the decision pattern.TDP.

US herbal supplements market size 2024

US retail sales of herbal supplements reached a record $13.23bn in 2024, up 5.4%, according to the American Botanical Council's Herb Market Report. Direct-to-consumer channels took 57% of sales; psyllium, elderberry and ashwagandha led in mainstream stores.

High confidenceResearched 2 November 20268 linked sources
Market size 2024
$13.2bn
Range
$12.3bn–$13.9bn
Forecast
$19.4bn by 2032
Growth
5.4% year on year (2024); 6.5% a year (2026–2032)

Market size

The most authoritative measurement is the American Botanical Council's annual Herb Market Report, published in HerbalGram in September 2025 using Nutrition Business Journal (NBJ) and SPINS data. It puts US retail sales of herbal dietary supplements at a record $13.23bn in 2024, up 5.4% or about $680m on 2023. That followed 4.4% growth in 2023 (to $12.55bn) and a 1.9% fall in 2022. Sales have almost doubled from $6.92bn in 2015.

Paid-report publishers sit below this. MarkNtel Advisors values the US market at $12.29bn in 2025, rising to $19.38bn by 2032; its channel coverage is narrower than NBJ's, which includes multi-level marketing and online direct sales. Grand View Research puts the global market at $42.3bn in 2024 with North America at 26.3%, about $11.1bn for the region (our calculation). The top of our range, $13.9bn, is our own roll-forward of the ABC figure to 2025.

MeasureValuePeriod / source
US herbal supplement retail sales$13.23bn, +5.4%2024, ABC Herb Market Report (NBJ data)
Direct-to-consumer (online, direct mail, MLM)$7.50bn, +6.8%2024, ABC/NBJ
Natural, health food and specialty stores$3.12bn, +2.7%2024, ABC/NBJ
Mass market stores$2.61bn, +4.9%2024, ABC/NBJ
Total US dietary supplement market$69.3bn2024, NBJ
US herbal supplements (paid report)$12.29bn2025, MarkNtel Advisors

Channels and leading herbs

  • Direct-to-consumer dominates. The DTC segment was $7.5bn in 2024, 57% of the total (our calculation). In 2015 it was $3.36bn, while natural retail went from $2.4bn to $3.1bn.
  • Mainstream leaders. In SPINS mainstream data (Circana-sourced), psyllium led for a third year at about $290m despite a small decline; elderberry fell 21% to $145.2m; ashwagandha rose 13.8% to $144.5m; turmeric was $141.8m; beet root jumped 67.7% to $117m.
  • Natural channel leaders. Turmeric led at $37.1m (down 1.7%), followed by functional mushrooms ($27.6m, +14.4%), CBD ($26m, down 17%), elderberry ($22.8m) and ashwagandha ($21.2m). "Algae (other)" more than doubled to $19.5m.
  • Users. The Council for Responsible Nutrition's 2024 survey of 3,194 adults found 75% of Americans use supplements. Ashwagandha use among supplement users rose from 2% in 2020 to 8% in 2024.
  • Share of the wider market. NBJ values all US dietary supplements at $69.3bn in 2024, so herbs are about 19% (our calculation). NBJ expects the whole category to reach almost $87bn by 2028.

How this estimate was made

  1. The headline is the ABC Herb Market Report figure of $13.23bn for 2024 because it is the industry's standard measurement, built on NBJ channel surveys plus SPINS scanner data, and reported consistently by the three trade titles we read.
  2. The lower bound of the range, $12.3bn, is MarkNtel's 2025 estimate; it is lower than ABC's 2024 figure, most likely because it excludes some direct-sales channels. We show it rather than hide the disagreement.
  3. The upper bound, $13.9bn, is our own roll-forward: $13.23bn grown by the 2024 rate of 5.4% for one more year. It is not a published 2025 measurement; ABC will publish 2025 sales in late 2026.
  4. The forecast and growth rate are MarkNtel's (6.49% a year, 2026–2032, to $19.38bn). Grand View's global 8.9% CAGR is a different scope, shown for context.
  5. Confidence is high because the headline rests on two independent data providers (NBJ and SPINS) and the paid-report estimates fall within about 10% of it.

Questions

How big is the herbal supplements market in the United States?

US retail sales of herbal supplements were $13.23bn in 2024, up 5.4%, according to the American Botanical Council's Herb Market Report based on Nutrition Business Journal data. Our roll-forward for 2025 is about $13.9bn.

What are the best-selling herbal supplements in the US?

In mainstream stores psyllium led in 2024 at about $290m, followed by elderberry ($145.2m), ashwagandha ($144.5m), turmeric ($141.8m) and beet root ($117m), per SPINS data in the ABC report. In natural stores turmeric led at $37.1m.

Where are herbal supplements sold?

Direct-to-consumer channels (online, direct mail and multi-level marketing) accounted for $7.5bn of the $13.23bn total in 2024. Natural and specialty stores sold $3.12bn and mass-market stores $2.61bn.

How fast is the US herbal supplements market growing?

Sales grew 5.4% in 2024 and 4.4% in 2023 after a 1.9% fall in 2022. MarkNtel Advisors forecasts 6.49% a year growth from 2026 to 2032, taking the market to $19.38bn.

Sources

  1. US herbal supplements sales hit a record $13.2 billion in 2024, NutraIngredients-USA, 10 September 2025.
  2. U.S. sales of herbal supplements exceed $13 billion at retail, Nutraceuticals World, 11 September 2025.
  3. ABC report shows herbal supplement sales topped $13 billion in 2024, SupplySide Supplement Journal, 11 September 2025.
  4. U.S. sales of herbal supplements increased in 2023, Vitamin Retailer, 17 September 2024.
  5. CRN survey shows consistent supplement usage with increase of specialty product use over time, Council for Responsible Nutrition, 29 October 2024.
  6. Nutrition Business Journal report provides market intelligence on $69.3 billion supplement industry, Nasdaq / ACCESS Newswire, 21 May 2025.
  7. US herbal supplements market to flourish at a CAGR of around 6.49% during 2026-32, MarkNtel Advisors, 31 August 2026.
  8. Herbal supplements market size, share and trends report, 2033, Grand View Research, June 2025.

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.