Market size
The International Federation of Robotics (IFR) counts 603,307 industrial robots installed worldwide in 2025, up 11% on 2024 and 9% above the previous record of 552,946 units set in 2022. The IFR puts the value of those robots at $18.6bn, also up 11%. That value covers the robot arm and controller only, without software, peripherals or system integration, which is why systems-level estimates run several times higher.
The operational stock reached 5,079,078 units in 2025, up 9%. The IFR expects 655,000 installations in 2026 (up 9%) and 806,000 in 2029, about 7% a year.
| Measure | 2024 | 2025 | Change | Source |
|---|---|---|---|---|
| Annual installations | 542,000 | 603,307 | +11% | IFR World Robotics 2026 |
| Market value (robots only) | about $16.8bn (our calculation) | $18.6bn | +11% | IFR World Robotics 2026 |
| Operational stock | 4,664,000 | 5,079,078 | +9% | IFR World Robotics 2026 |
| Asia installations | 74% share | 457,315 (76%) | +14% | IFR World Robotics 2026 |
| Europe installations | 85,000 | 73,054 | -14% | IFR World Robotics 2026 |
| Americas installations | 50,100 | 57,044 | +14% | IFR World Robotics 2026 |
The range of $14.8bn to $18.6bn reflects the gap between MarketsandMarkets' 2025 estimate of $14.8bn and the IFR's $18.6bn. ResearchAndMarkets sits between them at $17.6bn for 2025.
Regional picture
- China is the market. It installed 354,226 robots in 2025, up 20%, or 59% of the world total. Chinese suppliers held a 55% domestic share. The IFR expects Chinese demand to grow 5% to 10% a year to 2029.
- The United States overtook Japan. US installations rose 12% to 38,428 units. Japan fell 19% to 36,219, its lowest in a decade. South Korea installed about 30,000 (down 1%).
- Europe fell. EU installations dropped 11% to 60,500. Germany installed 24,842 units (down 8%), 41% of the EU total. Italy, France and Spain all fell.
- India is sixth. Almost 10,500 units were installed, up 15%; installations have grown 27% a year on average since 2020.
- Customer industries. Electrical and electronics took 142,235 units (up 10%), automotive 138,429 (up 10%, a new peak) and metal and machinery 108,571 (up 22%, an 18% share).
Why value estimates disagree
- Scope. The IFR's $18.6bn is the price of the robots alone. Reports that include software, grippers, vision and integration arrive at much larger numbers, which we have not used.
- Price per unit. Dividing the IFR value by its unit count gives an average of about $30,800 per robot (our calculation). Chinese-made robots are cheaper than Japanese or European ones, so the shift of demand towards China holds down value growth relative to unit growth.
- Publisher methods. MarketsandMarkets ($14.8bn in 2025, $20.8bn by 2032, 5.0% a year) and ResearchAndMarkets ($17.6bn in 2025, $39bn by 2035, 7.49% a year) use different base definitions and samples.
How this estimate was made
- The headline unit figure (603,307) and value ($18.6bn) come from the IFR's World Robotics 2026 executive summary, published 24 September 2026. The IFR compiles data from national robot associations and manufacturers.
- The range uses the IFR value as the top and MarketsandMarkets' $14.8bn as the bottom; both refer to 2025 and to robots as hardware. Systems-level estimates measure a different thing and are excluded.
- The 2024 value of about $16.8bn is our calculation: $18.6bn divided by 1.11, since the IFR reports 11% value growth. The IFR itself did not publish a 2024 dollar figure in the pages we read.
- The forecast is the IFR's own: 655,000 units in 2026 and 806,000 in 2029. The 7% a year is the IFR's stated average for 2026 to 2029. We have not projected the dollar value forward.
- Missing: a value breakdown by region. Confidence is high because the IFR count is filing-grade and the three value estimates fall within about 25% of each other.
Questions
How many industrial robots were installed in 2025?
603,307 industrial robots were installed worldwide in 2025, according to the IFR's World Robotics 2026 report. That is an 11% rise on 2024 and a new record, beating the 552,946 units of 2022.
How big is the industrial robot market in dollars?
The IFR values 2025 installations at $18.6bn, covering the robots themselves without software or integration. Paid-report publishers put the 2025 figure between $14.8bn (MarketsandMarkets) and $17.6bn (ResearchAndMarkets).
Which country buys the most industrial robots?
China installed 354,226 robots in 2025, 59% of the world total. The United States was second with 38,428, followed by Japan (36,219), South Korea (about 30,000) and Germany (24,842).
How fast will the industrial robot market grow?
The IFR forecasts 655,000 installations in 2026 (up 9%) and 806,000 in 2029, about 7% a year. Europe is forecast flat in 2026.
Sources
- Executive Summary World Robotics 2026 – Industrial Robots, International Federation of Robotics, September 2026.
- Five million robots now operate in factories globally, International Federation of Robotics, 24 September 2026.
- World Robotics 2026: United States press release, International Federation of Robotics, 24 September 2026.
- China installs 59% of new factory robots as EU installations fall 11%, The Next Web, 24 September 2026.
- Global robot demand in factories doubles over 10 years, International Federation of Robotics, 25 September 2025.
- Industrial Robotics Market – Industry Trends and Global Forecasts to 2035, ResearchAndMarkets via Business Wire, 17 June 2025.
- Industrial Robotics Market – Global Forecast to 2032, MarketsandMarkets, undated (2025 base year).