Market size
Great Britain's gas distribution market is four regulated companies running eight licensed networks: Cadent (four networks), SGN (Scotland and Southern), Northern Gas Networks (NGN) and Wales & West Utilities (WWU). Their income is set by Ofgem's RIIO-GD2 price control (April 2021 to March 2026), so "market size" here means the revenue they recover through transportation charges.
Adding the three networks that publish revenue in audited accounts gives £3,963m for the year to 31 March 2025: Cadent £2,172m, SGN £1,267.6m and NGN £523.6m. WWU's revenue is not stated in the documents we could read, so we estimate it from its share of Ofgem-reported spending (about 11%–12% of the sector). That gives a combined sector revenue of about £4.5bn in 2024/25, within a range of £4.4bn to £4.6bn. Revenue fell at all three reporting networks because Ofgem allowances were lower than in 2023/24.
| Network | Revenue 2024/25 | Revenue 2023/24 | Regulatory asset value | Customers |
|---|---|---|---|---|
| Cadent | £2,172m | £2,277m | £13.1bn | 11m homes and businesses |
| SGN | £1,267.6m | £1,375.3m | £7.68bn | over 6m |
| Northern Gas Networks | £523.6m | £538.1m | not disclosed | not stated |
| Wales & West Utilities | about £0.5bn–£0.6bn (our estimate) | not found | not disclosed | 2.5m |
What the regulator allows
- RIIO-GD2 spending is running above allowance. Ofgem's annual report for 2024/25 shows the four GDNs forecasting £10.96bn of total expenditure over the five years against an adjusted allowance of £10.45bn (2018/19 prices), 4.8% over. Cadent is 7.7% over and SGN 7.6% over; NGN and WWU are under.
- RIIO-GD3 is larger. Ofgem's final determinations of 4 December 2025 provide £14.8bn of upfront funding for gas distribution from April 2026 to March 2031 (2023/24 prices), including £6.5bn for mains replacement. Baseline totex is £14.6bn, £2.5bn below what the companies asked for but £1.8bn above the draft determination.
- Returns are set lower. The RIIO-GD3 cost of equity allowance is 6.12%, with a semi-nominal WACC of 5.18%. Ofgem will also depreciate new gas assets faster, adding about £10 a year to a typical dual-fuel bill by 2031.
- Capital spending is the growth engine. Cadent invested £909m in 2024/25 and replaced 1,751km of mostly cast-iron mains; SGN invested £620.4m and replaced 1,013km; WWU replaced 410km.
How this estimate was made
- Revenue for Cadent, SGN and NGN is taken directly from their 2024/25 annual reports and accounts; all three report on a 31 March year end.
- WWU's revenue was not in its stakeholder report or RNS notice. We estimated it two ways: by scaling NGN's revenue to WWU's four-year totex (£993m versus £927m, giving about £560m), and by assuming WWU's revenue share equals its 11.7% share of sector totex (giving about £525m). Both methods are our calculation, hence the £4.4bn–£4.6bn range and the £4.5bn midpoint.
- The year-on-year change is our calculation on the three reporting networks: £3,963m in 2024/25 against £4,190m in 2023/24, a fall of 5.4%.
- Ofgem figures are in 2018/19 prices (RIIO-GD2 report) or 2023/24 prices (RIIO-GD3), while company revenue is nominal. They are shown separately and not added together.
- Missing: a single Ofgem table of allowed revenue by network for 2024/25 (it sits in a spreadsheet we did not read), NGN's and WWU's RAV, and customer numbers for NGN.
Questions
How big is the UK gas distribution market?
About £4.5bn of regulated revenue in 2024/25 (our estimate), of which Cadent took £2,172m, SGN £1,267.6m and NGN £523.6m, with Wales & West making up the rest.
Who owns the UK gas distribution networks?
Four companies hold the eight licences: Cadent (East of England, London, North West, West Midlands), SGN (Scotland and Southern England), Northern Gas Networks (North East, Yorkshire and northern Cumbria) and Wales & West Utilities (Wales and South West England).
How much will gas networks spend under RIIO-GD3?
Ofgem's final determinations fund £14.8bn of expenditure between April 2026 and March 2031 in 2023/24 prices, including £6.5bn for replacing iron mains, at a 6.12% cost of equity.
Is the gas distribution market growing or shrinking?
Revenue at the three largest networks fell about 5% in 2024/25, but spending allowances rise under RIIO-GD3, from an adjusted £10.45bn over five years in GD2 (2018/19 prices) to £14.6bn–£14.8bn in GD3 (2023/24 prices).
Sources
- RIIO-2 Gas Distribution: annual report 2024 to 2025, Ofgem, 15 January 2026.
- RIIO-2 Gas Distribution annual report 2024-25 (main report), Ofgem, January 2026.
- RIIO-2 Gas Distribution annual report 2024-25: Appendix, Ofgem, January 2026.
- RIIO-3 Final Determinations: Overview document, Ofgem, 4 December 2025.
- RIIO-3 Final Determinations: Gas Distribution annex, Ofgem, 4 December 2025.
- Cadent Gas Ltd Annual Report and Accounts 2024/25, Cadent Gas Limited, July 2025.
- SGN Annual Report and Financial Statements 2025, Scotia Gas Networks, 31 July 2025.
- Northern Gas Networks Limited Annual Report and Financial Statements 2025, Northern Gas Networks, approved 23 July 2025.
- Annual Stakeholder Report 2025, Wales & West Utilities, 2025.