the decision pattern.TDP.

Germany heat pump market size 2025

Germany sold 299,000 heating heat pumps in 2025, up 55%, making them the best-selling heating technology for the first time with almost half of a 627,000-unit market. BWP expects about 332,500 units in 2026 and 480,500 by 2030 on current policy.

High confidenceResearched 2 November 20265 linked sources
Market size 2025
299,000 heating heat pumps sold
Range
299,000 heating units; 348,500 including 49,500 hot-water heat pumps
Forecast
332,500 units in 2026 and 480,500 by 2030 (BWP business-as-usual scenario)
Growth
up 55% year on year (2025); up 40% in the first half of 2026

Market size

The German heat pump industry association BWP and the heating industry association BDH both report that 299,000 heating heat pumps were sold in Germany in 2025, 55% more than in 2024. For the first time heat pumps outsold every other heating technology: BDH counts the whole heating appliance market at about 627,000 units, down 12% and the lowest in 15 years, so heat pumps took roughly 48% of it (our calculation).

A further 49,500 hot-water heat pumps were sold, up 20%. Adding them gives about 348,500 units in total (our calculation). Air-to-water units made up 95% of heating heat pump sales; ground-source units were 16,000, or 5%.

No association publishes a euro market value. The nearest proxy is the federal heating subsidy: BWP records about €5.4bn of BEG commitments in 2025, which it says triggered about €21.2bn of investment across all subsidised heating systems, not heat pumps alone.

MeasureFigurePeriod and source
Heating heat pumps sold299,000 (+55%)2025, BWP and BDH
Hot-water heat pumps sold49,500 (+20%)2025, BWP
All heating appliances soldabout 627,000 (−12%)2025, BDH
KfW funding commitments for heat pumpsover 288,000 (+91%)2025, BWP
Installed stockabout 1.9 millionend 2025, BWP
Heating heat pumps sold, first half194,500 (+40%)H1 2026, BDH

What drives it

  • Subsidy and the Building Energy Act. Funding is only available for existing buildings, which took almost 80% of sales. BWP's study splits 2025 at about 243,300 units in modernisation (81%) and 55,700 in new build (19%). KfW issued more than 288,000 funding commitments for heat pumps in 2025.
  • Gas is no longer growing. In the first half of 2026 the total heating market rose 19% to 352,000 units, with heat pumps up 40% to 194,500, gas up 1% to 134,000, oil down 11% to 9,500 and biomass down 1% to 14,000. BDH expects about 700,000 appliances for the full year.
  • A sizeable supply chain. About 100,000 people work in the value chain; BWP projects 160,000 to 230,000 by 2030.
  • Policy risk is the main brake. BWP estimates that replacing the current BEG scheme with a flat-rate subsidy would cut sales by 20% to 40%, to about 262,000 units in 2026 instead of 332,500.

How this estimate was made

  1. The headline is the 2025 sales count of 299,000 heating heat pumps, reported identically by BWP (via Solarserver, 27 January 2026) and BDH (press release, 1 February 2026).
  2. The upper figure in the range adds BWP's 49,500 hot-water heat pumps. This is our addition; the associations report the two categories separately.
  3. The share of the heating market (about 48%) is our division of 299,000 by BDH's 627,000 total.
  4. Forecasts are BWP's published scenarios from its Branchenstudie 2026: business-as-usual gives 332,500 units in 2026 and 480,500 in 2030; the ambitious "ZIEL" scenario gives 403,468 and 912,315. We quote the business-as-usual case as the headline forecast.
  5. No euro market value exists in any source we fetched, so the page is sized in units. Confidence is high because two industry bodies and KfW funding data agree on volumes for the same year.

Questions

How many heat pumps were sold in Germany in 2025?

299,000 heating heat pumps, up 55% on 2024, according to BWP and BDH. A further 49,500 hot-water heat pumps were sold, up 20%.

What share of German heating sales are heat pumps?

Almost half. BDH counted about 627,000 heating appliances sold in 2025, so heat pumps' 299,000 units were about 48% (our calculation). In the first half of 2026 heat pumps reached 194,500 of 352,000 units.

What is the forecast for heat pump sales in Germany?

BWP's 2026 industry study projects 332,500 units in 2026 and 480,500 in 2030 under current policy, or up to 912,315 in 2030 if all policy levers favour heat pumps. BDH's first-half data (up 40%) are running ahead of the base case.

How many heat pumps are installed in Germany?

About 1.9 million at the end of 2025, of which about 1.6 million are air-to-water units, according to BWP. The association expects about 3.4 million by 2030 on current trends.

Sources

  1. BWP: Wärmepumpen-Absatz um 55 Prozent in 2025 gestiegen, Solarserver (reporting Bundesverband Wärmepumpe data), 27 January 2026.
  2. Jahresbilanz: Heizungsabsatz fällt auf niedrigsten Stand seit 15 Jahren, Bundesverband der Deutschen Heizungsindustrie (BDH), 1 February 2026.
  3. Heizungsmarkt legt zu (first-half 2026 figures), Bundesverband der Deutschen Heizungsindustrie (BDH), 11 August 2026.
  4. BWP-Branchenstudie 2026, Bundesverband Wärmepumpe, March 2026.
  5. BWP-Branchenstudie 2026: Erwartungen an Wärmepumpen-Markt gedämpft, Solarserver, 30 March 2026.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.