported pairs per US-made pairabout 812025FDRA
Dollar sales changeup 1%first half 2026Circana

What drives it

  • Price, not volume. Circana reports dollar growth of 1% in both the first quarter and the first half of 2026, with fewer pairs sold. Its analyst Beth Goldstein called 2026 a "slow growth environment" and said price increases remain a challenge.
  • Performance shoes lead. Performance footwear rose 6% in dollars in 2025, with running and walking each up 9%. In the first half of 2026 running rose 13% in both value and volume.
  • Fashion is soft. Fashion footwear fell 2% in 2025. Boat shoes (up 35%), high-shaft boots (up 14%) and ballerinas (up 8%) were the exceptions.
  • Almost everything is imported. FDRA data shows about 2.015 billion pairs imported in 2025, an average of six pairs per person, against about 25 million made at home. Of 197 US footwear factories in 2024, 55.8% had fewer than 10 employees.
  • Sourcing is moving away from China. China still shipped 964 million pairs to the US in 2025, but its share fell to a 35-year low. Vietnam supplied 574 million pairs, Indonesia 194 million and Cambodia 105 million (up 50%). China's share of import volume is about 48% by our calculation (964 million divided by 2.015 billion).

How this estimate was made

  1. The headline is Circana's $90bn, because it is a tracked retail measure published each year with consistent category detail.
  2. The top of the range is the FDRA's $121bn consumer spending figure, which we read via a September 2026 report by Portugal's trade agency AICEP and footwear association APICCAPS, not on the FDRA's own site.
  3. We did not combine the two figures; they measure different scopes.
  4. The 2026 forecast is our reading of Circana's statement that it expects the year to end relatively flat. It is not a published dollar forecast.
  5. The China import share is our calculation from FDRA pair counts.

Questions

How big is the US footwear market?

Circana puts US footwear sales at $90bn in 2025, roughly flat on 2024. The FDRA estimates total consumer spending on footwear at $121bn.

Are US footwear sales growing?

Only slowly. Dollar sales rose 1% in the first half of 2026 on higher prices while units fell, and Circana expects 2026 to end relatively flat.

How many shoes does the US import?

About 2.015 billion pairs in 2025, according to the FDRA, against about 25 million pairs made in the US.

Where does the US import shoes from?

China remains the largest supplier, with 964 million pairs in 2025, followed by Vietnam (574 million) and Indonesia (194 million). China's share is at a 35-year low.

Sources

  1. Circana issues Q4 2025 footwear industry pulse report, MR Magazine, 5 February 2026.
  2. US footwear industry delivers modest first-quarter growth, Circana, 4 May 2026.
  3. US footwear sales rise slightly in the first half, World Footwear, 2 September 2026.
  4. Americanos gastam 121 mil milhões de dólares em calçado num ano, Portugal Global (AICEP), 4 September 2026.
  5. China remains top US footwear supplier but market share hits 35-year low, World Footwear, 9 April 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.