the decision pattern.TDP.

Global freight forwarding market size 2025

The global freight forwarding market was worth €208.1bn (about $240.7bn) in 2025, up 4.4% in real terms, according to Transport Intelligence. DSV, Kuehne+Nagel and DHL each book over $33bn of logistics revenue. Here are the market, forecast and top-forwarder figures.

Medium confidenceResearched 2 November 20266 linked sources
Market size 2025
€208.1bn (about $240.7bn)
Range
€208.1bn is the only forwarding-specific estimate; the wider third-party logistics market is $1,300.6bn (Armstrong & Associates)
Forecast
€233bn by 2030 (Transport Intelligence)
Growth
4.4% in 2025 in real terms; 2.3% a year (2025–2030)

Market size

Transport Intelligence (Ti), the main specialist analyst of the sector, values the global freight forwarding market at €208.1bn in 2025, about US$240.7bn, up 4.4% in real terms. Sea freight forwarding grew 4.6% and air freight forwarding 4.1%, with Asia-Pacific exports the main driver in both modes. Ti expects growth to slow to 2.5% in 2026, taking the market to €213.4bn, and to reach €233bn by 2030, a compound rate of 2.3% a year.

Freight forwarding is one slice of third-party logistics. Armstrong & Associates (A&A) puts global 3PL revenue at $1,300.6bn for 2025, of which Asia Pacific was $487.5bn, North America $376.5bn and Europe $229.7bn. That wider scope includes contract logistics, domestic transport and warehousing, so the two figures should not be compared directly.

MeasurePeriodFigureSource
Global freight forwarding market2025€208.1bn, +4.4% realTransport Intelligence
Global freight forwarding market2026 forecast€213.4bn, +2.5%Transport Intelligence
Global freight forwarding market2030 forecast€233bnTransport Intelligence
Global 3PL revenue (all segments)2025$1,300.6bnArmstrong & Associates
Global logistics costs2025$12,957bn, 11.0% of GDPArmstrong & Associates

Leading players

A&A's 2026 ranking, based on 2025 gross logistics revenue, ocean TEUs and air tonnes, puts three European groups well ahead of the field.

  • DSV became the largest forwarder by revenue after absorbing DB Schenker in 2025: $37.4bn of gross logistics revenue, 3.70 million TEUs and 2.01 million air tonnes. Group revenue was DKK 247bn and EBIT rose 24.8% to DKK 19.6bn, but the operating margin fell from 9.6% to 7.9% as Schenker was consolidated.
  • Kuehne+Nagel shares first place in A&A's combined ranking with $33.8bn of gross logistics revenue, 4.33 million TEUs and 2.03 million air tonnes. Its own filing shows net turnover of CHF 24.5bn (down 1%), gross profit of CHF 8.8bn (up 2%), EBIT down 25% to CHF 1.24bn and air volumes up 7% to 2.2 million tonnes.
  • DHL Global Forwarding and Supply Chain is third with $35.5bn of revenue, 3.27 million TEUs and 1.77 million tonnes.
  • Sinotrans moves the most sea freight of any forwarder (4.93 million TEUs) on $13.6bn of revenue. Nippon Express, CEVA, Expeditors, C.H. Robinson, KLN, GEODIS, Cosco Shipping Logistics and Maersk Logistics complete the top ten.
  • Concentration is modest. The top three forwarders' combined gross revenue of about $107bn (our calculation) equals roughly 44% of Ti's market value, but their revenue also includes contract logistics and road freight, so their true forwarding share is lower.

What is changing

  • Rates, not volumes, drive revenue. Kuehne+Nagel's turnover fell 1% while air volumes rose 7%, a sign of lower freight rates. Ti's 4.4% is in real terms, stripping out rate effects.
  • Capacity shocks. Ti reports that conflict in the Middle East cut global air cargo capacity by 22% in early 2026, which is why it expects slower growth this year.

How this estimate was made

  1. The headline is Ti's €208.1bn for 2025, published June 2026. Ti is the only analyst we found that sizes freight forwarding specifically rather than logistics as a whole, so there is no second estimate to build a range from.
  2. The dollar conversion (about $240.7bn) is the one Ti itself uses as reported by PortCalls Asia; we did not convert at our own rate.
  3. A&A's $1,300.6bn global 3PL figure is included to show the wider scope but is not part of the range. Its top-25 revenue figures are gross logistics revenue, which include non-forwarding business.
  4. DSV and Kuehne+Nagel figures come from their FY2025 results. The top-three share of about 44% is our calculation from A&A revenue divided by Ti's dollar market value, and overstates the forwarding share for the reason given above.
  5. The forecast (€233bn by 2030, 2.3% a year) is Ti's own. Confidence is medium: one specialist source, corroborated in direction by company filings but not by an independent second market estimate.

Questions

How big is the global freight forwarding market?

€208.1bn, or about $240.7bn, in 2025 according to Transport Intelligence, up 4.4% in real terms. Sea forwarding grew 4.6% and air forwarding 4.1%.

Who is the largest freight forwarder in the world?

By gross logistics revenue, DSV ($37.4bn in 2025) after buying DB Schenker. Kuehne+Nagel ties for first in Armstrong & Associates' combined ranking with the most air tonnage (2.03 million) among the top three, while Sinotrans moves the most containers (4.93 million TEUs).

How fast will freight forwarding grow?

Transport Intelligence expects 2.5% growth in 2026 to €213.4bn and €233bn by 2030, a compound rate of 2.3% a year, slower than the 4.4% of 2025.

How does freight forwarding compare with the wider logistics market?

Armstrong & Associates estimates global third-party logistics revenue at $1,300.6bn in 2025 and total logistics costs at $12,957bn, or 11% of world GDP. Freight forwarding at about $240.7bn is therefore under a fifth of 3PL revenue.

Sources

  1. Global freight forwarding market reaches €208bn in 2025 amid structural shift to steady growth, Transport Intelligence, 8 June 2026.
  2. Global freight forwarding market to reach €233B by 2030 – Ti Insight, PortCalls Asia, 12 June 2026.
  3. A&A's Top 25 Global Freight Forwarders List – 2026, Armstrong & Associates, updated 22 July 2026.
  4. Global 3PL market size estimates, Armstrong & Associates, 2025 data, undated.
  5. DSV FY2025 results show impact of Schenker, Transport Intelligence, 5 February 2026.
  6. Kuehne+Nagel ad hoc announcement: full-year 2025 results, Kuehne+Nagel, 4 March 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.