the decision pattern.TDP.

UK hotel market size 2026

UK hotels generate about £29.7bn a year in revenue according to IBISWorld's 2026 estimate. Trading was flat to slightly positive in 2025: London occupancy 82.5%, regional RevPAR £79, and £5.0bn of hotel investment, with profit squeezed by payroll and business rates.

Indicative estimateResearched 2 November 20265 linked sources
Market size 2026
£29.7bn
Range
£29.7bn is the only aggregate revenue estimate found; trading data from Knight Frank and PwC used as checks
Forecast
RevPAR up 1.5%–1.9% in 2026 (PwC and Knight Frank)
Growth
revenue down 1.1% in 2026 (IBISWorld); regional RevPAR up 1.9% in 2025

Market size

The only aggregate revenue figure we found for the UK hotel industry is IBISWorld's estimate of £29.7bn for 2026, down 1.1% on the year. IBISWorld also reports growth of 17.1% a year over 2021 to 2026, but that period starts from the Covid trough, so it says more about recovery than trend. No official body (ONS, VisitBritain or UKHospitality) publishes a hotels-only revenue total, and IBISWorld's forecast figures sit behind a paywall, so confidence is low.

The trading picture is much better documented. Knight Frank's review of 2025 shows London occupancy at 82.5%, up 1.2 points, with rates flat for the year and RevPAR up 1.5%. Regional UK RevPAR rose 1.9% to £79, almost all of it in the second half. Total revenue per available room across UK hotels grew 2.0%.

MeasureLondonRegional UKPeriodSource
Occupancy82.5% (+1.2 pts)79% in H2 (+1.2 pts)2025Knight Frank
RevPAR+1.5%£79 (+1.9%)2025Knight Frank
GOPPAR£111.60 (-0.5%)£37 (flat)2025Knight Frank
GOP margin41.1% (-1.1 pts)30.3% (-0.5 pts)2025Knight Frank
RevPAR forecast+1.8%+1.5%2026PwC
Industry revenue£29.7bn (UK total, -1.1%)2026IBISWorld
Investment volume£3.0bn (+25%)£2.0bn (from £3.3bn)2025Savills

What is driving it

  • A second-half recovery in 2025. London RevPAR grew 4.4% in the second half after a weak first half; regional RevPAR went from -0.4% in H1 to +3.8% in H2, helped by leisure and wellness demand.
  • Costs are rising faster than revenue. Payroll accounted for 75% of the increase in operating costs in 2025, and payroll per available room is about 30% above 2019. Knight Frank expects higher business rates to erode margins across all segments in 2026.
  • Investment held up. Savills counts £5.0bn of UK hotel deals in 2025, 15% below 2024 but 7.8% above the ten-year average of £4.7bn. London took £3.0bn, and single assets made up 85% of volume as portfolio deals fell to just over £750m.
  • 2026 is expected to be slow but positive. PwC forecasts RevPAR growth of 1.8% in London and 1.5% in the regions for 2026; Knight Frank's forecast is 1.9% and 1.8%. Both expect new supply to stay constrained.

How this estimate was made

  1. The headline is IBISWorld's £29.7bn industry revenue for 2026, because no other source gives a pound value for all UK hotels. IBISWorld is a paid-report publisher and the page shows only part of its data, so we rate confidence low.
  2. We did not build our own value estimate, because none of the sources we read publishes a UK-wide room count or average rate.
  3. Trading figures come from Knight Frank's UK Hotel Trading Performance Review (published February 2026) as reported on its own site and by HOTELS Magazine. They cover a sample of hotels, mostly branded and upscale, so they are indicators rather than a census.
  4. Investment figures are Savills' estimate for 2025. These are transaction values for buying hotels, a different measure from annual revenue, and should not be added to the headline.
  5. Missing: an official hotels-only turnover series, a UK room count for 2025, and IBISWorld's forecast and business counts, which are paywalled.

Questions

How big is the UK hotel market?

IBISWorld estimates UK hotel industry revenue at £29.7bn in 2026, down 1.1% on the year. It is the only aggregate value we found; official statistics do not publish a hotels-only total.

How did UK hotels perform in 2025?

Modestly. London occupancy reached 82.5% with rates flat and RevPAR up 1.5%; regional RevPAR rose 1.9% to £79. Profit per room slipped 0.5% in London to £111.60 and held at £37 in the regions, according to Knight Frank.

How much was invested in UK hotels in 2025?

Savills puts 2025 UK hotel investment at £5.0bn, 15% below 2024 but above the ten-year average of £4.7bn. London accounted for £3.0bn, up 25%.

What is the outlook for UK hotels in 2026?

PwC forecasts RevPAR growth of 1.8% in London and 1.5% in the regions; Knight Frank forecasts 1.9% and 1.8%. Both expect rising payroll and business rates to make profit growth harder than revenue growth.

Sources

  1. UK Hotel Trading Performance Review and Outlook, Knight Frank, 27 February 2026.
  2. The UK hotel sector posts H2 comeback in 2025, HOTELS Magazine, 3 March 2026.
  3. UK Hotels Forecast 2025–2026: Selective resilience, PwC UK, 13 November 2025.
  4. UK hotel investment reaches £5.0 billion in 2025, Savills, 2 January 2026.
  5. Hotels in the UK – Market Size (2013–2032), IBISWorld, 2026 (undated page).

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.