the decision pattern.TDP.

Europe fragrances market size 2025

European retail sales of fragrances and perfumes are €17.1bn, according to Cosmetics Europe, about 15.5% of a €110bn cosmetics market in 2025. Fragrance grew 8.9% in 2024, the fastest category, but leading makers report a slowdown.

Medium confidenceResearched 2 November 20265 linked sources
Market size 2025
€17.1bn
Range
Single trade-body estimate; Cosmetics Europe gives €17.1bn for both 2024 and 2025
Forecast
No published value forecast; Puig expects fragrance growth to keep normalising in 2026
Growth
8.9% in 2024; flat to slower in 2025

Market size

Cosmetics Europe, the industry's trade association, puts European retail sales of fragrances and perfumes at €17.1bn, citing its Market Performance 2025 report. Its scope is the EU-27 plus Norway, Switzerland and the UK. Fragrance is the fourth-largest category after skin care, toiletries and hair care.

The same €17.1bn figure was reported for 2024, when fragrance grew 8.9%, the fastest of any category, and made up 16.5% of a €104bn market. On the current page the total market is €110bn for 2025, so fragrance's share falls to about 15.5% (our calculation). Either the category was flat in 2025 while the wider market grew, or the page pairs a 2024 category value with a 2025 total; Cosmetics Europe does not say which. There is no second independent estimate, so we give a single figure rather than a range.

CategoryRetail salesSource
Skin care€32.3bnCosmetics Europe (2025 report)
Toiletries€26.4bnCosmetics Europe (2025 report)
Hair care€20.3bnCosmetics Europe (2025 report)
Fragrances and perfumes€17.1bnCosmetics Europe (2025 report)
Decorative cosmetics€13.6bnCosmetics Europe (2025 report)
Total cosmetics and personal care€110bn (2025); €104bn (2024)Cosmetics Europe

What the companies report

  • Puig's fragrance sales still grew. Puig's Fragrance and Fashion division had 2025 revenue of €3,646m, 72% of the group's €5.04bn, with like-for-like growth of 6.4%. Its EMEA region earned €2,752m, up 5.5%.
  • The fragrance cycle is cooling. Puig's chief executive, Marc Puig, expects fragrance market growth to "continue to normalise" in 2026.
  • Selective beauty barely grew. L'Oréal says the selective (prestige) beauty market grew about 1% in 2025. Its Luxe division, whose Yves Saint Laurent Libre is the world's top-selling feminine fragrance, grew 2.8% like-for-like and "strongly outpaced the market in Europe", with gains in the DACH and Spain–Portugal clusters.
  • Europe outperformed other regions for L'Oréal. L'Oréal's European sales rose 4.4% like-for-like in 2025, ahead of group growth of 4% on sales of €44.05bn.
  • Large national markets. Cosmetics Europe ranks Germany (€18.0bn), the UK (€14.7bn), France (€14.5bn), Italy (€12.8bn) and Spain (€11.8bn) as the largest cosmetics markets. It does not split fragrance by country.

How this estimate was made

  1. The headline is Cosmetics Europe's €17.1bn category value, the only official-grade figure we found for European fragrance sales.
  2. We checked that the five category values add to €109.7bn, which matches the €110bn 2025 total (our calculation).
  3. Fragrance's 2025 share of 15.5% is our calculation: €17.1bn divided by €110bn. The 2024 share of 16.5% is as reported.
  4. Company results from Puig and L'Oréal point to slower growth in 2025, which is consistent with a flat category value, but they cover company sales rather than the market.
  5. Missing: an explicit 2025 growth rate for fragrance from Cosmetics Europe, a country split, and any published forecast. We have not used paid-report estimates.

Questions

How big is the European fragrance market?

Cosmetics Europe puts European retail sales of fragrances and perfumes at €17.1bn, about 15.5% of a €110bn cosmetics market in 2025. It covers the EU-27, Norway, Switzerland and the UK.

Is the fragrance market in Europe still growing?

Fragrance grew 8.9% in 2024, the fastest category. Growth slowed in 2025: Puig's fragrance division grew 6.4% and L'Oréal says selective beauty overall grew about 1%.

What share of European cosmetics is fragrance?

About 16.5% in 2024 as reported, and about 15.5% on the 2025 total (our calculation). Skin care and toiletries are larger.

Which country is the largest beauty market in Europe?

Germany, at €18.0bn of cosmetics and personal care sales, followed by the UK (€14.7bn) and France (€14.5bn).

Sources

  1. Our Industry, Cosmetics Europe, updated 21 October 2026.
  2. Cosmetics Europe: European beauty market, Premium Beauty News, 24 June 2025.
  3. Puig hits €5bn revenue but forecasts fragrance slowdown in 2026, CosmeticsDesign-Europe, 19 February 2026.
  4. L'Oréal outperformed global beauty market in 2025 with €44bn in sales, CosmeticsDesign-Europe, 16 February 2026.
  5. Annual Report 2025: L'Oréal Luxe, L'Oréal, 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.