the decision pattern.TDP.

Global lithium-ion battery manufacturing market size 2025

The global lithium-ion battery market passed $150bn in 2025, up 20%, with about 2,280 GWh shipped and China making over 80%. Pack prices fell 8% to $108/kWh. Here are the volumes, prices, leading makers and forecasts, with sources.

Medium confidenceResearched 2 November 20267 linked sources
Market size 2025
$150bn+; 2,280 GWh shipped
Range
$150bn–$151bn (published); up to about $250bn at pack level (our check)
Forecast
$405bn by 2033 (Grand View); 6,012 GWh shipped by 2030 (EVTank)
Growth
20% by value and 47.6% by volume in 2025

Market size

The global lithium-ion battery market was worth more than $150bn in 2025, up 20% on 2024, according to an International Energy Agency report summarised by Mercom India. Grand View Research independently puts the 2025 market at $151.0bn. On volume, EVTank counts 2,280.5 GWh of lithium-ion batteries shipped worldwide in 2025, up 47.6%, of which EV batteries were 1,495.2 GWh, energy storage 651.5 GWh and small consumer cells 133.9 GWh. McKinsey, cited by Mercom, puts 2025 demand at nearly 1.6 TWh, so volume measures differ by definition.

Value grew far more slowly than volume because prices kept falling. BloombergNEF's 2025 survey puts the average pack price at $108/kWh, down 8%, with stationary storage at $70/kWh, battery electric vehicles at $99/kWh and China at $84/kWh. Multiplying EVTank's shipments by the BNEF average gives about $246bn (our calculation); this is a pack-level ceiling, not a measured market, and sits above the IEA figure because shipments include inventory and pack prices include integration.

MeasureFigurePeriod / source
Market valuemore than $150bn, up 20%2025, IEA via Mercom
Market value$151.0bn2025, Grand View Research
Shipments2,280.5 GWh, up 47.6%2025, EVTank
EV battery installations1,187 GWh, up 31.7%2025, SNE Research via CnEVPost
Average pack price$108/kWh, down 8%2025, BloombergNEF
China share of manufacturingwell over 80%2025, IEA via Mercom
China share of shipments82.8% (1,888.6 GWh)2025, EVTank
Manufacturing capacity3 TWh2024, IEA commentary

Market structure

  • China dominates supply. China made well over 80% of lithium-ion batteries in 2025 and holds nearly all LFP capacity (IEA). The EU and US make up most of the rest in similar shares. More than 70% of EVs produced outside China rely on Chinese batteries or components.
  • CATL leads. CATL sold 661 GWh of batteries in 2025 (541 GWh EV, 121 GWh storage), up 39%, on revenue of RMB 423.7bn and net profit of RMB 72.2bn. It had 772 GWh of capacity at end-2025 with 321 GWh under construction. SNE Research gives it 39.2% of EV battery installations, ahead of BYD (16.4%), LG Energy Solution (9.2%), CALB (5.3%) and Gotion (4.5%).
  • LFP is now the main chemistry. LFP powered over half of EV batteries and more than 90% of storage batteries in 2025, and averaged $81/kWh against $128/kWh for NMC (BNEF).
  • Storage is the fastest-growing segment. Storage shipments rose 76.2% in 2025 (EVTank) and storage pack prices fell 45% to $70/kWh, the first year storage was the cheapest segment.
  • Overcapacity. Capacity reached 3 TWh in 2024 against about 1 TWh of demand (IEA).

How this estimate was made

  1. The headline value is the IEA's "more than $150bn" for 2025, as reported by Mercom India. We could not read the IEA report directly, so we corroborated it with Grand View Research's independent $151.0bn estimate, which lands on the same figure.
  2. The volume headline is EVTank's 2,280.5 GWh of shipments. SNE Research's 1,187 GWh covers EV installations only, and McKinsey's roughly 1.6 TWh covers demand, so we report each with its scope.
  3. The range top comes from our own check: 2,280.5 GWh times $108/kWh is about $246bn. It overstates sales because shipments exceed installations and pack prices include modules and integration, so we treat it as a ceiling.
  4. The forecasts are Grand View's $405.4bn by 2033 (12.8% a year from 2026) and EVTank's 3,016.3 GWh for 2026 and 6,012.3 GWh for 2030. The two are not directly comparable and imply value per kWh keeps falling.
  5. Confidence is medium: two sources agree on value, but one is second-hand and the other is a paid report, and volume measures differ by 40% depending on definition.

Questions

How big is the global lithium-ion battery market?

More than $150bn in 2025, up 20%, according to the IEA, with Grand View Research independently estimating $151.0bn. About 2,280 GWh were shipped in 2025 according to EVTank.

How much do lithium-ion batteries cost per kWh?

BloombergNEF's 2025 survey puts the average pack price at $108/kWh, down 8%. Stationary storage packs cost $70/kWh, electric car packs $99/kWh, and Chinese packs averaged $84/kWh.

Who is the largest lithium-ion battery manufacturer?

CATL, which sold 661 GWh in 2025 and held 39.2% of global EV battery installations according to SNE Research. BYD was second at 16.4% and LG Energy Solution third at 9.2%.

What share of batteries does China make?

Well over 80% of lithium-ion batteries in 2025 according to the IEA. EVTank puts China's share of shipments at 82.8%, or 1,888.6 GWh.

Sources

  1. Global lithium-ion battery market surpassed $150 billion in 2025: IEA, Mercom India, 20 February 2026.
  2. Lithium-ion battery pack prices fall to $108 per kilowatt-hour despite rising metal prices, BloombergNEF, 9 December 2025.
  3. Global lithium-ion battery shipments hit 2,280.5 GWh in 2025, China accounts for 82.8%, ChinaEVHome (EVTank white paper), 15 January 2026.
  4. Global EV battery market share in 2025: full rankings and key takeaways, CnEVPost (SNE Research data), 4 February 2026.
  5. CATL posts 42% profit jump in 2025 amid strong EV battery sales, CnEVPost, 9 March 2026.
  6. Historic milestone: global battery demand topped 1 TWh for the first time last year, oEnergetice.cz (IEA commentary), 21 March 2025.
  7. Lithium-ion battery market size, share and trends report, Grand View Research, August 2026 (updated September 2026).

This is an independent desk estimate by The Decision Pattern, built from the public sources linked above and researched on 2 November 2026. The full report builds its own three-method model with the latest evidence, so its figures can differ.